Kyrgyz Republic - Bishkek and Osh Urban Infrastructure Project : procurement plan

World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

43365 Dated February 6, 2008 KYRGYZ REPUBLIC: Bishkek and Osh Urban Infrastructure Project PROCUREMENT PLAN - GOODS AND WORKS for 2008-2009 Bid Ref Type Method Contract Price Draft bidding Bank's No Invitat. To bidder Bid Opening Bid Bank's no Contract Contract Bank's Bid Estimate(US$) Docs and SPN objection to Eval.Report objection to Ctr. Signature Completion Review No: bidding docs Awd. Roads Archa-Beshik, Ak-Orgo, Ak-Ordo W NCB 616,000 04/04/2008 03/28/2008 04/04/2008 05/19/2008 06/27/2008 07/11/2008 07/31/2008 07/31/2009 PR Kalys-Ordo, Dordoi W NCB 490,286 04/11/2008 04/04/2008 04/11/2008 05/26/2008 07/04/2008 n/a 08/04/2008 08/04/2009 Kasym, Jenish, Tynchtyk W NCB 389,714 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/25/2008 n/a 08/15/2008 08/15/2009 Kara-Jigach, Altyn-Ordo, Jany-Kyrgyzstan W NCB 905,143 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/29/2008 n/a 08/28/2008 08/28/2009 Water Supply Rehabilitation of pumping station #5 W NCB 600,000 04/11/2008 04/04/2008 04/11/2008 05/26/2008 06/30/2008 n/a 07/30/2008 07/30/2009 Construction of Dostuk water main W NCB 424,514 04/04/2008 04/01/2008 04/04/2008 05/19/2008 06/24/2008 n/a 07/24/2008 07/24/2009 Construction of Dostuk distribution network W NCB 04/04/2008 04/01/2008 04/04/2008 05/19/2008 06/24/2008 n/a 07/24/2008 07/24/2009 340,466 Construction of Kalinin water main and W NCB 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/14/2008 n/a 08/13/2008 08/13/2009 water tanks in Kalinin (2*200m3) 454,629 Construction of Kalinin distribution network W NCB 04/18/2008 04/11/2008 04/18/2008 06/02/2008 07/14/2008 n/a 08/13/2008 08/13/2009 492,039 Rehabilitation of pumping station #4 and W NCB 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/18/2008 n/a 08/15/2008 08/15/2009 construction of Turan watermain and Turan distribution network 238,795 Reconstruction of Kontrreservuar W NCB 04/25/2008 04/11/2008 04/25/2008 06/09/2008 07/18/2008 n/a 08/18/2008 08/18/2009 headworks 285,714 Pilot irrigation project in Kara-Jigach W NCB 428,571 04/11/2008 04/04/2008 04/11/2008 05/26/2008 07/07/2008 n/a 08/06/2008 08/06/2009 Equipment for ARIS and MPUs 04/20/2008 04/13/2008 04/20/2008 35 Computer, Office Equipment and Furniture G Shopping 50,200 10/05/08 24/05/08 n/a 07/06/08 07/07/08 36 Vehicle G Shopping 14,000 04/20/2008 04/13/2008 04/20/2008 10/05/08 24/05/08 n/a 07/06/08 06/08/08 TOTAL GOODS AND WORKS 5,730,072 Dated January 6, 2008 KYRGYZ REPUBLIC: Bishkek and Osh Urban Infrastructure Project PROCUREMENT PLAN - CONSULTANT SERVICES for 2008-2009 Bid Bid Ref Type Method Total Bid Exp. Finaliz. Short Request RFP Invitat. Technical Eval.Of Final Receipt Award of Contract Prior Review No: Est. (US$) Of Of List For Issued To Sel. Proposal Technical Eval. Of Draft Contract/ Completion Interest TOR Of Cons. Proposals Firm Opening Proposal Report Contract Signature ARIS Staff (Individuals) 02.07.2008 CS INDV 118,100 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 MPU Bishkek Staff 02.07.2008 CS INDV 37,200 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 MPU Osh Staff 02.07.2008 CS INDV 22,800 02/06/08 01/04/08 22/06/08 n/a n/a n/a n/a n/a 02/07/08 12/07/08 15/07/09 15.07.2008 Preparation of detailed designs (Multiple contracts depending on 15.07.2008 CS CQ 155,000 29/05/08 15/05/08 18/06/08 06/18/08 06/25/08 06/25/08 n/a n/a 15/07/08 25/07/08 31/01/09 the proposals of Municipalities) 4.08.2008 Audit 14.12.2008 CS CQ 6,300 03/11/08 20/10/08 17/11/08 11/17/08 11/24/08 11/24/08 n/a n/a 14/12/08 24/12/08 30/04/09 30/12/2008 Total 339,400

Key facts
Organisation World Bank Group
Document type Procurement Plan
Adoption date
Source World Bank