Группа Всемирного банка · Procurement Plan

Kyrgyz Republic - Small Towns Infrastructure and Capacity Building Project : procurement plan for goods and works for 2008-2009

Всемирный банк
Открыть оригинал документа

Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.

Полный текст

52870 Agreed by the Recipient, dated 15 December, 2009 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Tash-Kumyr I W NCB 550,000 6/1/2007 N/A 7/6/2007 8/20/2007 9/24/2007 N/A 10/11/2007 10/21/2008 Post Review 1 Rehabilitation of road 4 km long in Tash- Kumyr Tash-Kumyr II W NCB 140,000 03.09.2007 N/A 9/7/2007 10/18/2007 11/30/2007 N/A 1/11/2008 1/21/2009 Post Review Rehabilitation of sewerage pumping 2 station of second up gradient in Tash- Kumyr Kyzyl Kiya 3 Post Review Emergency rehabilitation works W NCB 410,256 12/10/2006 N/A 12/18/2006 1/15/2007 2/1/2007 N/A 2/19/2007 5/19/2008 4 Tokmok Rehabilitation W NCB 510,000 1/13/2006 12/1/2007 12/26/2007 2/4/2008 3/14/2008 3/17/2008 4/17/2008 10/28/2008 of water supply system in Tokmok Post Review Cholpon Ata I 5 Water slow gravel filter W NCB 789,006 11/23/2007 N/A 11/23/2007 1/25/2008 3/7/2008 N/A 4/4/2008 4/14/2009 Post Review Cholpon Ata II 6 Water slow sand filter W NCB 877,791 11/23/2007 N/A 11/23/2007 1/25/2008 3/7/2008 N/A 4/1/2008 4/11/2009 Post Review Jalalabat Submersible pumps 7 Water tower construction W NCB 600,000 12/4/2006 N/A 12/4/2006 1/19/2007 3/20/2007 N/A 4/14/2007 4/24/2008 Post Review Production water meters; Balykchy Submersible pumps 8 2-nd and 3-nd stage pump stations Water distribution system W NCB 496,763 11/6/2006 N/A 11/6/2006 12/22/2006 1/22/2007 N/A 2/19/2007 2/29/2008 Post Review Production water meters Desinfection facilities Kant Submersible pumps Rehabilitation of well 9 2-nd and 3-nd stage pump stations Water distribution system W NCB 576,520 11/6/2006 N/A 11/6/2006 12/22/2006 1/22/2007 N/A 2/15/2007 2/25/2008 Post Review Production water meters Desinfection facilities Kara-Suu 2-nd and 3-nd stage pump stations Submersible pumps Rehabilitation of well 10 Water tower construction W NCB 412,333 12/4/2006 N/A 12/4/2006 1/19/2007 3/20/2007 N/A 4/16/2007 4/26/2008 Post Review Desinfection facilities Production water meters; Water distribution system Mailuu-Suu 2-nd and 3-nd stage pump stations Water treatment plant; 11 Production water meters; W NCB 714,150 11/5/2007 N/A 11/5/2007 12/20/2007 1/25/2008 N/A 2/27/2008 3/8/2009 Post Review Sewer pumps Rehabilitation of sewerage system Uzgen 12 W NCB 500,000 12/18/2006 N/A 12/18/2006 2/1/2007 3/20/2007 2/26/2007 4/18/2007 6/30/2008 Post Review Reservoir construction Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Kyzyl Kiya Civil works for transfer of water pipe line's 13 emergency districts within the W NCB 410,256 12/18/2006 N/A 12/18/2006 1/15/2007 2/1/2007 N/A 2/19/2007 4/24/2008 Post Review rehabilitation of water supply system in Kyzyl-Kya Sulyukta 14 Rehabilitation of water supply system W NCB 843,457 2/20/2008 N/A 2/22/2008 4/7/2008 6/2/2008 N/A 6/20/2008 6/30/2009 Post Review Nookat 15 Rehabilitation of water supply system W NCB 491,335.82 1/31/2009 N/A 2/13/2009 3/27/2009 6/25/2009 N/A 7/28/2009 8/8/2010 Post Review Shopokov 16 Rehabilitation of water supply system W NCB 262,009 2/20/2008 N/A 2/22/2008 4/7/2008 6/4/2008 N/A 6/30/2008 7/10/2009 Post Review Batken 17 Rehabilitation of sewerage system and clearing of public water supply utilities W NCB N/A N/A Post Review 846,132.00 1/30/2009 2/13/2009 3/27/2009 5/20/2009 6/30/2009 7/10/2010 Kok-Jangak 18 Rehabilitation of water supply system W NCB N/a N/A Post Review 477,981.00 1/30/2009 2/27/2009 4/13/2009 6/6/2009 7/1/2009 7/11/2010 Kara-Balta 19 Rehabilitation of water supply system W NCB N/A N/A Post Review 685,853.00 1/30/2009 2/27/2009 4/13/2009 6/8/2009 6/30/2009 7/10/2010 Equipment for municipal services in Kyzyl- 14 G