The World Bank Report No: ISR951 Implementation Status & Results Indonesia Public Disclosure Copy Higher Education for Relevance and Efficiency (P085374) Operation Name: Higher Education for Relevance and Efficiency (P085374) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Last Modified Date: 05-Nov-2010 Country: Indonesia Approval FY: 2005 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Board Approval Date 09-Jun-2005 Original Closing Date 30-Jun-2011 Planned Mid Term Review Date 31-Dec-2008 Last Archived ISR Date 19-Feb-2010 Effectiveness Date 20-Dec-2005 Revised Closing Date 31-Dec-2012 Actual Mid Term Review Date 31-Oct-2008 Project Development Objectives Project Development Objective (from Project Appraisal Document) Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) Component Name Component Cost Higher education system reform and oversight 6.00 Grants for responsive and efficient allocation of resources 73.75 Overall Ratings Previous Rating Current Rating Public Disclosure Copy Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview 1. Solid progress has been made on Component 1 during the reporting period. The national accreditation body (BAN-PT) has shifted focus to institutional accreditation and plans are underway for benchmarking and recruitment of consultants to assist in drafting accreditation instruments. The Open University (UT) has discussed and agreed guidelines for I- MHERE support of its revitalization plans. By the end of this year a graduate tracer baseline will be established and standardized instruments for DGHE to undertake routine tracer studies will be prepared. A study on the modernization of the organization of DGHE is now underway with funding from GOI, with project support for technical assistance. The strengthening of Distance Learning Centres (DLCs) in six universities has started with a capacity development workshop for 46 representatives from across Indonesia in June 2010. The workshop was also supported by the Asia Pacific DLC through the provision of technical assistance and incremental operating costs. DGHE-IU will conduct procurementof Page 1 of 3 The World Bank Report No: ISR951 equipment aimed at increasing the quality and reliability of GDLN provision of the six selected DLCs. The education institution autonomy law (BHP law) has been cancelled and it will take some time for the full ramifications to be apparent. There are implications in this for subcomponents B.2a, B.2b and B.2c, especially in the funding mechanism which may slow Public Disclosure Copy project implementation. Essentially progress on this matter is outside the control of the project. 2 All Grants to be awarded under Component 2 have now been awarded. Due to some delays in procurement and the budget (DIPA) revisions, the grants under B.1 and B.2a have been extended by 18 months; however all will be completed by 2011, while sub-Component B.2c, Performance Based Contracts, will be completed by November, 2012. At the time of reporting disbursement has increased close to the agreed projection. 3 Progress against the supplementary indicators shows substantial achievement from baseline levels, though there are concerns over the lack of clarity in the size of the sample used. Some grantees did not use standardized instruments for collecting data of the indicators. Results Indicator Baseline Current End Target Indicator Baseline Current End Target Public Disclosure Copy Data on Financial Performance (as of 26-May-2010) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P085374 IBRD-47890 Effective 09-Jun-2005 02-Aug-2005 20-Dec-2005 31-Dec-2012 Disbursements (in Millions) Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed Page 2 of 3 The World Bank Report No: ISR951 P085374 IBRD-47890 0.00 0.00 0.00 0.00 0.00 Public Disclosure Copy Disbursement Graph Key Decisions Regarding Implementation 1. A cluster support network for grant recipients remains a high priority. DGHE-IU has agreed to provide necessary support to ensure all grantees build their procurement capacity. 2. The technical specifications of equipment bids remain an issue. DGHE-IU will provide support to HEI-IUs to develop equipment specification. The Bank will investigate the recruitment of a consultant to assist with the review of technical specifications. 3. DGHE has issued a letter advising the 7 autonomous universities (BHMNs) to conduct activities using the regulations which applied before the introduction of the BHP Law. Public Disclosure Copy Restructuring History Related Projects Page 3 of 3

Informations clés
Date d'adoption
Pays Indonésie
Source Banque mondiale