Groupe de la Banque mondiale · Procurement Plan

China - Agricultural Technology Transfer Project : procurement plan for goods, Heilongjiang province - 2007

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

Page 1 China Agri-Tech Sub-Project Procurement Plan for 2007 of Heilongjiang Province Agriculture Development Office of Heilongjiang Aug-2007 Page 2 contents Summary of Heilongjiang Province Procurement Plan 1 Agricultural Science and Technology Park,Hongqi in Heilongjiang(Dairy+pig) 2 HeiLongjiang Agricultural science and Technology Park,Hongqi (New Energy 3 HeiLongjiang Agricultural science and Technology Park,Hongqi (Mushrooms) 4 Silage Development Shuangcheng Heilongjiang 5 Antibiotics-free Milk ,HuLan Heilongjiang 6 Soybean Improvement,Fujin Heilongjiang 7 Soybean Improvement, Hailun City Heilongjiang 8 Soybean Improvement, Bin County Heilongjiang 9 Seed Potatoes in Nehe City in Heilongjiang 10 Red Table Grapes Organic Production, Heilongjiang 11 Manure Treatment, Heilongjiang 12 Management and Monitoring & Evaluation in Heilongjiang 13 Page 3 General Procurement Notice: Oct.16, lflbreve Original Procurement Plan: Updated Procurement Plan: Contract No. Contract Cost 000' Contract No. Contract Cost 000' Contract No. Contract Cost 000' Contract No. Contract Cost 000' Agricultural Science and Technology Park,Hongqi in Heilongjiang(Dairy+pig) 252.4 462.2 10.1 5.0 90 : ffl flfl\11breve\03 252.4 717.5 10.1 5.0 90 : ffl flfl\11breve\03 Agricultural Science and Technology Park,Hongqi in Heilongjiang(New Energy) 280.0 462.2 10.1 5.0 90 : ff revehungarumlaut\11ffl\03 280.0 717.5 10.1 5.0 90 : ff revehungarumlaut\11ffl\03 Agricultural Science and Technology Park, Hongqi 300.9 251.9 9.1 4.6 90 : \03 Heilongjiang(Mushrooms) 307.6 457.1 10.1 10.1 90 : fifl lcaron\11ff\03 307.6 712.5 10.1 10.1 90 : fifl lcaron\11ff\03 Silage Development Shuangcheng Heilongjiang 330.7 462.2 10.1 5.0 90 : ffl lff\11ffl\03 330.7 717.5 10.1 5.0 90 : ffl lff\11ffl\03 Antibiotics-free Milk ,HuLan Heilongjiang 349.1 462.2 10.1 5.0 90 : fi eve\11ff\03 349.1 717.5 10.1 5.0 90 : fi eve\11ff\03 Soybean Improvement,Fujin 367.6 334.5 10.1 5.0 90 : ffl lbreve\11caron\03 367.6 462.2 10.1 5.0 90 : ffl \1a\11ff\03 367.6 717.5 10.1 5.0 90 : ff 1affi\11fi\03 Soybean Improvement, Hailun City Heilongjiang 386.1 334.5 10.1 5.0 90 : fi aron\11hungarumlaut\03 386.1 462.2 10.1 5.0 90 : fi dotaccent\11fi\03 386.1 717.5 10.1 5.0 90 : ffl taccentbreve\11fl\03 Soybean Improvement, Bin County Heilongjiang 404.6 334.5 10.1 5.0 90 : ffl lhungarumlaut\11\1a\03 404.6 462.2 10.1 5.0 90 : ff afi\11dotaccent\03 n lfi\11breve\03 Seed Potatoes in Nehe City in Heilongjiang 423.1 334.5 10.1 5.0 90 : ffi flff\11ff\03 423.1 462.2 10.1 5.0 90 : ffi arumlautfi\11fl\03 n ibreve\11ff\03 Red Table Grapes Organic Production, Heilongjiang 441.5 334.5 10.1 5.0 90 : fi lffl\11caron\03 441.5 462.2 10.1 5.0 90 : ff eff\11hungarumlaut\03 