Groupe de la Banque mondiale · Environmental Assessment

China - Second Shanghai Urban Environment Project : environmental assessment (Vol. 3 of 13) : Environmental assessment summary

Chine Banque mondiale
Voir le document original

Le texte intégral est hébergé par l’organisation qui le publie. lawenc.com indexe les métadonnées et renvoie vers la source officielle.

Texte intégral

PEOPLE’S REPUBLIC OF CHINA SHANGHAI MUNICIPAL GOVERNMENT THE WORLD BANK SHANGHAI URBAN ENVIRONMENT E1091 PROJECT – APL 2 v3 ENVIRONMENTAL ASSESSMENT, SUMMARY EA IDENTIFICATION N° : 655055.R3.1 DATE : JANUARY 2005 This document has been produced SOGREAH Consultants/Groupe Huit as part of the FASEP Grant (French Government Grant) to Shanghai Municipal Government (Job Number 655055) This document has been prepared by the project team under the supervision of the Project Director following the Quality Assurance Procedures of SOGREAH in compliance with ISO9001. APPROVED BY INDEX DATE AUTHOR CHECKED BY (PROJECT PURPOSE OF MODIFICATION MANAGER) GDM A First Issue Feb 2005 BYN GDM INDEX CONTACT ADDRESS DISTRIBUTION LIST 1 SWEC (Mr HUANG Jiang Ping) Shanghai Development & Reform 2 Commission (Mr QIU Wenjin) mandersson@worldbank.org The World Bank (Mr Mats 3 gread@worldbank.org Andersson, Mr Geoffrey Read) thomas.clochard@dree.org 4 DREE (DREE Paris, Shanghai) laurent.martin@dree.org Alain.gueguen@sogreah.fr, 5 SOGREAH (Head Office) Muriel.dinola@sogreah.fr, groupehuit@groupehuit.com 6 Groupe Huit (Head Office) SHANGHAI MUNICIPAL GOVERNMENT – THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT – APL2 - DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE OF CONTENTS 1. INTRODUCTION ...................................................................................................................................... 5 1.1. SHANGHAI MUNICIPALITY ............................................................................................................................ 5 1.2. THE SHANGHAI URBAN ENVIRONMENT PROJECT ......................................................................................... 5 1.2.1. THE OVERALL APL FRAMEWORK.................................................................................................... 6 1.2.2. PHASE 2 OF THE APL (APL2)......................................................................................................... 8 1.3. PURPOSE AND SCOPE OF THIS REPORT ...................................................................................................... 11 1.4. ORGANISATION & LAYOUT OF THE EA REPORT .......................................................................................... 12 2. PROJECT BACKGROUND & DESCRIPTION .............................................................................................. 14 2.1. SHUEP FRAMEWORK ENVIRONMENTAL ASSESSMENT.................................................................. 14 2.2. APL2 PROJECT DESCRIPTION ................................................................................................................... 15 3. ENVIRONMENTAL BASELINE SITUATION ................................................................................................. 18 3.1. REGIONAL PHYSICAL SETTING .................................................................................................................. 18 3.1.1. GEOGRAPHY ................................................................................................................................ 18 3.1.2. GEOLOGY 18 3.1.3. CLIMATE 18 3.1.4. HYDROLOGY ................................................................................................................................. 18 3.1.5. BEACH CHARACTERISTICS ............................................................................................................ 20 3.1.6. GROUNDWATER ............................................................................................................................ 20 3.1.7. NATURAL DISASTER ...................................................................................................................... 20 4. IMPACT ASSESSMENT AND MITIGATION ................................................................................................. 22 5. ENVIRONMENTAL MANAGEMENT PLAN .................................................................................................. 50 5.1. OBJECTIVES OF EMP................................................................................................................................ 50 5.2. CONTRACTUAL DISPOSITIONS ................................................................................................................... 50 5.2.1. OBLIGATIONS OF THE CONTRACTOR.............................................................................................. 50 5.3. ORGANIZATION FOR EMP IMPLEMENTATION .............................................................................................. 51 5.3.1. ENVIRONMENTAL MANAGEMENT PROCEDURES .............................................................................. 53 5.4. COST ESTIMATE FOR EMP ........................................................................................................................ 53 6. PUBLIC CONSULTATION & INFORMATION DISCLOSURE ........................................................................... 55 7. FINDINGS AND CONCLUSIONS ............................................................................................................... 59 SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE I JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT – THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT – APL2 - DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLES TABLE 1: INVESTMENT COMPONENTS OF THE APL2..................................................................................................................................16 TABLE 2: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 WATER COMPONENTS ......................................................23 TABLE 3: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF QINGPU WATER NETWORK EXTENSION .....................................................28 TABLE 4: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF MAIN NETWORK REHABILITATION ..............................................................32 TABLE 5: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF MINHANG WATER SUPPLY PROJECT .........................................................34 TABLE 6: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 WASTEWATER COMPONENTS ............................................39 TABLE 7: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 SOLID WASTE COMPONENTS ............................................45 TABLE 8: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 WATER SUPPLY COMPONENTS ..........................55 TABLE 9: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 WASTE WATER COMPONENTS ..........................56 TABLE 10: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 SOLID WASTE COMPONENTS ..........................57 SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE II JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT – THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT – APL2 - DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIGURES FIGURE 1: SHANGHAI MUNICIPALITY WITHIN THE YANGTZE DELTA REGION[REF. 10] ....................................................................................5 FIGURE 2: OVERVIEW OF SECTORS INCLUDED IN THE DIFFERENT PHASE S OF THE SHANGHAI APL ...............................................................7 FIGURE 3: FRAMEWORK FOR THE APL2 .....................................................................................................................................................9 FIGURE 4: LOCATION OF THE PROJECT COMPONENTS ................................................................................................................................10 FIGURE 5: SURFACE WATER LOCATION IN THE SHUEP AREA ...................................................................................................................19 FIGURE 6: PROPOSED ORGANIZATION FOR THE IMPLEMENTATION OF EMP FOR APL2 ................................................................................52 FIGURE 7: COMMUNICATION, REPORTING-DOCUMENTATION AND PROBLEM RESOLUTION FLOW CHART ......................................................54 SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE III JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT – THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT – APL2 - DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT ABBREVIATIONS, ACRONYMES AND UNITS APL Adaptable Program Loan BOD5 Biochemical Oxygen Demand (5 days) BSMF Bailongang Sludge Management Facility COD Chemical Oxygen Demand CRE Chief Resident Engineer CSE Construction Supervision Engineer CSEA Construction Supervision Environmental Adviser CSEMP Construction Site Environmental Management Plan DCRE Deputy Chief Resident Engineer DFV District Financing Vehicle EA Environmental Assessment EMP Environmental Management and Monitoring Plan EMS Environmental Monitoring Station EPB Environmental Protection Bureau (of SEPA) ESD PMO-Environmental and Social Division ESFI Environmental and Social Field Inspector ESU Environmental and Social unit MWSC Minhang Water Supply Company NCP Nuisance Control Plan PIU Project Implementation Unit PMO Project Management Office PPE Personal Protective Equipment PRC People’s Republic of China SAES Shanghai Academy of Environmental Sciences SCAESAB Shanghai City Apearance and Sanitation Bureau SEP Shanghai Environment Project SEPA State Environmental Protection Administration SHUEP Shanghai Urban Environment Project SRS Standard Site Inspection Review Sheet SS Suspended Solids SSP Shanghai Sewerage Project SSWC Shanghai South Water Company Ltd SWA Shanghai Water Authority SWAOD Shanghai Water Assets TA Technical Assistance WB World Bank WTS Western Trunk Sewer WTW Water Treatment Work WWTP Wastewater Treatment Plant CURRENCIES RMB Chinese Yuan (Renminbi) USD United States Dollar Conversion rate: 1 USD = 8.3 RMB SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE IV JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 1. INTRODUCTION 1.1. SHANGHAI MUNICIPALITY With a total population of over 16 million inhabitants1 excluding the “floating population”2 , Shanghai is China’s largest city and the third largest in Asia. Together with Beijing, Chongqing and Tianjin, Shanghai is one of the municipalities under direct control of the Central Government. Situated within the Yangtze Delta Region stretching from Ningbo in Zhejiang Province to Nanjing in Jiangsu Province, Shanghai is at the apex of a very large, highly urbanised and rapidly industrialising corridor. By 2005 this corridor will have a population slightly over 90 million inhabitants. FIGURE 1: SHANGHAI MUNICIPALITY WITHIN THE YANGTZE DELTA REGION[REF. 10] Jiangsu Changzhou Chang Jiang (Yangtze) River z Wuxi z Liuhe River Mouth of Kunshan Jiading z Baoshan Chang Jiang River z z Suzhou z Taihu Lake Suzhou Creek z Shanghai z Qingpu Chuansha z Wujiang z Nanhui z Songjiang z Legend Huangpu River East China Sea z Fengxian z City Jiashan z z Town z Road Jiaxing Zhejiang z Railway Jinshanwei Grand Canal z Pinghu z Tongxing Main River/Creek Haiyan z z Haining River/Creek Hangzhou Bay Provincial Boundary zYuhang  1.2. THE SHANGHAI URBAN ENVIRONMENT PROJECT The Shanghai Urban Environment Project (SHUEP) is intended to provide a sustainable environmental setting for the long-term economic and social development in the Municipality of Shanghai (see Figure 1) while supporting the provision of urban infrastructure. 1 According to the 2000 Census the total population in Shanghai was 16.41 million inhabitants, of which 13.14 were had an urban registration and 3.27 were “long-stay” migrants. 2 Estimates as high as 3 million have been recently proposed SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 5 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT The SHUEP which was approved by the World Bank in June 2003 [Ref.11] would aim to support SMG to: • Implement the urban environment goal of its development strategy and thereby help to ensure that economic growth takes place in an environmentally and institutionally sustainable manner; • Provide major long-term environmental benefits to its millions of citizens and to the ecology of Shanghai Municipality; and • Develop innovative policies, institutional reforms and financing methods that are needed to support the environmental goals and that will serve as models for local government and environmental reform throughout China. Recognising that to achieve the desired development goals may require many years to resolve and cannot be addressed by a conventional3 (or typical) investment operation, the SHUEP has been devised as an Adaptable Program Loan consisting of a series of loans over a 7-10 year period, divided into 3 phases. A key requirement of the APL is that there is a clear and feasible development program in place to guide implementation of the projects and to provide clear milestones and benchmarks for policy and institutional reform. 1.2.1. THE OVERALL APL FRAMEWORK The overall framework for the SHUEP APL has been formulated in the Development Programme for Shanghai APL Project [Ref. 12]. As indicated in the document, the framework complies with (and has indeed been built upon) the Tenth Five Year Plan and the Shanghai General Master Plan. The APL has been divided into three phases. Each phase has a broad theme leading to a series of objectives, components, actions and triggers, and performance indicators. Although initially the core program/themes of the APL appears to form a continuum in time, in conceptual terms each phase is designed to give prominence to one aspect of the urban environmental strategy being pursued. As described in the Project Appraisal Document [Ref.11]: In Phase 1 prominence is given to further developing the underpinnings and enabling condition to pursue an integrated/regional approach to environmental issues. Investments included in this phase are those that are already known to be priority components of the integrated/regional approach (including the protection of upstream sources for water supply, expansion of shared landfills, complementary investments to increase efficiency of earlier investments). Further development of integrated/regional programs and related investments is expected to be continued during subsequent phases. Phase 1 will also test new approaches to upgrading urban environmental services in a poorer, underserved area through a pilot program. Phase 2 will support implementation of programs that address environmental issues of greater complexity and respond to the deepening of SMG’s work on the environmental agenda (including solid waste management program consolidation, bond finance and a district financing vehicle, and continue to expand the pilot approaches to upgrading urban environment services in poorer, underserved areas). Preparations for these Phase 2 activities are to be made during implementation of Phase 1. 