World Bank Group · Procurement Plan

Kyrgyz Republic - Reducing Technical Barriers for Entrepreneurship and Trade Project : procurement plan

World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

With dates revisions as of September 15, 2009 KYRGYZ REPUBLIC: REDUCING TECHNICAL BARRIERS FOR ENTREPRENEURSHIP AND TRADE PROJECT (H 247-KG) 51870 PROCUREMENT PLAN - CONSULTING SERVICES Comb. Draft RFP, Bank's Technical Technical Bank's NO to Receipt of Bank's NO to Bid Total Bid Est. Finaliz. of Req. Exp. of Tech/financia Contract Contract Bank's Bid Ref Type Method incl. TOR, NO to RFP Issued Proposal Eval. comb. Eval. Draft Contract No: (US$'000) TOR Interest l Eval. Signature Completion review Short List RFP Opening Report report Contract Signature Report 1. Technical Regulation Framework Component 1.1.1 International advisor to initiate and 01Nov06 29-Oct-07 1 CS 110.00 IND 13-Jun-06 13-Jun-06 23-Jun-06 n/a n/a n/a n/a 27-Jul-06 1-Aug-06 27-Oct-06 30-Oct-06 PR coordinate project activities signed completed 1.1.2 Local consultancy for the entire duration 31Oct06 31-Oct-10 2 CS 50.00 IND 17-Jun-06 17-Jun-06 27-Jun-06 n/a n/a n/a n/a 10-Oct-06 17-Oct-06 30-Oct-06 30-Oct-06 PR of the project employed at ad-hoc basis signed ongoing 1.1.3.a Consultancy and training to support the 28Feb08 15-Apr-08 19.85 10-May-07 15-May-07 2-Aug-07 n/a n/a n/a n/a 3-Aug-07 3-Aug-07 25-Feb-08 27-Feb-08 PR development of TRs in food processing signed completed 3 CS IND 1.1.3b - Consultancy on development of TRs 123.15 15-Oct-09 1-Nov-09 16-Nov-09 n/a n/a n/a n/a 31-Dec-09 14-Jan-10 15-Jan-10 30-Jan-10 6-Feb-10 20-Feb-10 PR 1.2.1a International expert to identify integrated 30Jul07 15-Aug-07 Info. system and set up of national WTO CS 24.00 IND 27-Apr-07 15-May-07 29-May-07 n/a n/a n/a n/a 29-Jun-07 n/a n/a n/a signed completed enquiry point 4 1.2.1b Local consultant to assist expert on item 31May07 31-Aug-07 CS 3.00 IND 11-Apr-07 20-Apr-07 2-May-07 n/a n/a n/a n/a 21-May-07 n/a n/a n/a 1.2.1 signed completed 2. Metrology and Standards Component 2.1.6 International consultant to assist in 01Mar07 15-Apr-07 5 program activities of the metrology CS 24.82 SSS 9-Feb-07 n/a n/a n/a n/a n/a n/a n/a n/a 2-Mar-07 4-Mar-07 PR signed completed infrastructure. 2.1.1; 2.1.9 Development of technical 6Jun08 20-Sep-09 6 specification for metrology equipment and CS 52.00 SSS 1-Mar-08 n/a n/a n/a n/a n/a n/a n/a n/a 6-May-08 28-May-08 PR signed completed training on uncertainty 06Jan08 31-Dec-08 7 2.2.2 Awareness campaign on standardization CS 18.35 CQ 5-Jun-07 12-Oct-07 12-Oct-07 n/a 19-Oct-07 10-Nov-07 n/a 20-Dec-07 n/a n/a n/a signed completed 2.2.5 Technical assitance for Development and 27Feb09 17-June-09 8 CS 1.00 IND n/a n/a n/a n/a n/a n/a n/a implementation of quality system for NISM signed completed 3. Accreditation Framework and Quality Enhancement Component 3.1.1 Consultancy to bring accreditation body in Financed by 9 compliance with int'l requirements CS 0.00 IND n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 1Apr07 ITC 3.1.2 Assessment of the accreditation body by 10 CS 27.00 IND 1-Apr-10 12-Apr-10 22-Apr-10 n/a n/a n/a n/a 6-May-10 n/a 8-May-10 n/a 18-Jun-10 25-Jul-10 international experts (TA) 3.1.5, 3.2.1, 3.2.3 