e reve\1a\11ff\03 Manure Treatment, Heilongjiang 460.0 462.2 10.1 5.0 90 : fi \1adotaccent\11ffl\03 460.0 717.5 10.1 5.0 90 : fi \1adotaccent\11ffl\03 Management and Monitoring & Evaluation Heilongjiang 478.5 462.2 10.1 5.0 90 : fi arumlautbreve\11caron\03 478.5 717.5 10.1 5.0 90 : fi arumlautbreve\11caron\03 Total iffiffl\11fi\03 Consultant Services China Agriculture Technology Transfer Project Loan No.:4773-CHA Name of subproject Total Summary of Heilongjiang Province Procurement Plan Works UNIT: USD Goods 554.8 417.3 12.0 6.0 90 : fi Page 4 Unit:Thousand RMB USD Equivalent Goods 10fl\1a\10flfi\106%flfi Good breeds Cows 80No ldotaccentfl\11fl\03 ronff\11fi\03 205.1 387.8 9.1 13.7 90 : 1&% 205.1 445.6 9.1 4.6 90 : 1 205.1 494.3 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a lfl\1a\10ff 205.1 716.3 9.1 4.6 90 : ff 03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03 10fl\1a\10flfi\106%flffl Breeding boars 119No lfflfl\11fl\03 evecaron\11ff\03 223.6 387.8 9.1 13.7 90 : 1&% 223.6 445.6 9.1 4.6 90 : 1 223.6 494.3 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a lfl\1a\10ff 223.6 716.3 9.1 4.6 90 : ff 03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03\03 Total reveflfl\11fl\03 flfl\11breve\03 Contract Description Procurement method P-Q(Y/N) Review by Bank Issuing of BD Agricultural Science and Technology Park,Hongqi in Heilongjiang(Dairy+pig) Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. 554.8 417.3 12.0 6.0 90 : ffl Page 5 Unit:Thousand RMB USD Equivalent Goods 10fl\1a\10flffl\106%flfi Solar & Wind Energy Equipment 6set ncaronfl\11fl ccentff\11caron 209.9 392.3 9.1 9.1 90 : 16 209.9 447.8 9.1 4.6 90 : 1 209.9 496.5 9.1 4.6 90 : 1 eve\12flfi\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flfi\12fflflfl\1a lfl\1a\10\1a\10fibreve 209.9 724.0 9.1 4.6 90 : ffi 10fl\1a\10flffl\106%flffl Instrument for Detecting 1set eflfl\11fl nff\11fi 233.5 392.3 9.1 9.1 90 : 16 233.5 447.8 9.1 4.6 90 : 1 233.5 496.5 9.1 4.6 90 : 1 eve\12flfi\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flfi\12fflflfl\1a lfl\1a\10\1a\10fibreve 233.5 724.0 9.1 4.6 90 : ffi 10fl\1a\10flffl\106%flffi Office Equipment 1set nffffl\11fl\03 ccentffl\11ffi 251.9 392.3 9.1 9.1 90 : 16 251.9 447.8 9.1 4.6 90 : 1 251.9 496.5 9.1 4.6 90 : 1 eve\12flfi\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flfi\12fflflfl\1a lfl\1a\10\1a\10fibreve 251.9 724.0 9.1 4.6 90 : ffi 10fl\1a\10flffl\106%flff Vehicles for Detecting 1 sets /a flfl\11fl\03 otaccent\11ffl 270.4 392.3 9.1 9.1 90 : 16 270.4 447.8 9.1 4.6 90 : 1 270.4 496.5 9.1 4.6 90 : 1 eve\12flfi\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flfi\12fflflfl\1a lfl\1a\10\1a\10fibreve 270.4 724.0 9.1 4.6 90 : ffi Total lfflffl\11fl\03 revehungarumlaut\11ffl\03 \03 Invest the purchase plan for 05 years, because of bid the company back a mark, so have no purchas HeiLongjiang Agricultural science and Technology