3 It should not however be ignored that Shanghai has had a long and fruitful relationship with multi-lateral lending agencies such as the World Bank. Significant Projects in the environment sector include: • Shanghai Sewerage Project, • Shanghai Environment Programme • Second Shanghai Sewerage Programme • Suzhou Creek Rehabilitation SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 6 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT Phase 3 is the stage at which the Shanghai authorities hope to begin realising the fruits of their efforts to build up to a sustainable financial system for urban environment services. It is anticipated that further improvements to the operations, management and finances of at least some urban environment service utilities over the course of Phases 1 and 2 would enable the to move beyond the municipal budget to finance their capital investments on acceptable terms, either on the capital markets and/or obtaining finance from a sustainable district financing vehicle. Complementing this is the development and establishment during Phases 1 and 2 of the supply side, including enabling capital market/financing arrangements and institutions. Phase 3 also continues the deepening of the environmental agenda, moving on to begin pursuing some of the improvements in air quality potentially available from the increased supply of natural gas to the Shanghai metropolitan area. A summary of the sectors and key components proposed for inclusion in the Shanghai Urban Environment Project is included in Figure 2. FIGURE 2: OVERVIEW OF SECTORS INCLUDED IN THE DIFFERENT PHASE S OF THE SHANGHAI APL APL1 City Upper Urban Area Solid Waste IST Wastewater Huangpu Upgrading APL2 Urban Suburban Urban Area Environment Solid Waste IST Wastewater Improvement Upgrading APL3 Urban City Urban Area Environment IST Wastewater Improvement Upgrading SHanghai Urban Environment Project SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 7 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 1.2.2. PHASE 2 OF THE APL (APL2) SHUEP APL2 is planned to continue with the improvements to the infrastructure and environmental needs of the city proper, with phase 2 of the solid waste disposal project, and urban environment improvements as its main tasks. SHUEP Phase 2 will, at the same time, provide assistance to the governments at suburban district and county level in improving their infrastructure and service quality with the focus on several sewerage projects in the suburban area. During the implementation process, Shanghai will try new financing methods and mechanism in the city proper and suburban area. SHUEP Phase 2 will start in the second half of 2003 and should be completed in 2008. Since the outlining of the initial development programme, upon which the SHUEP has been based, a number of factors have intervened: • It has become evident that economic and population growth in Shanghai has been and will continue to exceed expectations as outlined in the master plan of 2002 and the associated sector plans. Although the development programme as initially outlined is still relevant, the sector plans are themselves outdated and require updating to support further the SHUEP. • The award of the Universal Expo 2010 to Shanghai, has further strengthened the commitment of Shanghai to the improvement of its environment. With the adoption of the “Better City, Better Life”, Shanghai aims at becoming an international financial centre, with a concomitant improvement in environmental conditions and service provision. A notable feature of this enhanced awareness of environmental issues is the adoption of more ambitious targets, notably for water supply where it is proposed to provide drinkable water quality to the consumer by 2010. The framework of the APL2 has therefore been adapted to reflect the new priorities of SMG. The components can be broadly sub-divided into 5 categories: • Water Sector Components, consisting of – Shanghai South Water Company Components – Minhang Water Company Components • Waste Water Sector Components (of SMSC) – North West Drainage Area Component – Sludge Treatment Component • Solid Waste Components – Gucun dump closure – Minhang dump closure – Sanlintan dump closure • District Financing Vehicle Componets – Chongming Wastewater; – Huaxin Wastewater – Chongming Solid Waste – Jinshan Solid Waste • Institutional Strengthening and Training An overview of the proposed framework for APL2 is included in Figure 3 Triggers for APL2 will consist of: 1) SHUEP Phase 1 should be ongoing/completed successfully with both SMG and the World Bank satisfied. 2) The various investment plans for SHUEP Phase 2 should be approved by SMG and SDPC and the project preparation should be agreed by the World Bank. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 8 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 3) Approval of the Upper Huangpu Catchment Management Plan, including recommendations for pollution source control and relevant institutional strengthening in the drinking water protection area. 4) Implementation of a publicity campaign for water conservation. 5) Approval of the Municipal Solid Waste Disposal Master Plan, including adopting market- oriented charges on users, treatment, disposal, solid waste discharge fee, service charge policy, waste volume reduction, recovery and recycling, and the management and disposal of toxic and hospital wastes. 6) Start to prepare policies and regulations suitable for service/management contracts and/or a concession, and the signing of a social capital participation contract (BOT or concession) for a wastewater treatment facility. 7) Prepare the plan and prospectus for the issuance of long term domestic bonds for infrastructure financing. SMG will make every effort to obtain approval from the Central Government. 8) SMG will initiate a study on the policy and action plan for the establishment of a pilot water source protection fund. 9) Regulations drafted and submitted for municipal approval for agricultural pollution control. FIGURE 3: FRAMEWORK FOR THE APL2 APL2 District Wastewater Water Supply Solid Waste Financing IST Vehicle North West Suburban Enhanced Drainage Transport Wastewater Treatment Area Projects Network Suburban Sludge Dump Extension & Solid Waste Disposal Closure Rehabilitation Projects The project technical and financial preparation was carried out by Chinese local organisations and has been supported by various sources of international assistance to SMG, including SOGREAH, the Design Review and Advisory (DRA) Consultant to the Shanghai Project Management Office (PMO), the responsible institution for the overall preparation of the project. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 9 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIGURE 4: LOCATION OF THE PROJECT COMPONENTS Western Trunk Sewer Shidongkou WWTP Guncun Minhang Changqiao SHANGHAI Bailonggang Sludge Sanlintan Management Facility Minhang Keys Dumpsite Water Works Sludge Facility SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 10 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 1.3. PURPOSE AND SCOPE OF THIS REPORT In accordance with PRC National Regulations and the World Bank Operational Policy 4.01 related to Environmental Assessment, the infrastructure components of the Project fall under the Category A project and as such, have been subject to full EA. A second major objective is to prepare an Environmental Management Plan which should provide the operational basis for the implementation of mitigation measures both during construction and operation stages of the project. The overall EA for the project consists of the following series of documents • Volume 1: Summary EA • Volume 2: Water Sector EA • Volume 3: Wastewater Sector EA • Volume 4: Solid Waste Sector EA • Volume 5: Envionmental Management Plan • Volume 6: EA Framework for the DFV • EIAs for individual components (in Chinese only) In order to comply with PRC Regulation “Strengthening Environmental Impact Assessment (EIA) Management for the Construction Project Loaned by International Finance Organisation” of June 21, 1993 and with World Bank Safeguards Operational Policy, the Project Management Office (PMO) and the Project Owner have commissioned the Shanghai Academy of Environmental Sciences to carry out the EIA studies for the solid waste components. This Environmental Assessment for the solid waste is an overall consolidated EA of the three solid waste components namely the Closure and Relocation of Sanlin Emergency Dumpsite, Closure of Gucun Dumpsite, and Closure of Minhang Dumpsite. The primary aim of this report is to satisfy the requirements of the PRC and also the World Bank regarding environmental assessment and mitigation. This EA report is based on the review of the following technical reports: • Environment Impact Assessment for the Closure and Relocation of Sanlin Emergency Dumpsite, Shanghai Environmental Science Research Institute, commissioned by Shanghai Sanitation Bureau, January 2005 • Environment Impact Assessment for the Closure of Gucun Dumpsite, Shanghai Environmental Science Research Institute, commissioned by Shanghai Sanitation Bureau, January 2005 • Environment Impact Assessment for the Closure of Minhang Dumpsite, Shanghai Environmental Science Research Institute, commissioned by Shanghai Sanitation Bureau, January 2005 • Resettlement Action Plan for Sanlin Solid Waste, Dumpsite Closure and Relocation, Shanghai Sanitation Bureau, November 2004 • Social Impact Assessment for Sanlin Solid Waste Dumpsite Closure and Relocation, Shanghai Sanitation Bureau, December 2004 Main relevant regulatory, policy and administrative requirements for environmental assessment of development projects in China applied in the EA are as follows: • Law of Environmental Protection of the PRC (December 26, 1989); • Law of Air Pollution Prevention and Control of the PRC (April 29, 2000); • Law of Water Pollution Prevention and Control of the PRC (revised on May 15, 1996); SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 11 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT • Law of Environmental Noise Pollution Prevention and Control of the PRC (October 29 1996); • Law of Solid Waste Pollution Prevention and Control of the PRC (October 30, 1995); • Law of Environment Impact Assessment of the PRC (Approved in October 2002 and implemented since September 1, 2003); • Law of Cleaning Production Promotion of the PRC(June 29, 2002); • Policy on Municipal Solid Waste Disposal and Pollution Prevention Technology (May 2000) • Management Regulations on Environmental Protection for Construction Projects (November 18, 1998); • Circulation on Strengthening EA for Construction Projects Receiving International Financing of 1993; • Technical Guidelines for Environmental Impact Assessment (HJ/T2.1-93); • Environmental Protection Design Provisions for Construction Projects (November 29, 1998); • Regulations of Shanghai Environmental Protection (rev. May 27, 1997); • Namelist of Hazardous Waste, PRC (July 1, 1998); • Shanghai Hazardous Waste Pollution Prevention Measures (December 14, 1997); • Functional Division of Shanghai Water Environment (1997); • Functional Division of Shanghai Ambient Atmospheric Quality (1997); • Notification on the Implementation of the Amended Functional Division of Shanghai Ambient Atmospheric Quality (2004); • Shanghai Municipal Master Plan for 1999-2020 (2000); • Shanghai Solid Waste Disposal Development Plan (February 2002); • Feasibility Study Report of Sanlin Emergency Dumpsite Closure and Relocation (November 2004); • Feasibility Study Report of Gucun Dumpsite Closure (September 2004); • Feasibility Study Report of Minhang Dumpsite Closure (September 2004); Of the ten World Bank safeguard policies, Environmental Assessment (OP/BP/GP4.01), Involuntary Resettlement (OP4.12), Indigenous people (OD4.20), Natural Habitats (OP4.04) and Cultural Property (OP4.11) are applied in this EA. Since there are no project components that would involve forest, pest control chemicals, international waterways, dams or construction in disputed areas as defined under the World Bank’s OP7.60, safeguard policies related to these are not applicable. 1.4. ORGANISATION & LAYOUT OF THE EA REPORT The ensuing chapters of this report deal with the following topics: SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 12 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT Chapter 2 Project Background & Description Provides an overview of the regional context of the overall SHUEP components, covering not only APL2 but APL1 and APL3. The chapter then describes in detail the four major physical components of the APL2, namely: • Water Supply Managment Components; • Waste Water Management Components; • Solid Waste Management Components; • Suburban district components financed as part of the DFV. Chapter 3 Environmental Baseline Situation Provides a general summary of the environmental baseline conditions within Shanghai Municipality. Chapter 4 Impact Assessment & Mitigation Presents in a summarised format the different impacts associated with each component together with a series of mitigation measures. Chapter 5 Environmental Management Plan Summarises the major elements of the EMP for APL2 Chapter 6 Public Consultation & Disclosure Summarises the results of the two Public Consultations and the different measures related to information disclosure. Chapter 7 Main Findings & Conclusions Summaries the main findings and conclusions of the EAs for APL2 The report is accompanied by a series of appendices covering the following topics : Appendix A Bibliography Appendix B APL2 Components – Photo Plates SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 13 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 2. PROJECT BACKGROUND & DESCRIPTION 2.1. SHUEP FRAMEWORK ENVIRONMENTAL ASSESSMENT The basis of the SHUEP APL is the Development Programme finalised in early 2002. This programme was formulated of a framework complying with the Tenth Five-Year Plan and Shanghai General Master Plan as well as the basic requirements of master plans for environmental protection sectors. As summarised previously in the APL1 EA, as a long term development strategy, Shanghai has adopted a City Master Plan (1999-2020) which has been approved by the State Council, with an objective for Shanghai to become an international centre for economics, financing, trade and shipping. Shanghai’s Tenth Five Year Plan (2001-2010) is part of the implementation of the long term strategy. SHUEP’s goals and physical investments completely comply with the city Master Plan which calls for centralized sewage treatment, including centralized wastewater treatment for Upper Huangpu Catchment, to protect drinking water sources in upper and lower Huangpu areas and to protect the environment. The solid waste component in SHUEP will not only support the Master Plan’s requirements for environmentally sound disposal of municipal solid waste but also contribute to the protection of surface water quality and overall environmental and living conditions of Shanghai. The Shanghai City Master Plan includes greening and landscape in the inner city, ring road, and throughout the city with an ambitious goal of 35% green coverage by 2020. The Master Plan also calls for preservation of the Old City and historical sites in Shanghai. APL will fund urban upgrading and in particular, the Old City preservation and improvement. The policy, financial, institutional and capacity building initiatives are an integral part of SHUEP and are the assurance for efficient and effective implementation, operation and sustainable development of urban environment infrastructure and management system. This complies with the policy spirit and principles of Shanghai City Master Plan as well as the direction of the city’s reform. Since approval of the SHUEP, the importance of environmental protection as part of Shanghai’s overall development has been enhanced by the adoption of the “Better City, Better Life” strategy associated with the award to Shanghai of the 2010 Universal Exposition. SHUEP Phase 2 has been developed in accordance with the original development programme and associated sector palnning but has also demonstrated the adaptability of the program by re-aligning the sectors included within the SHUEP with respect to the priorities of SMG. Thus, the water supply management components have been brought into the SHUEP in line with Shanghai’s goal to supply tap water fit to drink by 2010. The closure of the Sanlin Tan dump site within the city centre area and close to the Expo site will enhance the green areas in Shanghai and will utilise further the new sanitary landfill created at Laogang as part of the APL1. The implementation of new financing mechanisms will be implemented as part of APL2 by the issue of a bond for financing environmental infrastructure and the development of the “District Financing Vehicle”. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 14 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 2.2. APL2 PROJECT DESCRIPTION The components of APL2 can be broadly sub-divided into 5 categories: • Water Sector Components, consisting of – Shanghai South Water Company Components – Minhang Water Company Components • Waste Water Sector Components (of SMSC) – North West Drainage Area Component – Sludge Treatment Component • Solid Waste Components – Gucun dump closure – Minhang dump closure – Sanlintan dump closure • District Financing Vehicle Componets – Chongming Wastewater; – Huaxin Wastewater – Chongming Solid Waste – Jinshan Solid Waste • Institutional Strengthening and Training Table 1 provides a summary of the physical investment components of APL2 forming the subject of the EA documentation. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 15 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 1: INVESTMENT COMPONENTS OF THE APL2 Project Project components Contents of the project Owner/Sponsor Shanghai South Changqiao Water Construction of a new 400,000 m3/day treatment plant line Water Company Treatment Plant including pre- and post-ozonation and activated carbon Upgrading treatment The aim of the project is to solve the problem of the water supply pipelines of Xujing and Huaxin of Qingpu. The total length of pipeline in this project is about 57.26km. Qingpu Network The project includes the water distribution main pipes with Extension DN500 and more than DN500, more details can be seen in Table 2 4, the pumping station at Huaxiang Road and the pressure pumping station at Lingkong can been seen in Table 2 5 . Main Network Pilot Study to investigate in 8 locations in central Shanghai different network rehabilitation techniques based on Rehabilitation “trenchless” technology Minhang Water Minhang N°2 Water Company Treatment Plant Add pre- and post-ozonation and activated carbon treatment to current treatment lines Upgrading Shanghai Municipal Installation of 24.45km of sewer pipe through three administrative areas including Putuo, Zhabei and Boashan Sewerage Company Upgrading One pumping station (Xincun road pumping Western Trunk Sewer station) and construction of three pumping stations Project (Zoumatang, Wenzaobang and Yueluo road) and installation of monitoring equipment Upgrading or Construction of main sewer and branches connection in the Baoshan area Bailonggang Sludge Construction of a sludge treatment facility using anaerobic Management Facility digestion of a capacity of 400tDS/day Zhuyuan Sludge Construction of sludge treatment facility for Zhuyuan No.1 and No.2 WWTPs by anaerobic digestion with the Management Facility capacity of 309tDS/day SCAESAB Closure and Relocation Waste relocation of Sanlin Dumpsite Site preparation Closure works (dump side slope mending, final coverage Closure of Gucun and rehabilitation, rainfall drainage system, landfill gas Dumpsite release, vertical penetration proof and foundation consolidation, etc.) Closure of Minhang Closure works (demolishing, earthwork, final coverage and rehabilitation, rainfall drainage system, landfill gas Dumpsite release, vertical penetration proof, etc) SCEAM (DFV) The project consists of a WWTP in the largest town in Chongqming Chongming County, and collection sewers. The first phase Wastewater of the WWTP will provide a capacity of treatment of 50,000 m3, and serve an area of 36 km2, SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 16 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT Project Project components Contents of the project Owner/Sponsor The proposal is for Stage 1 of the strategy, the design and Chongming Solid construction of the first phase of a new sanitary landfill. . The first project stage is scheduled to begin in 2005, and Waste provide 300 – 500 ton/day for 11 years of disposal capacity. The long-term plan for wastewater management in Huaxin Town in Qingpu Districts involves constructing a wastewater treatment plant to 45,000 t/day to serve the town seat and surrounding villages within the Huaxin Wastewater administrative area of 48 km. Phase I will involve the construction of a plant with 15,000m³/day treatment capacity. The WWTP will be developed through BOT, but Huaxin Town has asked DFV to co-finance the costs of developing the first phase of the sewer system, including pumping stations. The project consists of upgrading and expanding the Jinshan Solid Waste collection and transfer system, including 26 8-ton trucks, and 11 15-ton trucks, a transfer station, and containers. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 17 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 3. ENVIRONMENTAL BASELINE SITUATION 3.1. REGIONAL PHYSICAL SETTING 3.1.1. GEOGRAPHY The waste water components are located within the Shanghai Municipality which is at the southeast edge of the estuary in Yangtze River Delta. In the area, the topography is relatively uniform ranging from 3.8 to 5.0mAOD. The WTS component is located in the Shanghai urban district including Putuo, Zhabei and Baoshan areas. The BSMF component is located within Heqing town of Pudong new district along the estuary of Yangzte River. 3.1.2. GEOLOGY The regional geology of the area of Shanghai is generally composed by a top layer of alluvium, marine and fluvial deposits to a depth of 30m. Underneath the alluvium, there are tertiary volcanic rocks and Jurassic volcanic rocks. The volcanic activities of late Jurassic in this area is controlled by the regional fracture structure of Fengjing-Chuansha base. The volcanic basin of Jinqiao Structure develops on this fracture, and is widely distributed to the northwest. 3.1.3. CLIMATE Shanghai has the obvious subtropics climate characteristics. The average annual temperature is 15.7°C with an extreme temperature of 37.0°C and a lowest temperature of -7.4°C. The average annual precipitation is 1127.7mm and the average mean sunshine time is approximately 2,170 hours. On the coast, the average rainfall may be higher and reach 1,428.5mm. The average relative humidity is 80%. The annual average wind speed in this area is 3.2m/s. The main wind in the region is from southeastern direction. Secondary winds are from the northwest and northeast. In 2003, average annual temperature was 17.4°C, the sunshine time was 1,700 hours and the rainfall was 931.2mm. About 50% of the rainfall in a year occurs in the flood season from May to September, which could be divided into 3 periods: spring rain, plum rain and autumn rain. The area is often struck by typhoon or tropical storms during the wet seasons. There were 3-4 intense typhoons in the past 10 years. 3.1.4. HYDROLOGY The location of main rivers and reservoirs in the project area are shown on Figure 5. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 18 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIGURE 5: SURFACE WATER LOCATION IN THE SHUEP AREA SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 19 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT Rivers and lakes Shanghai is covered by a complex and dense surface water network with the density of 26~27km/km2 including rivers and lakes, most of which belong to the Taihu Lake Basin. The main river, Huangpu River, originates from Taihu Lake which is located 113km away. It is 1113.4km long from Taihu Lake to Wusongkou with the width about 400m and the depth about 7-9m. Mijiadu is the major discharge canal of Taihu Lake with the average annual flow rate of about 300m3/s. Yangtze River is the biggest water resource going through Shanghai. The Shanghai section of the river is approximately 15km wide with the average flow rate about 29,300m3/s. The highest tide observed of this river section is 5.64m. Huangpu River and Yangtze River are the main water supply source of Shanghai. The inner rivers have water level of approximately 2.5m to prevent flood and to ensure the navigation and agricultural irrigation. As Shanghai is located on the East China Sea, inner canals are under tidal influence. When entering the sea the impact scope of the water from Yangtze River could reach 50 km, and normally the inland will not be impacted by saline intrusion, unless there is spring tide or the water level of inner rivers is too low. About 468,000,000 tons of mud and sand are flushed from Yangtze River into the sea, most of which is accumulated at the estuary of Yangtze River and the northern bank of Hangzhou Bay. The sand content of water from Yangtze River is higher than that of water from Huangpu River. 3.1.5. BEACH CHARACTERISTICS The riverside area from Laohaibin to Sanjiagang is in total 24km long, where grass seedling land, reed land and beaches are sporadically distributed with the total area of about 535.2ha.The riverside area from Sanjiagang to Panjiahong is 11.7km long with 399.4ha grass seedling land and reed land. There is a large area of beach, in which there is about 865.4ha of beach above 2-3m and about 166.7ha available for land reclamation. The eastern bank of Wusongkou is used as a 2,000m bathing beach. 3.1.6. GROUNDWATER In the area of Shanghai, the ground water level is relatively high with the water table depth ranging from 0.5 to 1.5m. The deep groundwater in Shanghai area is mainly stored in the sand and gravel soils of variable thickness. There are four types of aquifers in the area located to depth ranging from 20-30m to 240-250m. Shallow groundwater is brackish and becomes fresher with depth. The ground water in the shallow layers has been widely exploited. 3.1.7. NATURAL DISASTER The district is located at the front edge of Yangtze Delta in the mid-latitude of Latitude North, which is affected by monsoon with variable and complex climate and frequent hazardous weather. • Typhoon: The typhoon period is from July to September every year. Typhoon intensity is amplified when there are meteorological tides. • Drought: The drought happens between summer and autumn, with tens of years historical record. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 20 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT • Hailstorm: It happens normally between April and August, for example, in 1971, 1975, 1977 and 1985. • Tornado: Tornado happened in September in 1956, 1962 and 1976, which brought severe damage to the local area. • Earthquake: The project area is located to the east of seismic region of Kunshan-Huzhou in the Yangtze Delta which experience occasional low frequency earthquake. The national anti-seismic standard for Shanghai construction is 6 Degree. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 21 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 4. IMPACT ASSESSMENT AND MITIGATION The project’s objective is to improve the water supply, the waste water management and the solid waste management in Shanghai in order to increase the quality of life of the urban residents and to comply with national and Shanghai environmental plans. The eventual environmental impacts of such projects are obviously beneficial. However, some impacts with detrimental effects may result from projects implementation, mainly during its construction, with significant land acquisition and resettlement issues, as well as local impacts directly involved by construction activities. The following tables summarize the overall and site specific impacts anticipated from the implementation of the project components and the mitigation measures already proposed in the EA studies. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 22 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 2: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 WATER COMPONENTS FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Changqiao Water treatment upgrading Impacts on land use, Changqiao Water treatment upgrading Project will involve See Resettlement Action Plan. land acquisition and the acquisition of 90mu. The land acquisition will affect 48 resettlement houses and 5 companies. For land acquisition and resettlement, ensure procedures follow Chinese regulations and WB Safeguards OP 4.12 The project will also temporarily occupy a total of 101mu and OP 4.20 land General impacts from Construction of some facilities will be distributed over Setting up of a strong organization for works Creation of the Environmental and Social construction activities densely built urban area, with high risks of detrimental environmental supervision and monitoring, with staff and Department (ESD) inside project’s PMO and of the impacts regarding nuisances and public safety if works do clear operational procedures for rapid and effective Environmental and Social Unit (ESU) inside the not cope with international standards and good practices. treatment of non-compliance. Construction Supervision Engineer organization. Preparation of detailed environmental and social Environmental and Social Field Inspectors provide specifications for the contractors, to be part of the bidding routine monitoring of activity. documentation. Contractor environmental obligations are part of the contract documentation. Payment procedures for environmental activities of the contractor follow an incentive approach. Impacts from Large quantities of spoil will result from earthwork A detailed construction program, including phasing, earthworks and spoil excavation and from building demolition. proposal for transport route and description of proposed production, handling disposal sites, will be required from the concerned and disposal No information in the EA reports about the quantity and the contractors prior to start the works. quality Dust and sediment discharge to reservoir and rivers may Appropriate management of earthworks in accordance Most of technical measures described in the occur from uncovered and unconsolidated materials during with the contractor environmental specifications. This will Chinese regulation “Temporary regulation on earthworks in dry season. include rules for piling, compacting and spraying spoil construction and environmental management of while waiting evacuation or reuse. Temporary storage of construction sites”. Dust may affect resident population in the areas where earth piles will drain into sedimentation basin before trunks are laid down. discharge of run-off to the river. Transport of material as earth fill, earth spoil, sand and Washing station for trucks leaving construction sites to gravel to or from site may affect urban areas crossed by the limit mud transport in city roads, strict obligations trucks if appropriate measures are not implemented, regarding size of trucks, of load, necessary load cover, resulting in serious impacts on road traffic, public safety, air routes and timing will be imposed to concerned quality and noise. contractor. Impacts on air quality Impacts concern is mainly due to the location in dense Monitoring of construction sites to focus primarily in urban Compliance monitoring to be performed by and noise urban areas. Fumes and exhaust gas from trucks and construction sites. Specifications regarding operation and Contractors, with random controls of EPB. heavy machinery on construction sites may affect air maintenance of construction equipment and transport of quality, as well as dust from material transport by trucks and materials by truck. earthworks. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 23 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Noise from heavy machinery could be divided in to two Enforcement of existing noise standards related to Compliance monitoring to be performed by parts: fixed acoustical noise and transport vehicles noise. machinery and working period. Contractors, with random controls of EPB. Forbidding the use of certain works during nigh-time. Impacts on solid Impact of the domestic refuse produced by the construction Public information and appropriate construction practices Use of internet site and poster campaigns to inform waste staff. The total quantity is estimated to 216t. and organization, with road signs and coordination with population on work schedule and location will help traffic Police will minimize impacts and ease traffic during reducing traffic disruption or congestion. works. Impacts on water Construction wastewater and domestic sewage during Wastewater will be discharged after treatment when the Compliance monitoring to be performed by quality construction will be discharged into the environment and standards are respected. Contractors, with random controls of EPB. may result in impact on river quality. Wastewater generated during construction of the water Pollution hazard may also result from heavy operating intake will be recovered and not discharged into the machinery, from storage of potential pollutants, such as reservoir. petrol or engine oils, from concrete production, from drainage of earth stock piles, from inappropriate disposal of Strict contractor environmental specifications regarding used engine oils and locally generated waste (workshops, the handling, storage or disposal of hazardous products labor camps). and of waste produced on the construction sites. Compliance monitoring of drainage water quality from sites and enforcement of effluent standards. Management measures at work site oriented towards prevention of pollution or accidental spill. Monitoring of river quality upstream and downstream construction sites. Impacts on wildlife No impact is anticipated on construction sites and habitats Impacts on public If inappropriately managed, workforce may create relational Awareness training of all workers on environmental and ESD/ESU assist in training workers on 4 health problems with surrounding residents. social issues. environmental basics and justification of mitigation measures. If inappropriately managed, labor camps may become the Strict obligations imposed to the contractor for the site of epidemic burst out among workers and spread to organization and the management of labor force and Contractor requested to have recruitment medical surrounding population. camps. check for each worker, and medical visit once a Contractor to prepare a CSEMP for approval. Monitoring year. Availability of medicine in case of epidemic of labor camps and of worker health conditions by the will be requested at workers camps (dormitory or ESU and Department of Public Health. canteens). Impacts on on-site Occupational health and accident issues, resulting in Contractor to prepare a CSEMP for approval. In this plan, Monitoring of construction sites by ESU. public safety serious wounds or death of workers. contractor will clearly define the safety procedures in case of accident on site, ensure that minimum first aid equipment is available on all sites and ensure availability and enforcement to wear PPE (personal protective equipment). 4 No information in Chinese EA on public health and safety issues during construction SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 24 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Impacts on off-site Risk is higher for components located in densely populated Strict clauses imposed to the contractor for the Monitoring by ESFIs. public safety areas. implementation of acceptable standards for the safety of Increased traffic of trucks on some road sections may residents surrounding construction sites: fencing, increase risk of traffic accident. information to concerned residents, access to roads and For network component, increase risk of traffic accident buildings, procedure if road accident. because the alteration of the road traffic and risk for Detailed specifications on traffic regulation inside and residents if excavation and works in the streets are not well outside the construction area to be prepared. isolated and protected from public area. Impacts on cultural No impact is anticipated on construction sites heritage SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 25 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 2 - ISSUES ASSOCIATED WITH THE OPERATION STAGE – Changqiao Water treatment upgrading Impact on the quality The upgrading Changqiao Water Treatment Plant will No mitigation measure required. For improvements in tap water quality to be of life improve the water quality and quantity distributed in the city achieved, need to be associated with to resolve the existing problems on the water supply. accompanying measures including • Effective water resources protection • Improvements in distribution networks Impact on surface The water quality in Huangpu river will not be impacted by water the Changqiao project, but pollutions could occur from industrial effluents in the river. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 26 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Generated wastewater after water utilization in the current service area is not likely to increase. Existing wastewater facilities exist in the service area.. Impact of noise No details information in the EA reports, only location of the Enforcement of existing noise standards related to Monitoring to be carried out on a random basis by noise source and sensitive points. machinery and working period. EPB. The noise impact is mainly due to the pumping and the ozone production. Impact on air Chlorine has strong irritating characters, with the maximum Tanks storage room should be air tight Remedial measures to be also carried out on pollution concentration present in the factory. existing plant Sun light (i/e large windows) has to be avoided, because Ozone is not poisonous but with highly oxidation power. heating of chlorine tanks. Ozone can irritate and damage respiratory system. Direct circulations with others rooms (evaporation, Ammonia: Mixing with air, ammonia can be exploded once dosage, etc.) have to be cancelled). The only possible contact with fire entrance has to be the main door where chlorine tanks are unloaded. Ammonia: high concentration can injured. A complete system of gas leakage detection, with suction conducts and a gas scrubber plant has to be provided. Safety equipement (eyes rinser, shower, gas masks, oxygen device saving system, etc.) has to be provided Impact of the waste The waste activated Carbon from the process could Periodical collection and reclaim. activated Carbon become a potential pollution source. Regeneration of the activated Carbon. Impact of the The impact due to the production of domestic rubbish will domestic rubbish be similar than the actual: the staff will be unchanged. Impact of sludge Sludge from Changqiao WTP could become a potential pollution source for surface water and groundwater. However the impacts are minor because it basically contains no harmful substances. Impact on the water No impact, the water resource will be unchanged resource SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 27 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 3: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF QINGPU WATER NETWORK EXTENSION FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Qingpu Water network extension Impacts on land use, No information in the EA reports See Resettlement Action Plan. land acquisition and resettlement For land acquisition and resettlement, ensure procedures follow Chinese regulations and WB Safeguards OP 4.12 General impacts from Construction of some facilities will be distributed over and OP 4.20 construction activities densely built urban area, with high risks of detrimental impacts regarding nuisances and public safety if works do not cope with international standards and good practices. Impacts from Large quantities of spoil will result from earthwork Setting up of a strong organization for works Creation of the Environmental and Social earthworks and spoil excavation and from building demolition. environmental supervision and monitoring, with staff and Department (ESD) inside project’s PMO and of the production, handling clear operational procedures for rapid and effective Environmental and Social Unit (ESU) inside the and disposal The quantity of soiled is about 31570 m3. treatment of non-compliance. Construction Supervision Engineer organization. Preparation of detailed environmental and social Environmental and Social Field Inspectors provide specifications for the contractors, to be part of the bidding routine monitoring of activity. documentation. Contractor environmental obligations are part of the contract documentation. Payment procedures for environmental activities of the contractor follow an incentive approach. Dust and sediment discharge to reservoir and rivers may A detailed construction program, including phasing, occur from uncovered and unconsolidated materials during proposal for transport route and description of proposed earthworks in dry season. disposal sites, will be required from the concerned contractors prior to start the works. Dust may affect resident population in the areas where trunks are laid down. Transport of material as earth fill, earth spoil, sand and Appropriate management of earthworks in accordance Most of technical measures described in the gravel to or from site may affect urban areas crossed by the with the contractor environmental specifications. This will Chinese regulation “Temporary regulation on trucks if appropriate measures are not implemented, include rules for piling, compacting and spraying spoil construction and environmental management of resulting in serious impacts on road traffic, public safety, air while waiting evacuation or reuse. Temporary storage of construction sites”. quality and noise. earth piles will drain into sedimentation basin before discharge of run-off to the river. Impacts on solid No information in the EA reports Washing station for trucks leaving construction sites to waste limit mud transport in city roads, strict obligations regarding size of trucks, of load, necessary load cover, routes and timing will be imposed to concerned contractor. Impacts on air quality Impacts concern is mainly due to the location in dense Monitoring of construction sites to focus primarily in urban Compliance monitoring to be performed by and noise urban areas. Fumes and exhaust gas from trucks and construction sites. Specifications regarding operation and Contractors, with random controls of EPB. heavy machinery on construction sites may affect air maintenance of construction equipment and transport of SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 28 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS quality, as well as dust from material transport by trucks and materials by truck. earthworks. Noise from heavy machinery could be divided in to two Enforcement of existing noise standards related to Compliance monitoring to be performed by parts: fixed acoustical noise and transport/construction machinery and working period. Contractors, with random controls of EPB. vehicles noise. Forbidding the use of certain works during nigh-time. Impacts on water The domestic sewage construction will produce sludge Wastewater will be discharged after treatment when the Compliance monitoring to be performed by quality water (main pollutant SS) which it will be discharged into standards are respected. Contractors, with random controls of EPB. the environment and may result in impact on river quality. Wastewater generated during construction of the water Pollution hazard may also result from heavy operating intake will be recovered and not discharged into the machinery, from storage of potential pollutants, such as reservoir. petrol or engine oils, from concrete production, from drainage of earth stock piles, from inappropriate disposal of Strict contractor environmental specifications regarding used engine oils and locally generated waste (workshops, the handling, storage or disposal of hazardous products labor camps). and of waste produced on the construction sites. Compliance monitoring of drainage water quality from sites and enforcement of effluent standards. Management measures at work site oriented towards prevention of pollution or accidental spill. Monitoring of river quality upstream and downstream construction sites. Impacts on wildlife The impact on the natural environment is limited. The and habitats ecological environment of the region is medium. Impacts on public No information in the EA reports Awareness training of all workers on environmental and ESD/ESU assist in training workers on health social issues. environmental basics and justification of mitigation measures. Strict obligations imposed to the contractor for the organization and the management of labor force and Contractor requested to have recruitment medical camps. check for each worker, and medical visit once a Contractor to prepare a CSEMP for approval. Monitoring year. Availability of medicine in case of epidemic of labor camps and of worker health conditions by the will be requested at workers camps (dormitory or ESU and Department of Public Health. canteens). Impacts on on-site No information in the EA reports Contractor to prepare a CSEMP for approval. In this plan, Monitoring of construction sites by ESU. public safety contractor will clearly define the safety procedures in case of accident on site, ensure that minimum first aid equipment is available on all sites and ensure availability and enforcement to wear PPE (personal protective equipment). Impacts on off-site No information in the EA reports Strict clauses imposed to the contractor for the Monitoring by ESFIs. public safety implementation of acceptable standards for the safety of residents surrounding construction sites: fencing, information to concerned residents, access to roads and buildings, procedure if road accident. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 29 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Detailed specifications on traffic regulation inside and outside the construction area to be prepared. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 30 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 2 - ISSUES ASSOCIATED WITH THE OPERATION STAGE – Qingpu Water network extension Impact on the quality The construction will improve the water quality and quantity of life distributed in the old town to resolve the existing problems on the water supply. Impact on surface Generated wastewater after water utilization in the city will Implementation of Qingpu District Wastewater Masterplan One project in Huaxin is proposed as part of the water increase. According to planning, the wastewater treatment DFV capacity needs to be upgraded. Impact on air Not relevant pollution Impact on the noise The noise impact is mainly due to the pumping. Impact of the solid Not relevant waste SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 31 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 4: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF MAIN NETWORK REHABILITATION FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Main network rehabilitation Impacts on land use, No land acquisition required land acquisition and resettlement General impacts from Approaches to be adapted will minimize impacts by the use Adhere to APL Resettlement Framework construction activities of “trenchless technologies”; however, dependent on exact technology adopted some small access sites will be required causing small amounts of disruption Impacts from Approaches to be adapted will minimize impacts by the use Adhere to EA Framework and EMP earthworks and spoil of “trenchless technologies”; however, dependent on exact production, handling technology adopted some small access sites will be and disposal required causing small amounts of spoil Impacts on air quality Approaches to be adapted will minimize impacts by the use and noise of “trenchless technologies”; however, dependent on exact technology adopted noise impacts will differ Impacts on water No impacts quality Impacts on wildlife No impacts and habitats Impacts on public As before impacts minimized due to small size of Adhere to EA Framework and EMP health construction footprint Impacts on on-site As before impacts minimized due to small size of Adhere to EA Framework and EMP public safety construction footprint Impacts on off-site As before impacts minimized due to small size of Adhere to EA Framework and EMP public safety construction footprint FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 2 - ISSUES ASSOCIATED WITH THE OPERATION STAGE – Main network rehabilitation Impact on the quality The construction will improve the water quality and quantity of life distributed in the old town to resolve the existing problems on the water supply. Impact on surface No impact water SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 32 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Impact on air Not relevant pollution Impact on the noise No impact Impact of the solid Not relevant waste SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 33 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 5: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF MINHANG WATER SUPPLY PROJECT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Minhang secondary Water treatment project Impacts on land use, Minhang Water treatment upgrading Project will involve See Resettlement Action Plan. land acquisition and the acquisition of 13333 m2. The land acquisition will affect resettlement For land acquisition and resettlement, ensure procedures 48 houses and 5 companies. follow Chinese regulations and WB Safeguards OP 4.12 General impacts from Construction of some facilities will be distributed over and OP 4.20 construction activities densely built urban area, with high risks of detrimental impacts regarding nuisances and public safety if works do not cope with international standards and good practices. Impacts from Large quantities of spoil will result from earthwork Setting up of a strong organization for works earthworks and spoil excavation and from building demolition. environmental supervision and monitoring, with staff and production, handling clear operational procedures for rapid and effective and disposal No information in the EA reports about the quantity and the treatment of non-compliance. quality Preparation of detailed environmental and social specifications for the contractors, to be part of the bidding documentation. Contractor environmental obligations are part of the contract documentation. Payment procedures for environmental activities of the contractor follow an incentive approach. Dust and sediment discharge to reservoir and rivers may A detailed construction program, including phasing, occur from uncovered and unconsolidated materials during proposal for transport route and description of proposed earthworks in dry season. disposal sites, will be required from the concerned contractors prior to start the works. Dust may affect resident population in the areas where trunks are laid down. Transport of material as earth fill, earth spoil, sand and Appropriate management of earthworks in accordance gravel to or from site may affect urban areas crossed by the with the contractor environmental specifications. This will trucks if appropriate measures are not implemented, include rules for piling, compacting and spraying spoil resulting in serious impacts on road traffic, public safety, air while waiting evacuation or reuse. Temporary storage of quality and noise. earth piles will drain into sedimentation basin before discharge of run-off to the river. Impacts on air quality Impacts concern is mainly due to the location in dense Monitoring of construction sites to focus primarily in urban Compliance monitoring to be performed by and noise urban areas. Fumes and exhaust gas from trucks and construction sites. Specifications regarding operation and Contractors, with random controls of EPB. heavy machinery on construction sites may affect air maintenance of construction equipment and transport of quality, as well as dust from material transport by trucks and materials by truck. earthworks. Noise from heavy machinery could be divided in to two Enforcement of existing noise standards related to Compliance monitoring to be performed by parts: fixed acoustical noise and transport vehicles noise. machinery and working period. Contractors, with random controls of EPB. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 34 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Forbidding the use of certain works during nigh-time. Impacts on solid Impact of the domestic refuse produced by the construction Public information and appropriate construction practices Use of internet site and poster campaigns to inform waste staff. The total quantity is estimated to 37t. and organization, with road signs and coordination with population on work schedule and location will help traffic Police will minimize impacts and ease traffic during reducing traffic disruption or congestion. works. Impacts on water Construction wastewater and domestic sewage during Wastewater will be discharged after treatment when the Compliance monitoring to be performed by quality construction will be discharged into the environment and standards are respected. Contractors, with random controls of EPB. may result in impact on river quality. Wastewater generated during construction of the water Pollution hazard may also result from heavy operating intake will be recovered and not discharged into the machinery, from storage of potential pollutants, such as reservoir. petrol or engine oils, from concrete production, from drainage of earth stock piles, from inappropriate disposal of Strict contractor environmental specifications regarding used engine oils and locally generated waste (workshops, the handling, storage or disposal of hazardous products labor camps). and of waste produced on the construction sites. Compliance monitoring of drainage water quality from sites and enforcement of effluent standards. Management measures at work site oriented towards prevention of pollution or accidental spill. Monitoring of river quality upstream and downstream construction sites. Impacts on wildlife No information in the EA reports and habitats Impacts on public No information in the EA reports Awareness training of all workers on environmental and ESD/ESU assist in training workers on health social issues. environmental basics and justification of mitigation measures. Strict obligations imposed to the contractor for the organization and the management of labor force and Contractor requested to have recruitment medical camps. check for each worker, and medical visit once a Contractor to prepare a CSEMP for approval. Monitoring year. Availability of medicine in case of epidemic of labor camps and of worker health conditions by the will be requested at workers camps (dormitory or ESU and Department of Public Health. canteens). Impacts on on-site No information in the EA reports Contractor to prepare a CSEMP for approval. In this plan, Monitoring of construction sites by ESU. public safety contractor will clearly define the safety procedures in case of accident on site, ensure that minimum first aid equipment is available on all sites and ensure availability and enforcement to wear PPE (personal protective equipment). Impacts on off-site No information in the EA reports Strict clauses imposed to the contractor for the Monitoring by ESFIs. public safety implementation of acceptable standards for the safety of residents surrounding construction sites: fencing, information to concerned residents, access to roads and buildings, procedure if road accident. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 35 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Detailed specifications on traffic regulation inside and outside the construction area to be prepared. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 36 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 2 - ISSUES ASSOCIATED WITH THE OPERATION STAGE – Minhang secondary Water treatment project Impact on the quality The Minhang secondary Water treatment project will No mitigation measure required. For improvements in tap water quality to be of life improve the water quality and quantity distributed in the city achieved, need to be associated with to resolve the existing problems on the water supply. accompanying measures including • Effective water resources protection • Improvements in distribution networks Impact on surface The water quality in Huangpu river will not be impacted by water the Minhang project, but pollutions could occur from industrial effluents in the river. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 37 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Generated wastewater after water utilization in Shanghai city will increase. But according to planning (SSP2), the wastewater treatment capacity will be sufficient. Impact of noise No details information in the EA reports, only location of the noise source and sensitive points. The noise impact is mainly due to the pumping and the ozone production. Impact on air Chlorine has strong irritating characters, with the maximum Tanks storage room should be air tight Remedial measures to be also carried out on pollution concentration present in the factory. existing plant Sun light (i/e large windows) has to be avoided, because Ozone is not poisonous but with highly oxidation power. heating of chlorine tanks. Ozone can irritate and damage respiratory system. Direct circulations with others rooms (evaporation, Ammonia: Mixing with air, ammonia can be exploded once dosage, etc.) have to be cancelled). The only possible contact with fire entrance has to be the main door where chlorine tanks are unloaded. Ammonia: high concentration can injured. A complete system of gas leakage detection, with suction conducts and a gas scrubber plant has to be provided. Safety equipement (eyes rinser, shower, gas masks, oxygen device saving system, etc.) has to be provided Impact of the waste The waste activated Carbon from the process could Periodical collection and reclaim. activated Carbon become a potential pollution source. Regeneration of the activated Carbon. Impact of the The impact due to the production of domestic rubbish will domestic rubbish be similar than the actual: the staff will be unchanged. Impact of sludge Sludge from Minhang WTP could become a potential pollution source for surface water and groundwater. However the impacts are minor because it basically contains no harmful substances. Impact on the water No impact, the water resource will be unchanged resource SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 38 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 6: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 WASTEWATER COMPONENTS FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Shanghai Waste Water Project Impacts on land use, WTS - Western Trunk Sewer Project will involve the Farmers: (A) work at a governmental business or Farmer contractors will be warned sufficiently in land acquisition and acquisition of 153,390m2 of land for the implementation of institutions, (B) governmental subsidiaries (lump sum in advance for them to find alternative jobs. resettlement the 24.45km sewer pipe and 39,080m2 of land for the one time) for relocation, (C) governmental pension for construction or the upgrade of the pumping stations elderly people. See Resettlement Action Plan. The relocation of farmers can improve their quality of life. Residents: (A) Relocation at nearby new town. (B) Construction of their own house on a given piece of land Ensure activities are carried out in pre-construction with funds obtained for compensation. (C) Obtain financial period in order to cope with project construction compensation for resettlement. schedule. Businesses: (A) Relocation accordingly to the town plan. (B) Financial compensation Actions will undertaken jointly by the Shanghai City Draining Company Ltd and Local Authority For land acquisition and resettlement, ensure procedures follow Chinese regulations and WB Safeguards OP 4.12 and OP 4.20 WTS - Western trunk Sewer construction will use Financial compensation for lack of income due to Compensation fees (greater than loss) should be temporarily 222,215m2 including 175,688m2 for the disruption of farming activites. planned. construction of the western sewer pipe and 46,527m2 for the branch connection. The vegetable farming production See Resettlement Action Plan. Any need for temporary land outside project sites will be impacted and farmers’ income will decrease. will involve a procedure of approval by ESD prior to For land acquisition and resettlement, ensure procedures land occupation. follow Chinese regulations and WB Safeguards OP 4.12 and OP 4.20 BSMF - The Bailonggang Management Facility will be No mitigation required located at the WWTP and does not require any land acquisition General impacts from WST and BSMF - For the Western Trunk Sewer, Setting up of a strong organization for works Creation of the Environmental and Social construction activities construction of facilities will be distributed all over a densely environmental supervision and monitoring, with staff and Department inside project’s PMO and of the built urban area, with high risks of detrimental impacts clear operational procedures for rapid and effective Environmental and Social Unit inside the regarding nuisances and public safety if works do not cope treatment of non-compliance. Construction Supervision Engineer organization with international standards and good practices. Preparation of detailed environmental and social Environmental and Social field Inspectors provide specifications for the contractors, to be part of the bidding routine monitoring of activity. documentation. Contractor environmental obligations are part of the contract documentation. Payment procedures for environmental activities of the SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 39 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS contractor follow an incentive approach. Impacts from WTS - Large quantities of spoil will result from earthwork Spoil from sewage pipeline system will be reuse for 3 earthworks and spoil excavation. backfill as much as possible, and then only 70,000m will production, handling 3 be disposed in a landfill. and disposal About 164,000 m of excavation spoil is anticipated from project, mainly from the construction of the sewage pipeline A detailed construction program, including phasing, system. proposal for transport route and description of proposed disposal sites, will be required from the concerned contractors prior to start the works. WST and BSMF - Dust and sediment discharge to canals Appropriate management of earthworks