Shopping 43,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 7/15/2007 8/9/2007 Post Review Kya Equipment for municipal services in 15 G Shopping 44,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/26/2007 8/1/2007 Post Review Nookat Equipment for municipal services in 16 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 2/22/2008 Post Review Batken Equipment for municipal services in Kok- 17 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 2/20/2008 Post Review Jangak 18 Equipment for municipal services in Talas G Shopping 90,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 2/14/2008 Post Review Equipment for municipal services in 19 G Shopping 83,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 1/16/2008 Post Review Sulukta Equipment for municipal services in 20 G Shopping 73,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 2/14/2008 Post Review Naryn Equipment for municipal services in Kara- 21 G Shopping 23,000 1/29/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 8/27/2007 Post Review Balta Equipment for municipal services in 22 G Shopping 23,000 1/20/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 8/10/2007 Post Review Shopokov Equipment for municipal services in 23 G Shopping 36,000 1/20/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 8/1/2007 Post Review Kochkor-Ata Equipment for municipal services in Kara- 34 G Shopping 97,000 1/20/2007 N/A 1/29/2007 2/12/2007 4/5/2007 N/A 4/9/2007 1/16/2007 Post Review Kol Equipment for municipal services in 35 G Shopping 44,000 1/29/2007 N/A 1/29/2007 2/12/2007 3/20/2007 N/A 3/29/2007 8/27/2007 Post Review Kerben Equipment for municipal services in Kara- 36 G Shopping 47,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 8/27/2007 Post Review Suu Equipment for municipal services in 37 G Shopping 44,000 29/01/07 N/A 29/01/07 12/02/07 20/03/07 N/A 29/03/07 7/8/2007 Post Review Isfana Equipment for municipal services in 38 G Shopping 93,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 2/20/2008 Post Review Tokmok Equipment for municipal services in 39 G Shopping 27,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 8/1/2007 Post Review Uzgen ARIS Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Signature Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Completion Review No: bidding docs Awd. Computer, Office Equipment and 40 G Shopping 37,500 5/30/2007 N/A 5/30/2007 6/13/2007 6/27/2007 N/A 5/7/2007 6/7/2007 Furniture 41 ARIS Building W Shopping 4,500 12/4/2007 N/A 12/4/2007 12/18/2007 1/29/2008 N/A 1/31/2008 3/20/2008 Post Review PIAP Support (computer equipment 42 for billing system in Uzgen and G Shopping 8,500 4/26/2007 N/A 4/26/2007 5/11/2007 5/22/2007 N/A 5/23/2007 6/23/2007 Post Review Tokmok) 43 PIAP Support G Shopping 15,000 6/1/2007 N/A 6/1/2007 6/15/2007 6/22/2007 N/A 6/27/2007 7/27/2007 Post Review 320,500 Supply of office furniture 1083.32 11/10/2008 11/10/2008 11/21/2008 11/24/2008 11/27/2008 12/26/2008 44 G Shopping N/A N/A Post Review Supply of office furniture 509.39 11/10/2008 11/10/2008 11/21/2008 11/24/2008 11/28/2008 12/28/2008 45 G Shopping N/A N/A Post Review Supply of office furniture 340.67 6/8/2009 6/8/2009 6/22/2009 6/25/2009 n/a 6/26/2009 7/3/2009 46 G Shopping N/A Post Review Supply of computer equipment 4036 6/26/2009 6/26/2009 7/15/2009 8/5/2009 n/a 8/7/2009 9/7/2009 for small towns (billing system) 47 G Shopping N/A Post Review PIAP support Supply of computer equipment 2,067.67 6/26/2009 6/26/2009 7/15/2009 8/5/2009 n/a 8/17/2009 9/17/2009 for municipal utilities 48 G Shopping N/A Post Review Manufacturing of the book 6,821.46 6/26/2009 6/26/2009 7/15/2009 7/29/2009 n/a 9/17/2009 12/4/2009 "Investments to life" 49 G Shopping N/A Post Review Supply of spechial technic: 76,499.00 7/13/2009 7/13/2009 7/27/2009 8/26/2009 n/a 8/27/2009 12/25/2009 loader-digger and excavator 