Park,Hongqi (New Energy) Contract No. Contract Description Cost estimate Procurement method P-Q(Y/N) Expected Start/Duration (months) Remark Review by Bank Contract signing Issuing of BD Bid opening 554.8 417.3 12.0 6.0 90 : ffi Page 6 Unit:Thousand RMB USD Equivalent Goods 10fl\1a\10flffi\106%flfi The bacterium checks 1 instrument kind lfl\11fl\03 otaccent\11breve\03 209.0 389.5 9.1 9.1 90 : 16 209.0 444.9 9.1 4.6 90 : 1 209.0 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 209.0 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flffl Give a sewerage 1 set taccentfl\11fl\03 fi\11fi\03 232.0 389.5 9.1 9.1 90 : 16 232.0 444.9 9.1 4.6 90 : 1 232.0 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 232.0 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flffi The electricity increases Rong 150kw evefl\11fl\03 ngarumlaut\11ffl\03 255.1 389.5 9.1 9.1 90 : 16 255.1 444.9 9.1 4.6 90 : 1 255.1 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 255.1 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flff The damping being ventilated charges 1 set of temperature system fl\11fl\03 efi\11ffi\03 282.7 389.5 9.1 9.1 90 : 16 282.7 444.9 9.1 4.6 90 : 1 282.7 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 282.7 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flbreve 0.5 ton of 1 carry-scraper l\11fl\03 11caron\03 305.7 444.9 9.1 4.6 90 : 1 305.7 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 305.7 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flcaron Modernized 1 set of a variety of bacterium factory PC supervisory control system eflfl\11fl\03 nff\11fi\03 335.7 389.5 9.1 9.1 90 : 16 335.7 444.9 9.1 4.6 90 : 1 335.7 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 335.7 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%fl\1a Large-scale 2 sterilisatio implements lfl\11fl\03 reve\11caron\03 365.7 389.5 9.1 9.1 90 : 16 365.7 444.9 9.1 4.6 90 : 1 365.7 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 365.7 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%fldotaccent The automation is packed in bottled bag machine 1 The automation inoculates with machine 1 1 automation mixer ungarumlautfl\11fl\03 1a\11ffl\03 400.7 389.5 9.1 9.1 90 : 16 400.7 444.9 9.1 4.6 90 : 1 400.7 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 400.7 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%flhungarumlaut Kind, the bacterium trains a self- control the temperature , brightness , wet , makes 1 set angry efl\11fl\03 n\11ff\03 447.3 389.5 9.1 9.1 90 : 16 447.3 444.9 9.1 4.6 90 : 1 447.3 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 447.3 721.1 9.1 4.6 90 : ffl 10fl\1a\10flffi\106%fifl Clean classification equipment 1 lfl\11fl\03 otaccent\11breve\03 477.3 389.5 9.1 9.1 90 : 16 477.3 444.9 9.1 4.6 90 : 1 477.3 493.6 9.1 4.6 90 : 1 i\12flfi\12fflflfl\1a \12flbreve\12fflflfl\1a \12fidotaccent\12fflflfl\1a lfl\1a\10ff\10fflffi 