Consultancy for selected 18Dec07 11 CS 27.50 SSS 12-Nov-07 12-Nov-07 n/a n/a n/a n/a n/a n/a n/a 21-Nov-07 23-Nov-07 23-Mar-08 PR testing labs signed 3.1.5, 3.3.1, 3.3.2 Consultancy for certifying 18Dec07 12 CS 27.50 SSS 12-Nov-07 12-Nov-07 n/a n/a n/a n/a n/a n/a n/a 21-Nov-07 23-Nov-07 23-Mar-08 PR bodies. signed 3.2.4, 3.3.3 Accreditation for selected testing labs and 2 13 certifying bodies according to int'l standards CS 79.50 CQ 15-May-10 15-Jun-10 30-Jun-10 n/a n/a n/a n/a n/a n/a 15-Jul-10 22-Jul-10 27-Jul-10 25-Sep-10 PR 3.4 Enterprise support for adoption of product 14 and quality management systems (matching 100.00 PR grant credit line) 4. Project Management and Implementation 12Feb08 15 4.6 Project audit CS 30.00 CQ 30-Oct-07 15-Nov-07 27-Nov-07 n/a n/a n/a n/a n/a 28-Jan-08 28-Jan-08 28-Jan-08 31-Oct-10 PR signed 16 4.3 Incremental operating expenses 135.00 TOTAL 852.67 With dates revisions as of September 15, 2009 KYRGYZ REPUBLIC: REDUCING TECHNICAL BARRIERS FOR ENTREPRENEURSHIP AND TRADE PROJECT PROCUREMENT PLAN - GOODS AND WORKS Contract Price Draft bidding Bank's NO to Bank's NO to Contract Bid No: Bid Ref Type Method Estimate Invitat. To Bidder Bid Opening Bid Eval. Report Contract Signature Bank's Review Docs and SPN bidding docs. Ctr. Awd. Completion (US$'000) 1. Technical Regulation Framework Component 1.1.4a Specialized literature for the TRAB G DC 10.00 n/a n/a n/a n/a n/a 15-Feb-07 On going 30Dec10 PR 24Jan08 1 1.1.4b Equipment for TRAB and expert committees G Shopping 19.65 9-Oct-07 n/a 12-Oct-07 26-Oct-07 3-Nov-07 n/a 21Nov07 completed 1.1.4c Development of website for the TRAB and equipment for its supporting G Shopping 8.58 4-Sep-07 n/a 28-Sep-07 26-Oct-07 3-Nov-07 n/a On going 31Oct10 1.1.6 Laboratory and related infrastructure equipment to 2 G ICB 250.00 15-Nov-09 30-Nov-09 14-Jan-10 14-Apr-10 13-Jul-10 28-Jul-10 28-Aug-10 26-Dec-10 PR support enforcement of training 1.2.2 a IT hardware and software to support establishment of the IIS on Technical Regulation and G ICB 800.00 10-Oct-09 25-Oct-09 9-Dec-09 9-Mar-10 7-Jun-10 22-Jun-10 23-Jul-10 20-Nov-10 PR WTO enquiry point on TBT and SPS 3 1.2.2.b IT equipment to establish the SPS WTO Enquiry 8Apr08 Point G Shopping 1.77 15-Feb-08 n/a 29-Feb-08 7-Mar-08 7-Mar-08 n/a 26Mar08 completed 2. Metrology and Standards Component 2.1.2; 2.1.3; 2.1.4 Metrology and calibration equipment 748.00 15-Mar-10 14-Apr-10 21-Apr-10 2-Jun-10 1-Aug-10 16-Aug-10 26-Aug-10 22-Feb-11 PR (parts, accessories, etalons, etc) 2.1.2; 2.1.3; 2.1.4.a Metrology and calibration equipment on mass G ICB 420.00 14-Nov-08 29-Nov-08 1-Dec-08 22-Jan-09 25-Mar-09 27-Apr-09 25May09 30-Dec-09 PR 4 2.1.2; 2.1.3; 2.1.4.b Metrology and calibration equipment on temperature 330.00 14-Nov-08 29-Nov-08 1-Dec-08 22-Jan-09 25-Mar-09 27-Apr-09 27May09 30-Dec-09 PR 2.1.2; 2.1.3; 2.1.4.c Stone tables to the laboratory of G Shopping 2.00 15-Oct-09 20-Oct-09 25-Oct-09 8-Nov-09 18-Nov-09 25-Nov-09 28-Nov-09 19-Dec-09 PR mass 2.1.5 Equipment for Upgrading and calibration of 5 G ICB 200.00 15-Nov-10 30-Nov-10 14-Jan-11 15-Apr-11 14-Jul-11 28-Jul-11 27-Aug-11 31-Oct-10 PR equipment and

Key facts
Organisation World Bank Group
Document type Procurement Plan
Adoption date
Source World Bank