50 G Shopping N/A Post Review within competition Supply of computer equipment 30,000.00 12/11/2009 12/11/2009 12/25/2009 1/15/2010 n/a 1/18/2010 2/17/2010 51 for Project units. G Shopping N/A Post Review Supply of computer equipment 5,000.00 12/11/2009 12/11/2009 12/25/2009 1/15/2010 n/a 1/18/2010 2/17/2010 52 for municipal water utilities G Shopping N/A Post Review "Vodokanals" in Small Towns TOTAL GOODS AND WORKS Agreed by the Recipient, dated 15 June, 2009 KYRGYZ REPUBLIC: Small Towns Infrastructure and Capacity Buiding Project (CREDIT NUMBER 4016-KG/GRANT NUMBER H139-KG) ORIGINAL ACTIVITIES UNDER THE PROJECT DATA UPDATED PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Tash-Kumyr I W NCB 550,000 06/01/2007 N/A 07/06/2007 08/20/2007 09/24/2007 N/A 10/11/2007 10/21/2008 Post Review 1 Rehabilitation of road 4 km long in Tash- Kumyr Tash-Kumyr II W NCB 140,000 03.09.2007 N/A 09/07/2007 10/18/2007 11/30/2007 N/A 01/11/2008 01/21/2009 Post Review Rehabilitation of sewerage pumping 2 station of second up gradient in Tash- Kumyr Kyzyl Kiya 3 Post Review Emergency rehabilitation works W NCB 410,256 12/10/2006 N/A 12/18/2006 01/15/2007 02/01/2007 N/A 02/19/2007 05/19/2008 Tokmok Rehabilitation 4 W NCB 510,000 01/13/2006 12/01/2007 12/26/2007 02/04/2008 03/14/2008 03/17/2008 04/17/2008 10/28/2008 of water supply system in Tokmok Post Review Cholpon Ata I 5 Water slow gravel filter W NCB 789,006 11/23/2007 N/A 11/23/2007 01/25/2008 03/07/2008 N/A 04/04/2008 04/14/2009 Post Review Cholpon Ata II 6 Water slow sand filter W NCB 877,791 11/23/2007 N/A 11/23/2007 01/25/2008 03/07/2008 N/A 04/01/2008 04/11/2009 Post Review Jalalabat Submersible pumps 7 Water tower construction W NCB 600,000 12/04/2006 N/A 12/04/2006 01/19/2007 03/20/2007 N/A 04/14/2007 04/24/2008 Post Review Production water meters; Balykchy Submersible pumps 8 2-nd and 3-nd stage pump stations Water distribution system W NCB 496,763 11/06/2006 N/A 11/06/2006 12/22/2006 01/22/2007 N/A 02/19/2007 02/29/2008 Post Review Production water meters Desinfection facilities Kant Submersible pumps Rehabilitation of wel 9 2-nd and 3-nd stage pump stations Water distribution system W NCB 576,520 11/06/2006 N/A 11/06/2006 12/22/2006 01/22/2007 N/A 02/15/2007 02/25/2008 Post Review Production water meters Desinfection facilities Kara-Suu 2-nd and 3-nd stage pump stations Submersible pumps Rehabilitation of well 10 Water tower construction W NCB 412,333 12/04/2006 N/A 12/04/2006 01/19/2007 03/20/2007 N/A 04/16/2007 04/26/2008 Post Review Desinfection facilities Production water meters; Water distribution system Mailuu-Suu 2-nd and 3-nd stage pump stations Water treatment plant; 11 Production water meters; W NCB 714,150 11/05/2007 N/A 11/05/2007 12/20/2007 01/25/2008 N/A 02/27/2008 03/08/2009 Post Review Sewer pumps Rehabilitation of sewerage system Uzgen 12 W NCB 500,000 12/18/2006 N/A 12/18/2006 02/01/2007 03/20/2007 02/26/2007 04/18/2007 06/30/2008 Post Review Reservoir construction Kyzyl Kiya Civil works for transfer of water pipe 13 line's emergency districts within the W NCB 410,256 12/18/2006 N/A 12/18/2006 01/15/2007 02/01/2007 N/A 02/19/2007 04/24/2008 Post Review rehabilitation of water supply system in Kyzyl-Kya Sulyukta 14 Rehabilitation of water supply system W NCB 843,457 02/20/2008 N/A 02/22/2008 04/07/2008 06/02/2008 N/A 06/20/2008 06/30/2009 Post Review Nookat 15 Rehabilitation of water supply system W NCB 433,299 02/13/2009 N/A 02/13/2009 03/27/2009 05/04/2009 N/A 05/25/2009 06/05/2010 Post Review Shopokov 16 Rehabilitation of water supply system W NCB 262,009 02/20/2008 N/A 02/22/2008 04/07/2008 06/04/2008 N/A 06/30/2008 07/10/2009 Post Review Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Batken 17 Rehabilitation of sewerage system and clearing of public water supply W NCB 705,861 02/13/2009 N/A 02/13/2009 03/27/2009 05/02/2009 N/A 