477.3 721.1 9.1 4.6 90 : ffl Subtotal fihungarumlautfl\11fl\03 lcaron\11ff\03 Procurement method P-Q(Y/N) Review by Bank Issuing of BD Agricultural Science and Technology Park, Hongqi Heilongjiang(Mushrooms) Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. Contract Description 554.8 417.3 12.0 6.0 90 : ff Page 7 Unit:Thousand RMB USD Equivalent Goods 10fl\1a\10flff\106%flfi Silage Equipments Combine for silage corn 1set Minitype baler 11set Minitype packer 11set lfi\11fl ccenthungarumlaut\11hungarumlaut 221.7 390.9 9.1 9.1 90 : 16 221.7 446.3 9.1 4.6 90 : 1 221.7 495.1 9.1 4.6 90 : 1 eve\12fflbreve\12fflflfl\1a a\12fibreve\12fflflfl\1a taccent\12fibreve\12fflflfl\1a lfl\1a\10dotaccent\10fibreve 221.7 722.6 9.1 4.6 90 : ffl 10fl\1a\10flff\106%flffl Tractor 1set Tractor 110HP 1set arondotaccent\11fl f\11ff 262.3 390.9 9.1 9.1 90 : 16 262.3 446.3 9.1 4.6 90 : 1 262.3 495.1 9.1 4.6 90 : 1 eve\12fflbreve\12fflflfl\1a a\12fibreve\12fflflfl\1a taccent\12fibreve\12fflflfl\1a lfl\1a\10dotaccent\10fibreve 262.3 722.6 9.1 4.6 90 : ffi Total arumlautcaronhungarumlaut\11fl lff\11ffl Contract No. Procurement method P-Q(Y/N) Contract Description Silage Development Shuangcheng Heilongjiang Review by Bank Issuing of BD Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate e Page 8 Unit:Thousand RMB USD Equivalent Goods 10fl\1a\10flbreve\106%flfi Cooling tanks1set lfl\11fl eve\11ff\03 209.0 390.9 9.1 9.1 90 : 16 209.0 446.3 9.1 4.6 90 : 1 209.0 495.1 9.1 4.6 90 : 1 taccent\12fifl\12fflflfl\1a ngarumlaut\12fflbreve\12fflflfl\1a ngarumlaut\12fflbreve\12fflflfl\1a lfl\1a\10fifl\10ffifl 209.0 725.0 9.1 4.6 90 : fi Subtotal lfl\11fl\03 eve\11ff\03 Total lfl\11fl eve\11ff Contract Description Procurement method P-Q(Y/N) Review by Bank Issuing of BD Antibiotics-free Milk ,HuLan Heilongjiang Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. n Page 9 Unit:Thousand RMB USD Equivalent Works 10fl\1a\10flcaron\107-flfi Irrigation wells 18sets arumlautflfl\11fl breve\11ff\03 204.4 390.9 9.1 9.1 90 : 16 204.4 446.3 9.1 4.6 90 : 1 204.4 495.1 9.1 4.6 90 : 1 lfl\1a\10caron\10fi lfl\1a\10caron\10ffifl lfl\1a\10\1a\10fifl lfl\1a\10\1a\10fibreve e 204.4 736.3 9.1 4.6 90 : \03 10fl\1a\10flcaron\107-flffl Grid road 4km ccentfl\11fl \11ffi\03 222.9 390.9 9.1 9.1 90 : 16 222.9 446.3 9.1 4.6 90 : 1 222.9 495.1 9.1 4.6 90 : 1 lfl\1a\10caron\10fi lfl\1a\10caron\10ffifl lfl\1a\10\1a\10fifl lfl\1a\10\1a\10fibreve 222.9 722.6 9.1 4.6 90 : ffl Subtotal arumlautdotaccentfl\11fl\03 lbreve\11caron\03 Goods 10fl\1a\10flcaron\106%flfi Irrigation equipment 18sets arumlautflfl\11fl breve\11ff\03 278.3 390.9 9.1 9.1 90 : 16 278.3 446.3 9.1 4.6 90 : 1 278.3 495.1 9.1 4.6 90 : 1 lfl\1a\10caron\10fi lfl\1a\10caron\10ffifl lfl\1a\10\1a\10fifl lfl\1a\10\1a\10fibreve 278.3 722.6 9.1 4.6 90 : ffl 10fl\1a\10flcaron\106%flffl Seeding Truck 1set/a revefl\11fl\03 fl\11fi\03 296.8 390.9 9.1 9.1 90 : 16 296.8 446.3 