Page 1 Environmental Impact Assessment Report Shaanxi Rural Drinking Water Safety and Sanitation Project by Using World Bank Loan and DFID Donation 1 Shaanxi Rural Drinking Water Safety and Sanitation Project by Using World Bank Loan and DFID Donation Environmental Impact Assessment Report Part C Environmental Management Plan Shaanxi Institute for Environmental Science Research and Design December 2006 E1491 v.2 Page 2 Environmental Impact Assessment Report Shaanxi Rural Drinking Water Safety and Sanitation Project by Using World Bank Loan and DFID Donation I Contents Part C .............................................................................................................................................. 1 Environmental Management Plan ............................................................................................. 1 1. Explanation ............................................................................................................................... 1 1.1 Compiling objectives and basis ....................................................................1 1.2 Main contents...............................................................................................1 2. The main environmental proceedings and collected environmental protection safeguard are confirmed in the project environmental assessment .................................... 1 2.1 Environmental sensitivity.............................................................................2 2.2 Assurance of water quantity .........................................................................2 2.3 Water quality guarantee................................................................................4 2.4 Dam safety...................................................................................................5 2.5 Public health ................................................................................................5 2.6 Environmental impact in construction phase.................................................5 2.7 Assurance of project sustainability ...............................................................8 2.8 Substitute scheme.........................................................................................8 2.9 Environmental impact of sanitation engineering...........................................8 2.10 Environmental risk.....................................................................................8 3. Aggregation of environmental monitoring work ............................................................... 9 3.1 Supervision management..............................................................................9 3.2 Environmental monitoring aiming at environmental proceedings .................9 4. Environmental management institution arrangement and responsibility assigned ..12 4.1 Environmental management institution ......................................................12 4.2 Institution responsibility.............................................................................12 5. Technical support and environmental management training ........................................14 5.1 Technical support.......................................................................................14 5.2 Environmental management training..........................................................14 6. Aggregation of environmental management work ..........................................................15 7. Environmental management work report .........................................................................19 8. Environmental management fund and fund assurance ..................................................19 Page 3 Environmental Impact Assessment Report Shaanxi Rural Drinking Water Safety and Sanitation Project by Using World Bank Loan and DFID Donation 1 1. Explanation 1.1 Compiling objectives and basis This plan is prepared for Shaanxi Rural Drinking Water Safety and Sanitation Project by Using World Bank Loan and DFID Donation: Environmental Management Plan of Rural Drinking Water Safety and Sanitation Project. It is one part of project environmental impact assessment report. This plan is complied based on World Bank Environmental Assessment Criteria (OP4.01) and related Chinese law, code and regulations. The objectives are: the project management agency has to carry out environmental protection safeguard measures in the project implementation phase and operation phase, and the adverse environmental effect of project can be accepted or is lowest. The advantageous environmental effect of project could be greatest degree reached. This plan is prepared by Shaanxi Provincial Research and Design Institute for Environmental Science. 1.2 Main contents This plan aggregates and briefly explains the necessary environmental management work in construction and operation phases of rural drinking water safety and sanitation project which is World Bank Loan and DFID Donation Used by Shaanxi Province. The main contents are as following: 1) The main environmental proceedings and gathered environmental protection safeguard are confirmed in project environmental assessment; 2) Total environmental monitoring work; 3) Environmental management organization setting; 4) Environmental consultation and environmental management training; 5) Total environmental management work; 6) Environmental management work report; 7) Environmental management fare and financial assurance 2. The main environmental proceedings and collected environmental protection safeguard are confirmed in the project environmental assessment According to the requirement of
World Bank Group · Environmental Assessment
China - Western Provinces Rural Water Supply, Sanitation and Hygiene Promotion Project : environmental assessment (Vol. 2 of 5) : Environmental management plan
View original document
The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.
Full text
Key facts
Organisation
World Bank Group
Document type
Environmental Assessment
Country
China
Source
World Bank