Page 1 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2161 Date ISDS Prepared/Updated: 05/10/2006 I. BASIC INFORMATION A. Basic Project Data Country: Madagascar Project ID: P095240 Project Name: MG Power/Water Sectors Recovery and Restructuring Project Task Team Leader: Stephan Claude Frederic G Estimated Appraisal Date: May 2, 2006 Estimated Board Date: July 13, 2006 Managing Unit: AFTEG Lending Instrument: Adaptable Program Loan Sector: Renewable energy (100%) Theme: Infrastructure services for private sector development (P) IBRD Amount (US$m.): 0.00 IDA Amount (US$m.): 10.00 GEF Amount (US$m.): 0.00 PCF Amount (US$m.): 0.00 Other financing amounts by source: BORROWER/RECIPIENT 1.00 1.00 B. Project Objectives [from section 2 of PCN] The aim of the project is to restore an adequate public utility service for electricity and water in urban areas of Madagascar and to create the foundation for a sustainable expansion of a commercially-oriented service in the most cost-efficient way. C. Project Description [from section 3 of PCN] The proposed lending instrument for this operation would be a two-phase, five year APL (2006- 10). For the Phase 1 (mid-CY 2006 to end CY2007) of the proposed APL is presented here. IDA funding of about US$10 million for APL-1 is proposed to be conditioned on a new letter of sector policy articulating the Government's long-term strategy. Only the most pressing needs of the electricity (and possibly water) sector would be covered by APL-1. The APL
Группа Всемирного банка · Integrated Safeguards Data Sheet
Madagascar - Power/Water Sectors Recovery and Restructuring Project
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Integrated Safeguards Data Sheet
Страна
Мадагаскар
Источник
Всемирный банк