9.1 4.6 90 : 1 296.8 495.1 9.1 4.6 90 : 1 lfl\1a\10caron\10fi lfl\1a\10caron\10ffifl lfl\1a\10\1a\10fifl lfl\1a\10\1a\10fibreve 296.8 722.6 9.1 4.6 90 : ffl Subtotal brevefl\11fl\03 \1a\11ff\03 Total iffifl\11fl 1affi\11fi /a Invest the purchase plan for 05 years, because of bid the company back a mark, so have no purchas Issuing of BD P-Q(Y/N) Soybean Improvement,Fujin Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. Contract Description Procurement method Review by Bank 554.8 417.3 12.0 6.0 90 : \1a Page 10 Unit:Thousand RMB USD Equivalent Works 10fl\1a\10fl\1a\107-flfi Irrigation wells 12 nflfl\11fl\03 aron\11hungarumlaut\03 204.4 390.9 9.1 9.1 90 : 16 204.4 447.8 9.1 4.6 90 : 1 204.4 496.5 9.1 4.6 90 : 1 \12fibreve\12fflflfl\1a eve\12fibreve\12fflflfl\1a ron\12flbreve\12fflflfl\1a ngarumlaut\12fibreve\12fflflfl\1a Subtotal nflfl\11fl\03 aron\11hungarumlaut\03 Goods 10fl\1a\10fl\1a\106%flfi Seed truck 1set/a ,Tractor 3 set/b,Combine 5 set/c,Seed sifter 5 set/c,Manual climate box 1set,Irrigation equipment20set/d,Film layer 4 set,Sprayer 4 set/d,Seed coating 3 set idotaccentffi\11fl\03 dotaccent\11fi\03 297.5 388.5 9.1 13.7 90 : 1&% 297.5 447.8 9.1 4.6 90 : 1 297.5 496.5 9.1 4.6 90 : < a\12fibreve\12fflflfl\1a taccent\12fibreve\12fflflfl\1a ngarumlaut\12flbreve\12fflflfl\1a \12fibreve\12fflflfl\1a Subtotal idotaccentffi\11fl\03 dotaccent\11fi\03 Total 1adotaccentffi\11fl taccentbreve\11fl UN /a Invest the purchase plan for 05 years, because of bid the company back a mark, so have no purchas /b Readjust and increase /c Have readjusted types /d Irrigation equipment and Sprayer have readjusted types These redressal have passed from world bank. Soybean Improvement, Hailun City Heilongjiang Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. Contract Description Procurement method Review by Bank Issuing of BD P-Q(Y/N) ccent Page 11 Unit:Thousand RMB USD Equivalent Works 10fl\1a\10fldotaccent\107-flfi lrrigation wells 13 ibreve\11fl\03 arumlautfi\11\1a\03 204.4 390.9 9.1 9.1 90 : 16 204.4 446.3 9.1 4.6 90 : 1 204.4 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 204.4 722.6 9.1 4.6 90 : ffl 10fl\1a\10fldotaccent\107-flffl Grid road 11km,Farm shelter belts 255mu ungarumlaut\1a\11fl\03 otaccent\11fi\03 227.5 390.9 9.1 9.1 90 : 16 227.5 446.3 9.1 4.6 90 : 1 227.5 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 227.5 722.6 9.1 4.6 90 : ffl Subtotal fiffl\11fl lhungarumlaut\11\1a Goods 10fl\1a\10fldotaccent\106%flfi lrrigation equipment 15set edotaccentbreve\11fl\03 reve\11fl\03 287.5 390.9 9.1 9.1 90 : 16 287.5 446.3 9.1 4.6 90 : 1 287.5 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 287.5 722.6 9.1 4.6 90 : ffl 10fl\1a\10fldotaccent\106%flffl Agric machinery Small thresher 57set Rotrovator 7set Sowing machine 7set Suspending furrow machine 7set Sprayer 7set ronfl\11fl\03 ehungarumlaut\11fl\03 330.2 390.9 9.1 9.1 90 : 16 330.2 446.3 9.1 4.6 90 : 