05/23/2009 06/03/2010 Post Review utilities Kok-Jangak 18 Rehabilitation of water supply system W NCB 476,033 02/20/2009 N/a 02/20/2009 04/03/2009 05/06/2009 N/A 05/27/2009 06/08/2010 Post Review Kara-Balta 19 Rehabilitation of water supply system W NCB 680,617 02/20/2009 N/A 02/20/2009 04/03/2009 05/08/2009 N/A 05/29/2009 06/08/2010 Post Review Equipment for municipal services in Kyzy 14 G Shopping 43,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 07/15/2007 08/09/2007 Post Review Kya Equipment for municipal services in 15 G Shopping 44,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/26/2007 08/01/2007 Post Review Nookat Equipment for municipal services in 16 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 02/22/2008 Post Review Batken Equipment for municipal services in Kok 17 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 02/20/2008 Post Review Jangak 18 Equipment for municipal services in Talas G Shopping 90,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 02/14/2008 Post Review Equipment for municipal services in 19 G Shopping 83,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 01/16/2008 Post Review Sulukta Equipment for municipal services in 20 G Shopping 73,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 02/14/2008 Post Review Naryn Equipment for municipal services in Kara 21 G Shopping 23,000 01/29/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 08/27/2007 Post Review Balta Equipment for municipal services in 22 G Shopping 23,000 01/20/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 08/10/2007 Post Review Shopokov Equipment for municipal services in 23 G Shopping 36,000 01/20/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 08/01/2007 Post Review Kochkor-Ata Equipment for municipal services in Kara 34 G Shopping 97,000 01/20/2007 N/A 01/29/2007 02/12/2007 04/05/2007 N/A 04/09/2007 01/16/2007 Post Review Kol Equipment for municipal services in 35 G Shopping 44,000 01/29/2007 N/A 01/29/2007 02/12/2007 03/20/2007 N/A 03/29/2007 08/27/2007 Post Review Kerben Equipment for municipal services in Kara 36 G Shopping 47,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 08/27/2007 Post Review Suu Equipment for municipal services in 37 G Shopping 44,000 29/01/07 N/A 29/01/07 12/02/07 20/03/07 N/A 29/03/07 07/08/2007 Post Review Isfana Equipment for municipal services in 38 G Shopping 93,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 02/20/2008 Post Review Tokmok Equipment for municipal services in 39 G Shopping 27,000 20/01/07 N/A 29/01/07 12/02/07 05/04/07 N/A 09/04/07 08/01/2007 Post Review Uzgen ARIS Computer, Office Equipment and 40 G Shopping 37,500 05/30/2007 N/A 05/30/2007 06/13/2007 06/27/2007 N/A 05/07/2007 06/07/2007 Furniture 41 ARIS Building W Shopping 4,500 12/04/2007 N/A 12/04/2007 12/18/2007 01/29/2008 N/A 01/31/2008 03/20/2008 Post Review PIAP Support (computer equipment 42 for billing system in Uzgen and G Shopping 8,500 04/26/2007 N/A 04/26/2007 05/11/2007 05/22/2007 N/A 05/23/2007 06/23/2007 Post Review Tokmok) 43 PIAP Support G Shopping 15,000 06/01/2007 N/A 06/01/2007 06/15/2007 06/22/2007 N/A 06/27/2007 07/27/2007 Post Review PIAP Support (computer equipment for billing system in Kara- 44 G Shopping 4,000 07/03/2009 N/A 07/03/2009 07/17/2009 07/31/2009 N/A 07/31/2009 09/15/2009 Post Review Kol,Balykchy, Tash-Kumyr, Cholpon- Ata) PIAP Support (typographical 45 illustrated book about project G Shopping 10,000 07/10/2009 N/A 07/10/2009 07/24/2009 08/17/2009 N/A 08/19/2009 09/19/2009 Post Review activities within 4 years) Equipment for municipal services (2 46 excavators and 4 computers) component G Shopping 110,000 09/02/2009 N/A 09/02/2009 09/16/2009 09/21/2009 N/A 09/25/2009 12/25/2009 Post Review A1 TOTAL GOODS AND WORKS 124,000

Основные сведения
Тип документа Procurement Plan
Дата принятия
Источник Всемирный банк