World Bank Group · Environmental Assessment

China - Jiangxi Shihutang Navigation and Hydropower Complex Project : environmental impact assessment (Vol. 3 of 5) : Environment protection action plan for the pivot area

China World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

Page 1 ENVIRONMENT PROTECTION ACTION PLAN FOR THE PIVOT AREA JIANGXI SHIHUTANG SHIPPING AND HYDROPOWER PIVOTAL PROJECT AT THE KAN RIVER CLIENT: NAVIGATIONAL AFFAIRS ADMINISTRATION, JIANGXI PROVINCIAL COMMUNICATIONS BUREAU EVALUATOR CCCC SECOND HARBOR CONSULTANTS CO., LTD. JIANGXI PROVINCIAL WATER RESOURCE PLANNING AND DESIGN INSTITUTE October 2007 WB Loan Application Project E1782 Vol. 3 Page 2 TABLE OF CONTENTS 1.0 GENERAL.......................................................................................................................................................1 1.1 B RIEF I NTRODUCTION TO THE P ROJECT ..........................................................................................................1 1.2 P REPARATION B ASIS .......................................................................................................................................9 1.3 EIA STANDARDS ............................................................................................................................................9 1.4 E NVIRONMENT P ROTECTION O BJECTIVES ....................................................................................................12 2.0 ENVIRONMENT MANAGEMENT...........................................................................................................17 2.1 E MVIRONMENT M ANAGEMENT O RGANS AND R ESPONSIBILITIES .................................................................17 2.2 E NVIRONMENT S UPERVISION .......................................................................................................................20 2.3 E NVIRONMENTAL P ROTECTION T RAINING ...................................................................................................25 2.4 L EGAL E FFECT OF E NVIRONMENT P ROTECTION A CTION P LAN ....................................................................27 3.0 ENVIRONMENT PROTECTION MEASURES........................................................................................30 3.1 E NVIRONMENT P ROTECTION M EASURES AT D ESIGN S TAGE .........................................................................30 3.2 E NVIRONMENT P ROTECTION M EASURES DURING C ONSTRUCTION ...............................................................30 3.3 E NVIRONMENT P ROTECTION M EASURES DURING O PERATION .....................................................................30 4.0 ENVIRONMENT MONITORING PLAN ..................................................................................................30 4.1 E NVIRONMENT M ONITORING P URPOSES ......................................................................................................30 4.2 E NVIRONMENTAL M ONITORING P LAN DURING C ONSTRUCTION ..................................................................30 4.3 E NVIRONMENTAL M ONITORING P LAN DURING O PERATION .........................................................................30 4.4 S UBMISSION OF E NVIRONMENTAL M ONITORING R EPORT ............................................................................30 5.0 ENVIRONMENT PROTECTION INVESTMENT ESTIMATE .............................................................44 5.1 P REPARATION P RINCIPLES AND B ASIS ..........................................................................................................44 5.2 I NVESTMENT I TEM C LASSIFICATION .............................................................................................................44 5.3 E NVIRONMENT P ROTECTION I NVESTMENT E STIMATE ..................................................................................45 Page 3 1 1.0 GENERAL 1.1 Brief Introduction to the Project 1.1.1 Project Class and standard The Project is is a multipurpose project, which takes shipping as the main purpose, gives consideration to power generation and flood control. The project belongs to second-class large (2) type project, with normal impounding level of 56.50m, total reservoir capacity of about 632 million m 3 , the reservoir area at normal level of 29.2km 2 backwater length of 38km 6 water turbine power generating sets, installed capacity of 117MW annual average power generating capacity of 4.8

Key facts
Organisation World Bank Group
Document type Environmental Assessment
Adoption date
Country China
Source World Bank