1 330.2 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 330.2 722.6 9.1 4.6 90 : ffl 10fl\1a\10fldotaccent\106%flffi Computer system 3set eve\11fl\03 e\11dotaccent\03 372.9 390.9 9.1 9.1 90 : 16 372.9 446.3 9.1 4.6 90 : 1 372.9 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 372.9 722.6 9.1 4.6 90 : ffl 10fl\1a\10fldotaccent\106%flff Seeding Truck 1set/a revefl\11fl\03 fl\11fi\03 391.4 390.9 9.1 9.1 90 : 16 391.4 446.3 9.1 4.6 90 : 1 391.4 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 391.4 722.6 9.1 4.6 90 : ffl Subtotal ifffl\11fl\03 afi\11dotaccent\03 Total fibreveffl\11fl\03 lfi\11breve\03 /a Invest the purchase plan for 05 years, because of bid the company back a mark, so have no purchas Contract Description Procurement method P-Q(Y/N) Review by Bank Issuing of BD Soybean Improvement, Bin County Heilongjiang Bid opening Contract signing Expected Start/Duration (months) Remark Cost estimate Contract No. arumlaut Page 12 Unit:Thousand RMB USD Equivalent Works 10fl\1a\10hungarumlaut\107-flfi Irrigation well 7set lfl\11fl\03 ccenthungarumlaut\11\1a\03 204.4 390.9 9.1 9.1 90 : 16 204.4 446.3 9.1 4.6 90 : 1 204.4 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 204.4 722.6 9.1 4.6 90 : ffl 10fl\1a\10hungarumlaut\107-flffl Drainage works 19KM,Farm road 17KM,Farm shelter belts 300mu evefl\11fl\03 e\1a\11\1a\03 227.5 390.9 9.1 9.1 90 : 16 227.5 446.3 9.1 4.6 90 : 1 227.5 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 227.5 722.6 9.1 4.6 90 : ffi 10fl\1a\10hungarumlaut\107-flffi Shed for pre-storage 1000 /a nflfl\11fl\03 aron\11hungarumlaut\03 250.5 390.9 9.1 9.1 90 : 16 250.5 446.3 9.1 4.6 90 : 1 250.5 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 250.5 722.6 9.1 4.6 90 : ff Subtotal abrevefl\11fl flff\11ff Goods 10fl\1a\10hungarumlaut\106%flfi Laboratory Equipment: Cabinet incubator 2set,Microscope 1set taccentfl\11fl\03 fi\11fi\03 310.5 390.9 9.1 9.1 90 : 16 310.5 446.3 9.1 4.6 90 : 1 310.5 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 310.5 722.6 9.1 4.6 90 : \1a 10fl\1a\10hungarumlaut\106%flffl Tip lorry 1set /b revefl\11fl\03 fl\11fi\03 338.1 390.9 9.1 9.1 90 : 16 338.1 446.3 9.1 4.6 90 : 1 338.1 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve 338.1 722.6 9.1 4.6 90 : \1a 10fl\1a\10hungarumlaut\106%flffi Irrigation equipment 7set otaccentfl\11fl\03 reve\11hungarumlaut\03 361.1 390.9 9.1 9.1 90 : 16 361.1 446.3 9.1 4.6 90 : 1 361.1 495.1 9.1 4.6 90 : 1 eve\12fibreve\12fflflfl\1a ron\12fibreve\12fflflfl\1a a\12flbreve\12fflflfl\1a lfl\1a\10\1a\10fibreve ccent Subtotal ifl\11fl arumlautfi\11fl Total fcaronfl\11fl ibreve\11ff /a As required by the Word Band, the investment remains the same, but the area of structure is to be reduced by 1000 Review by Bank Issuing of BD /1 Revocatory project by the last Bank

Informations clés
Type de document Procurement Plan
Date d'adoption
Pays Chine
Source Banque mondiale