in accordance Most of technical measures described in the and rivers may occur from uncovered and unconsolidated with the contractor environmental specifications. This will Chinese regulation “Temporary regulation on materials during earthworks in dry season. include rules for piling, compacting and spraying spoil construction and environmental management of while waiting evacuation or reuse. Temporary storage of construction sites”. Dust from earth excavation and spoil transportation may earth piles will drain into sedimentation basin before affect surrounding vegetation and population. discharge of run-off to the river. The construction agency should comply with the Shanghai Management Method for the flying dust pollution prevention. WST and BSMF - Transport of material as earth fill, earth Washing station for trucks leaving construction sites to spoil, sand and gravel to or from site may affect urban limit mud transport in city roads, strict obligations areas crossed by the trucks if appropriate measures not regarding size of trucks, of load, necessary load cover, implemented, resulting in serious impacts on road traffic, routes and timing will be imposed to concerned public safety, air quality and noise. contractor. Impact from WST - Demolition material may contain hazardous material. The EPB should be informed prior to demolition of the hasardous wastes building or of any hazardous wastes and adequate During construction hazardous wastes may be measures should be taken before works continue. encountered. Impact from WST and BSMF - The construction will involve numerous The local sanitation bureau should be informed of the construction workers workers which will produce sanitary wastes and domestic work campsite in order to ensure quick collection of the wastes which may cause sanitation issues. wastes and construction workers should be made ware of good practice for waste handling. Impact of traffic WST - The route of the sewer crosses multiple roads, The Design institute must carry out a comparative farming lane and rivers. analysis to determine the route for which there is the less impact. The road traffic at the site and in the surroundings may be aggravated by road diversion or lane narrowing. Temporary road or bridges should be built. Works should be limited during rush hours and stock piles should be The farming lanes may be cut-off which will impact farmers removed promptly. work and stop crop production. Construction agency should inform navigation The fluvial traffic may be disrupted. administration agencies of the construction works and works should be sign posted and traffic should be coordinated with police. Impacts on air quality WTS - Impacts concern mainly the components located in Monitoring of construction sites to focus primarily in urban Compliance monitoring to be performed by and noise dense urban areas. Fumes and exhaust gas from trucks construction sites. Specifications regarding operation and Contractors, with random controls of EPB. and heavy machinery on construction sites may affect air maintenance of construction equipment and transport of SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 40 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS quality, as well as dust from material transport by trucks and materials by truck. earthworks. WTS - Noise from heavy machinery, particularly along the Enforcement of existing noise standards related to Compliance monitoring to be performed by sewage pipelines and pumping stations construction. machinery and working period. Contractors, with random controls of EPB. Forbidding the use of certain works during night-time. Temporary fence should be used around construction sites. WTS - Traffic congestion resulting from sewage pipelines Public information and appropriate construction practices Use of internet site and poster campaigns to inform and pump stations construction may result in temporary and organization, with road signs and coordination with population on work schedule and location will help higher levels of pollutants (TSP, NOx, CO). traffic Police will minimize impacts and ease traffic during reducing traffic disruption or congestion. works. BSMF - Impact from construction site of Bailonggang is Adequate transportation timing (forbidden traffic from Construction works should be carried out considered low as surrounding receptors are located 11.00PM to 6.00AM) and route should be selected to accordingly with the “Shanghai Dust Pollution 1,500m away. However, impact from truck traffic is a minimize the impact from traffic. Prevention and Control Policy and method” concerned. Impacts on water WTS and BSMF - Impact of run-off water containing high Drainage water or pumped groundwater should be Compliance monitoring to be performed by quality SS and BOD and COD and nitrogen particles which may intercepted into a settling tank before discharge into water Contractors, with random controls of EPB. discharge in the environment. course or drainage network. Groundwater with high SS content encountered during Strict contractor environmental specifications regarding excavation works will be pumped and discharged in the the handling, storage or disposal of hazardous products drainage or water course. and of waste produced on the construction sites. Pollution hazard may also result from heavy operating Compliance monitoring of drainage water quality from machinery, from storage of potential pollutants as petrol or sites and enforcement of effluent standards. Management engine oils, from concrete production, from drainage of measures at work site oriented towards prevention of earth stock piles, from inappropriate disposal of used pollution or accidental spill. engine oils and locally generated waste (workshops, labor camps). Monitoring of river quality upstream and downstream construction sites. Impact on farming WTS - Temporarily occupied land will represent 222,150m2 Minimize disturbance of the structure of the ground during activities for the sewage pipelines construction. The quality and the construction. fertility of farmland may be impacted due to stockpile of construction material and compaction of the ground. Re-instatement of the farmland to its original condition and ensure farming productivity Addition of fertilizers if necessary. WTS - Uncontrolled drainage water from construction may Construction contractor should have a good knowledge of disperse into farmland and impact the soil fertility. topography and drainage system. WTS - Impact on irrigation systems and farmers income Construction plan should identify alternative water source due to excavation works for irrigation SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 41 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Impacts on public WTS and BSMF - If inappropriately managed, workforce Awareness training of all workers on environmental and ESD/ESU assist in training workers on health may create relational problems with surrounding residents. social issues. environmental basics and justification of mitigation measures. If inappropriately managed, labor camps may become the Strict obligations imposed to the contractor for the site of epidemic burst out among workers and spread to organization and the management of labor force and Contractor requested to have recruitment medical surrounding population. camps. check for each worker, and medical visit once a Contractor to prepare a CSEMP for approval. Monitoring year. Availability of medicine in case of epidemic of labor camps and of worker health conditions by the will be requested at workers camps (dormitory or ESU and Department of Public Health. canteens). Impacts on on-site WTS and BSMF Occupational health and accident issues, Contractor to prepare a CSEMP for approval. In this plan, Monitoring of construction sites by ESU. public safety resulting in serious wounds or death of workers. contractor will clearly define the safety procedures in case of accident on site, ensure that minimum first aid equipment is available on all sites and ensure availability and enforcement to wear PPE (personal protective equipment). WTS -Trench shoring collapse leading to damage to Correctly designed and tested temporary works structures adjoining property and endangering life of workforce. and operational procedures. On site checks on frequent basis. Access to deep open trenches with danger to public safety Open trenches to be kept to minimum and severely fenced, especially after working hours. Security guard employed to monitor safety issues. Impacts on off-site Risk is higher for components located in densely populated Strict clauses imposed to the contractor for the Monitoring by ESFIs. public safety areas. implementation of acceptable standards for the safety of residents surrounding construction sites: fencing, Increased traffic of trucks on some road sections may information to concerned residents, access to roads and increase risk of traffic accident. buildings, procedure if road accident. For network component, increase risk of traffic accident Detailed specifications on traffic regulation inside and because the alteration of the road traffic and risk for outside the construction area to be prepared. residents if excavation and works in the streets are not well isolated and protected from public area. Impact on public WTS - Interruption or damage of the public services The Design Institute should select a route for the sewer underground services (communication, power, water, etc..) due to construction which avoids underground services. If it is not possible, works. the relevant service department should be informed prior construction and mitigation measures should be taken. Impacts on loss of WTS - The western trunk project will demolish 930m2 of Two rows of trees should be replanted on both side of the green areas tree which will affect the surrounding environment and the sewer route and natural vegetation impacted by the landscape. construction should recover its original condition with time. Impacts on cultural WTS - No impact is anticipated on construction sites. Specific procedures if underground artifacts are identified heritage Possible presence of archaeological or historical artifacts during excavation works in coordination with ESU. under the future excavations. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 42 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT (TABLE XX CONTINUED) FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 2 - ISSUES ASSOCIATED WITH THE OPERATION STAGE – Shanghai Wastewater Project Impact on the quality WTS - Construction of Western trunk Sewer will improve No mitigation measure required. of life the quality of life and surrounding environment by increasing inhabitants’ safety and promoting social and economical development.. Impact on waste WTS - The Western trunk sewer will improve the collection No mitigation required. water management and management of waste water in the northern area of Shanghai. BSMF - The sludge treatment facility will enable to achieve and promote better sludge management in the area of Shanghai Inhabitant safety WTS - The derelict part from existing sewer may affect An adequate management of the sewer should be inhabitant safety. Risk of collapsing. established to ensure the safety of the existing sewer. Impact on water WTS - The western sewer discharge waste water in the Compliance monitoring of effluents should be performed Random controls of effluent quality should be quality Shidongkou WWTP. The change of sewage characteristics by operators. performed by EPB. may impact the functioning of the WWTP and the discharge quality in the water course. Monitoring of water quality in river at discharge point by EPB. BSMF - After stabilization, the sludge will not be disposed in Monitoring of groundwater and surface water quality sludge lagoons and potential future leaching of within the sludge disposal lagoon area. contaminants should be reduced. Quality of the surrounding groundwater and surface water should be improved Impact on air quality WTS - Odorous pollutants will be produced in pumping Odour removal measures should be undertaken. Monitoring to be carried out on a random basis by and odors stations. The odour assessment showed that the odour EPB. produced by the Xincun road pumping station may have an Planting of vegetation which has odour adsorbing impact on surrounding building. properties at the pumping station. The protective sanitary distance (40m) should be respected. Generally, pumping station should be constructed at least 5 m from residential housing and any development should be located at least 40m away any pumping station grid. BSMF - The cumulative odor and gas impact from the An adequate odour removal system should be utilized at Baillongang sludge treatment facility and the WWTP. the sludge treatment plant and the Design Institute should carry a comparative analysis to select the best odour removal system. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 43 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Impact of noise WTS - Noise assessment from pumping stations indicated Measures as soundproofing of the outer wall of the Monitoring to be carried out on a random basis by that there are no impact from water pump, but may have an ventilation system, adequate location and tree planting EPB. impact if air ventilation system is used. around the pumping stations should be envisaged in order to noise level to meet the class II standard. BSMF - Forecasted night noise level at Bailonggang WWTP Low equipment noise should be used, building should be slightly exceeds required Class II standard for factory sound insulated and green belt around plant should be boundaries. There is no noise impact on the Chaoyang planted. village. Impact from WTS - The operation of the western sewer trunk may be Inform and train staff of potential risks. Design the accidental risks impacted by accidental risk such as accidental cracks and western trunk sewer to withstand risks. breakage of pipeline, natural disasters, noxious gas discharge, accidental power cut, and accidental discharge to storage tank. BSMF - Risk of explosion from methane produced from Training for staff, installation of an automatic control digestion. system and strict risk management procedures. Impact of sludge BSMF - Transportation to the landfill disposal site Sludge should be promptly moved away from the site and short term watertight transportation vehicle should be utilized. Transportation route should minimize impact of noise, dust and traffic. Impact of sludge long BSMF - Transportation to the disposal site Sludge should be promptly moved away from the site and term airtight transportation vehicle should be utilized. Transportation route should minimize impact of noise, dust and traffic. BSMF - Impact of the sludge on the receiving site Monitoring of the soil should be undertaken and if the soil Monitoring carried out by the EPB? results do not comply with the relevant standards, the groundwater, the drainage water quality of the receiving site should be monitored. Impact on waste WTS and BSMF - The quantity of solid and water waste The sanitation bureau should collect solid wastes and water and solid waste produced by the staff or process of the pumping stations or waste water can be re-circulated in the sewer / waste from operation staff the sludge treatment remain relatively small. The impact is water treatment plant. and process considered low if the waste adequately managed. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 44 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 7: SUMMARY OF IMPACTS AND MITIGATION MEASURES OF SHUEP APL2 SOLID WASTE COMPONENTS FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS 1 - ISSUES ASSOCIATED WITH THE CONSTRUCTION STAGE – Shanghai Solid Waste Project Impacts of land use, Sanlin – No demolition of residential houses, business Farmers: (A) work at a governmental business or Farmer contractors will be warned sufficiently in land acquisition and building or facilities is involved in this project, except for the institutions, (B) governmental subsidiaries (lump sum in advance for them to find alternative jobs. resettlement acquisition of the derelict deep quarrying pit. one time) for relocation, (C) governmental pension for elderly people. See Resettlement Action Plan. The relocation of farmers can improve their quality of life. Residents: (A) Relocation at nearby new town. (B) Construction of their own house on a given piece of land Ensure activities are carried out in pre-construction with funds obtained for compensation. (C) Obtain financial period (Feb to August 2005) in order to cope with compensation for resettlement. project construction schedule. Businesses: (A) Relocation accordingly to the town plan. (B) Financial compensation Actions will be undertaken by Shanghai Solid Waste Disposal Administration Company For land acquisition and resettlement, ensure procedures follow Chinese regulations and WB Safeguards OP 4.12 and OP 4.20 See Resettlement Action Plan. Chenshan – Land acquisition of the quarry is required Financial compensation for the transfer of land use right Need to confirm the compliance with the planning Gucun – Resettlement of residents close to the dumpsite is Financial compensation for lack of income due to Compensation fees (greater than loss) should be required. disruption of farming activities. planned. See Environmental Impact Assessment. Any need for temporary land outside project sites will involve a procedure of approval by ESD prior to For land acquisition and resettlement, ensure procedures land occupation. follow Chinese regulations and WB Safeguards OP 4.12 and OP 4.20 Minhang – No land acquisition is required for dumpsite Residents to the west need relocation. (See Detail not available from EA; No RAP available closure Environmental Impact Assessment) General impacts from Sanlin, Chenshan, Minhang and Gucun - For the closure Setting up of a strong organization for works Creation of the Environmental and Social construction activities of the dumpsites, high risks of detrimental impacts on environmental supervision and monitoring, with staff and Department inside project’s PMO and of the safety, air, water environment, and noise clear operational procedures for rapid and effective Environmental and Social Unit inside the treatment of non-compliance. Construction Supervision Engineer organization Preparation of detailed environmental and social Environmental and Social field Inspectors provide SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 45 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS specifications for the contractors, to be part of the bidding routine monitoring of activity. documentation. Contractor environmental obligations are part of the contract documentation. Payment procedures for environmental activities of the contractor follow an incentive approach. Impacts from Sanlin – High risk of explosion from landfill gas Detecting methane content prior to excavation. No open Work load should be properly managed to allow for excavation of solid flame on site. Work under favourable weather condition to breaks for breathing fresh air. waste, conveyance, Loading /unloading of solid waste may have impact on air ensure health of construction workers. and back fill (landfill gas and dust) and surface water pollution from spillage. Ensure compliance with the limit levels of noise to minimize the nuisance. Construction of the quay may impact the surface watercourse A detailed construction program, including phasing, proposal for transport route and description of proposed Dust from waste excavation and conveyance may affect safety measures, will be required from the concerned surrounding vegetation and population. contractors prior to start the works. Gucun and Minhang – On site storage and mixing of Appropriate management of earthworks in accordance Most of technical measures described in the construction materials may produce large quantity of with the contractor environmental specifications. This will Chinese regulation “Temporary regulation on dust. include rules for piling, compacting and spraying spoil construction and environmental management of while waiting evacuation or reuse. Temporary storage of construction sites”. Transportation may affect environment along the route by earth piles will drain into sedimentation basin before overloading and bumping. discharge of run-off to the river. The construction agency should comply with the Shanghai Management Method for the flying dust Stock piles should be covered or sprayed with water pollution prevention. when it is windy. Dust pocket to be attached at the bottom outlet of the bulk cement tank to avoid dissipation Sanlin, Chenshan, Gucun and Minhang - Transport of Washing station for trucks leaving construction sites to Strengthen environmental awareness by training of material as earth fill, earth spoil, sand and gravel to or from limit mud transport in city roads, strict obligations constructers site may affect urban areas crossed by the trucks if regarding size of trucks, of load, necessary load cover, appropriate measures not implemented, resulting in serious routes and timing will be imposed to concerned impacts on road traffic, public safety, air quality and noise. contractor. Impact from Sanlin and Chenshan – Excavated waste may contain The EPB should be informed prior to disposal of the Emergency plan / Procedures for handling various hazardous wastes hazardous material. hazardous waste and adequate measures should be scenarios need to be developed and well taken before works continue. communicated to the constructors concerned. Impact from Sanlin, Chenshan, Gucun and Minhang - The The local sanitation bureau should ensure quick collection construction workers construction will involve numerous workers which will of the wastes and construction workers should be made produce sanitary wastes and domestic wastes which may aware of good practice for waste handling. cause sanitation issues. Impact of traffic Chenshan/Laogang - The route of the solid waste The Design institute must carry out a comparative transportation is in suburban area, so the impact is analysis to determine the route for which there is the less regarded as relatively low. impact. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 46 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS The road traffic at the site and in the surroundings may be aggravated by road diversion or lane narrowing. The fluvial traffic may be disrupted. Impacts on air quality Sanlin, Chenshan and Laogang - Impacts concern mainly For Chenshan,: Compliance monitoring to be performed by and noise the excavation, conveyance, loading/unloading, and z Pipe conveyance Contractors, with random controls of EPB. lading/discharging processes.. Fumes and exhaust gas z Ventilation at bottom from trucks and heavy machinery on construction sites may Width of sanitary protection zone should be z Gas induction pipe respected affect air quality, as well as dust from material transport by z Real-time detector for methane, ammonia, trucks and earthworks. sulfureted hydrogen, with alarming instrument Emission of foul gas will occur during loading/unloading. z Relocation and compensation of nearby inhabitants z PPE Specifications regarding operation and maintenance of construction equipment and transport of materials by truck. Sanlin, Chenshan, Gucun and Minghang - Noise from z Enforcement of existing noise standards related to Compliance monitoring to be performed by heavy machinery machinery and working period. Contractors, with random controls of EPB. z Forbidding the use of certain works during night- time. z No landfill operation during 22:00- 6:00 z Silencer to be installed on high noise equipment z Isolation wall to be installed on the side towards inhabitants Sanlin, Chenshan/Laogang - Traffic congestion resulting Adequate transportation timing (forbidden traffic from Use of internet site and poster campaigns to inform from transportation of waste to Chenshan/Laogang may 11.00PM to 6.00AM) and route should be selected to population on work schedule and location will help result in temporary higher levels of pollutants (TSP, NOx, minimize the impact from traffic. reducing traffic disruption or congestion. CO). Construction works should be carried out accordingly with the “Shanghai Dust Pollution Prevention and Control Policy and method” Impacts on water Sanlin and Chenshan - Impact of leachate that may z Before landfill, anti-infiltration effects should be Compliance monitoring to be performed by Co Strict quality discharge in the environment. investigated contractor environmental specifications regarding z Anti-infiltration measures to be taken to avoid the handling, storage or disposal of hazardous Collision of barges or influence of tornado may lead to contamination of groundwater products and of waste produced on the construction waste entering the water course and cause pollution z Safety education of lorry driver sites. z Separate the storm water and wastewater; Pollution hazard may also result from heavy operating waterproof clay to be adopted for earth backing Compliance monitoring of drainage water quality machinery, from storage of potential pollutants as petrol or from sites and enforcement of effluent standards. engine oils, from concrete production, from drainage of Drainage water should be intercepted into a settling tank before discharge into water course or drainage network. Management measures at work site oriented earth stock piles, from inappropriate disposal of used towards prevention of pollution or accidental spill. engine oils and locally generated waste (workshops, labor Intercept the leachate and connected into the sewerage camps). network. Monitoring of river quality upstream and downstream construction sites.ntractors, with random controls of EPB. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 47 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Gucun – Leachate is the main source of pollution. Long-term track monitoring of surface water bodies and Keep leachate (COD >24000mg/L) sewage ratio groundwater around the dumpsite to keep informed of the under 4%, and leachate (COD=3500mg/L) sewage High content of organics will considerably affect the water contamination condition and take relevant measures ratio under 40% to avoid sludge expansion quality due to the lack of horizontal penetration proof at the bottom. Leachate backfill may concentrate the pollutants and Separate the storm water and wastewater; cause serious pollution of groundwater and the surface waterproof clay to be adopted for earth water system. Therefore, it is recommended to collect the backing leachate and connected into the sewerage network. Due to high COD concentration of the leachate, pretreatment (biotreatment with oxidized pond plus A/O denitrogenation) is required prior to the connection to the sewerage network Minhang - Leachate is the main source of pollution. Long-term track monitoring of surface water bodies and groundwater around the dumpsite to keep informed of the High content of organics will considerably affect the water contamination condition and take relevant measures quality and since the dumpsite is close to several water courses, there is a high risk of pollution. Considering the closeness with several watercourses, it is not enough with simply vertical penetration proof and separate drainage system. Therefore, it is recommended to collect the leachate and connect into the sewerage network., or send to WWTP for treatment. Bio-treatment is required before the leachate can enter the municipal sewerage system leading to WWTP, due to high COD concentration of the leachate. Impact on farming Sanlin - Wind and driving of vehicles in the dumps blow a Minimize disturbance of the structure of the ground during activities great amount of dust and light and thin litters like plastics construction. outside of the dumps. Crops are impacted as farmland around the dump is polluted by these flying litters. Re-instatement of the farmland to its original condition and ensure farming productivity Minhang and Gucun - Uncontrolled drainage water from Construction contractor should have a good knowledge of construction may disperse into farmland and impact the soil topography and drainage system. fertility. Traveling purse net need to be installed to block off the Crops are impacted as farmland around the dump is flying dust and floating litters. polluted by these flying litters SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 48 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIELD POSSIBLE IMPACTS PROPOSED MITIGATION MEASURES COMMENTS Impacts on public Sanlin, Chenshan, Gucun and Minhang - If Awareness training of all workers on environmental and ESD/ESU assist in training workers on health inappropriately managed, workforce may create relational social issues. environmental basics and justification of mitigation problems with surrounding residents. measures. Strict obligations imposed to the contractor for the If inappropriately managed, labor camps may become the organization and the management of labor force and Contractor requested to have recruitment medical site of epidemic burst out among workers and spread to camps. check for each worker, and medical visit once a surrounding population. Contractor to prepare a CSEMP for approval. Monitoring year. Availability of medicine in case of epidemic of labor camps and of worker health conditions by the will be requested at workers camps (dormitory or If inappropriately managed, the local residents will suffer ESU and Department of Public Health. canteens). from various diseases. Impacts on on-site Sanlin, Chenshan/Laogang , Gucun and Minhang Contractor to prepare a CSEMP for approval. In this plan, Monitoring of construction sites by ESU. public safety Occupational health and accident issues, resulting in contractor will clearly define the safety procedures in case serious wounds or death of workers. of accident on site, ensure that minimum first aid equipment is available on all sites and ensure availability and enforcement to wear PPE (personal protective equipment). Chenshan/Laogang -River transportation will have Correctly designed and tested temporary works structures impacts on life of workforce on board. and operational procedures. On site checks on frequent basis. Chenshan - Access to deep open pit with danger to public Open pit to be severely fenced, especially after working safety hours. Security guard employed to monitor safety issues. Warning sign of falling risk to be posted. Impacts on off-site Increased traffic of trucks on some road sections may Strict clauses imposed to the contractor for the Monitoring by ESFIs. public safety increase risk of traffic accident. implementation of acceptable standards for the safety of residents surrounding construction sites: fencing, For river transportation, increase risk of traffic accident. information to concerned residents, access to roads and buildings, procedure if road accident. Detailed specifications on traffic regulation inside and outside the construction area to be prepared. Impact on public Sanlin, Chenshan/Laogang , Gucun and Minhang - No No mitigation required underground services impact is anticipated on construction sites. Impacts on loss of Sanlin, Chenshan/Laogang , Gucun and Minhang - No No mitigation required As project component, landscaping has been green areas impact is anticipated on construction sites. included in Minhang, Gucun closure. Impacts on cultural Sanlin, Chenshan/Laogang , Gucun and Minhang - No Specific procedures if underground artifacts are identified heritage impact is anticipated on construction sites. Possible during excavation works in coordination with ESU. presence of archaeological or historical artifacts under the future excavations. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 49 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 5. ENVIRONMENTAL MANAGEMENT PLAN 5.1. OBJECTIVES OF EMP The role of the EMP is to outline the mitigation, monitoring and institutional measures to be considered during project implementation and operation to avoid or control adverse environmental impacts, and the actions deemed necessary to implement these measures. The EMP provides the crucial link between impacts and alternative mitigation measures evaluated and described in the EA reports and the way these measures are implemented to achieve their mitigation objectives. For each proposed measure, the EMP defines the technical content, the estimated cost, the schedule of implementation, the role and responsibilities of Government Agencies, the source of funding and the way to monitor the results. 5.2. CONTRACTUAL DISPOSITIONS To secure an efficient implementation of the environmental and social mitigation measures, these measures must be presented in the main contractual documentation which includes 1) The Memorandum of Contract Negotiation and 2) the Technical Specifications, through a clear reference to the EA and EMP and should be detailed in the Technical Specifications. Thus, the preparation of detailed environmental and social specifications for the Contractor will be a first mitigation measure proposed prior to the bidding process, with the objective to have eventually a contractual document which establishes clearly the obligations of the contractor, the quantities of work involved and the related cost of measures. 5.2.1. OBLIGATIONS OF THE CONTRACTOR It is proposed to develop detailed environmental and social specifications for the Contractor, which can be in the future easily adapted to the specific context of each considered project. These specifications will be organized into 4 sections: • Section A : Environmental Protection Management • Section B : Labor Camps and Occupational Health Management • Section C : Safety Management • Section D : Social Management Each section will address 2 aspects: 1) Sub-Section 1 : description of the Contractor's obligations with regards to those aspects covered by the section; and 2) Sub-Section 2: description of performance indicators that will be monitored for deciding payment of the services. Section A will specify the Contractor obligations regarding the preparation of a Construction Site Environmental Management Program (CSEMP) aiming at protecting the work sites and their surroundings against potentially adverse impacts. The Contractor's CSEMP will include the facilities and procedures for the management of camps and construction wastes, the soil conservation measures and proposed rehabilitation works once the construction ends, the measures aiming at protecting cultural and ecological assets if any, the preventive measures against water pollution and the monitoring program (air, water). Section B will address the minimum standards to be implemented in the labour camps and facilities regarding issues as workers accommodation, food supply and canteen, waste management, water supply, treatment of sewage and sanitary conditions on site. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 50 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT Section C will address safety issues, and the related Environmental Specifications will cover two distinct aspects, i) On-site Safety, Personal Protection Equipment (PPE), and Medical issues, and ii) Off site Safety issues. On-site Safety, PPE, and medical aspects address all the measures the Contractor needs to implement to ensure a safety standard equivalent to international practice, and to provide appropriate medical emergency procedures for the workforce. Off-site Safety concerns all issues to be dealt with outside construction sites proper. It covers traffic hazards resulting from the transport of equipment to or from the construction sites, and focuses mainly on the trunk sewer component which will involve construction activities along about 1000km in populated and high traffic density areas. For Off-site issues, the Environmental Specifications will define objectives. The Contractor will detail in its proposal the plan he intends to implement to achieve these objectives. Section D will define the framework conditions for the Contractor to manage social issues related to construction activities. Most of these conditions will focus on how to reduce nuisance to residents, mainly anticipated from noise, from the temporary road closures and the cut-off of electricity, gas, water or telephone services when laying the trunk sewer network. The contractors will be requested to prepare a Nuisance Control Plan (NCP) which will be discussed with Project authorities and other Municipal Agencies concerned and with affected residents during information and consultation meetings. Issues to be discussed will focus on the procedures to be applied by the contractor prior to close a road or to cut-off water, gas or any other service, and on the general nuisance as access to buildings and shops, noise and air pollution. 5.3. ORGANIZATION FOR EMP IMPLEMENTATION The SHUEP implementation will be managed by a Project Management Office (PMO) under the Shanghai Municipal Government. Under this PMO, five Project Implementation Units (PIU) will be created, one for the waste water component, one for the water supply component and one for the solid waste component. The PMO will be assisted by an independent Construction Supervision Engineer (CSE) during the construction stage of the facilities. It is proposed to strengthen environmental and social management during the implementation of the EMP at both PMO and CSE levels. There To ensure that applicable national, provincial and municipal environmental laws, regulations and standards, as well as WB environmental and social requirements are respected during Project preparation and implementation, an Environmental and Social Division (ESD) will be established within the PMO. During construction stage, the ESD will have the responsibility to coordinate monitoring activities with the contractors and concerned government agencies, to ensure the effective implementation of the mitigation measures decided in the EMP. The ESD will be composed of 2 specialists, one Head of the Department (Environmental Specialist) and one Resettlement Coordinator. These two specialists will be assisted by a full time secretary. It is assumed that accountancy needs of the ESD will be satisfied on a part time basis by the accountancy staff of the PMO. At field level, the ESD will rely on the Construction Supervision Engineer, through an Environmental and Social Unit (ESU) including a Construction Supervision Environmental Adviser (CSEA) assisted by Environmental and Social Field Inspectors (ESFI). It is proposed to appoint 1 ESFI to each component (waste water, water and solid waste). The proposed general organization for Environmental and Social management of the project is presented in the following Figure. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 51 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIGURE 6: PROPOSED ORGANIZATION FOR THE IMPLEMENTATION OF EMP FOR APL2 Environmental EMP Supervision Design & construction period agencies Shanghai Municipal Government SEPA SCEAM PMO (DFV) Env. Management Division (EMD) Env. Management Division 2 Environment Specialists (EMD) 2 Environment Specialists Shanghai Municipal EPB Shanghai South Minhang Water Water Supply Supply Company SMSC SCAESAB DFV PIUs Company PIU PIU PIU District Level EPB PIU & Monitoring Centres Compliance Monitoring Construction Supervision Eng. Environmental Supervision Unit (ESU) 1 TA Environment Specialist 1 Construction Supervision Environmental Adviser (CSEA) 4 Env. Field Inspectors (EFI) Contractor(s) for Contractor(s) for Contractor(s) for Contractor(s) for Contractor(s) for SSWPC MWSC SMSC SCAESAB DFV SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 52 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 5.3.1. ENVIRONMENTAL MANAGEMENT PROCEDURES The management of the environmental and social monitoring effort will involve open communications between the field personnel of the CSE, the ESD and the PMO. An important element of the communication process will be the organized transfer of information concerning situations that do not comply with the project environmental requirements, specifications, goals or objectives. These situations are identified on site by the CSEA and his ESFI staff, and then reported when appropriate at higher level for decision. To help focus senior management attention on the most important issues, non-compliance observations will be separated into 3 levels on the basis of importance, and communications requirements for the observations will be commensurate with the severity of the non-compliance situation. The proposed non-compliance detection, reporting and resolution flow-chart is presented in the following Figure. 5.4. COST ESTIMATE FOR EMP The implementation of the EMP measures relies on the intervention of several parties involving funding from different budget lines or sources. Most of the activities involve routine measurements, field sampling or testing are to be provided by the contractor, and will be included in his tendered cost. These costs will be presented in his tender in accordance with the requirements and specifications of the bidding documentation. However, the rather limited budgets involved in environmental activities are probably not sufficient to raise a strong interest from the Contractor. Until environmental protection practices become a fully integrated part of construction contracts, penalties are the most efficient way to expedite the process. For that reason, it is considered to establish a contractor obligations budget to a fixed percentage of the construction costs, say 4%. This amount will be split into 2% direct fees to be paid to the contractor in accordance with the progress of the work, and 2% as a retainer, to be paid in accordance with the actual goodwill demonstrated by the Contractor in the implementation of environmental and social measures and for efficient and quick correction of non-compliance. Operational costs for the ESD will be included in the global Project Management Cost related to the PMO and the PIUs. Office and field equipment as well as transportation facilities costs will also be included in the same budget. Monitoring activity by ESFI and CSEA staff is part of the Construction Management and Supervision Cost of the Project. Training requirements involving foreign consultancy will be included in the Technical Assistance budget for the project. Provision will also be allocated to ESD for the appointment of domestic or foreign specialists on an ad hoc basis, if circumstances during the construction stage require such high level expertise. These will also be charged to the Technical Assistance budget for the project. The budget estimate are provided in the EMP report. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 53 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT FIGURE 7: COMMUNICATION, REPORTING-DOCUMENTATION AND PROBLEM RESOLUTION FLOW CHART SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 54 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 6. PUBLIC CONSULTATION & INFORMATION DISCLOSURE According to China environmental protection laws and regulations, management rules and World Bank environmental assessment policy (OP4.01), public participation work was carried out during Environmental Assessment to involve the people directly or indirectly related to this project. TABLE 8: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 WATER SUPPLY COMPONENTS WORLD BANK ACTIVITY BY WHOM WITH WHOM WHEN WHERE REQUIREMENTS th Public Shanghai Government 9 , Shanghai OD 4.30 and OP consultation Academy of officials, November. City and 4.01 (Questionnaires) Environmental Business dealers, 2004 Changqiao Science Factory workers, distriuct Educational staffers, Others Internet survey Shanghai Public visitors to Nov. to www.envir.online.sh.cn (Questionnaires) Academy of internet Dec. Environmental 2004 Science th Public Meeting Shanghai Changqiao New 9 , Shanghai Academy of Village Committee, November. City, Environmental Pingfu Village 2004 Changqiao Science Committee, New village, Gangkou Village Pingfu Committee, village, Gangkou village th Public Meeting Shanghai Changqiao New 16 , Shanghai Academy of Village Committee, December. City, Environmental Pingfu Village 2004 Changqiao Science Committee, New village, Gangkou Village Pingfu Committee, village, Gangkou village WORLD BANK ACTIVITY BY WHOM WITH WHOM WHEN WHERE REQUIREMENTS th The first round of Shanghai Government 29 , Shanghai OD 4.30 and OP public consultation Academy of officials, November. City , 4.01 (questionnaires) Environmental Business dealers, 2004 Minhang Science Factory workers, distriuct Educational staffers, Others Information Shanghai Internet visitors November. www.envir.gov.cn disclosure Academy of 2004 Environmental Science rd The second round Shanghai Government 23 , Shanghai OD 4.30 and OP of public Academy of officials, December. City , 4.01 consultation Environmental Business dealers, 2004 Minhang (questionnaires) Science Factory workers, distriuct Educational staffers, Others SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 55 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 9: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 WASTE WATER COMPONENTS WORLD BANK ACTIVITY BY WHOM WITH WHOM WHEN WHERE REQUIREMENTS th Public consultation Shanghai Enterprises and Nov.10 , OD 4.30 and OP (Draft Academy of residents in the 2004 4.01 questionnaires) Environmental affected area Science th Information Shanghai Nov.10 , http://www.envir.gov.cn OP4.01 Disclosure (EA Academy of 2004 Draft Report) Environmental Science Public consultation Shanghai Residents in Dec. OD 4.30 and OP th (Revised Academy of the affected 28 ,2004 4.01 questionnaires) Environmental area and Science administrative staff in Duanjing Village Committee Public Meeting Shanghai Academy of Environmental Science Information Shanghai OP4.01 Disclosure (EA Academy of Revised Report) Environmental Science Public Meeting Shanghai Academy of Environmental Science WORLD BANK ACTIVITY BY WHOM WITH WHOM WHEN WHERE REQUIREMENTS st th 1 public Shanghai Residents of Nov. 11 , Chaoyang Village OD 4.30 and OP consultation Academy of Chaoyang 2004 4.01 Environmental Village Science Information Shanghai All the citizens Nov. rd th http://www.envir.gov.cn OP4.01 Disclosure Academy of showing 3 ~Dec. 15 , Environmental interest 2004 Science Investigation and Shanghai Environmental Nov. 15th, Shanghai Academy of OD 4.30 and OP interview with Academy of specialists and 2004 Environmental Science 4.01 specialists Environmental administrative Science staffs nd rd 2 public Shanghai Residents of Dec. 23 , Chaoyang Village OD 4.30 and OP consultation Academy of Chaoyang 2004 4.01 Environmental Village Science SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 56 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT TABLE 10: SUMMARY OF PUBLIC COINSULTATION & INFORMATION DISCLOSURE DOR APL2 SOLID WASTE COMPONENTS WORLD BANK ACTIVITY BY WHOM WITH WHOM WHEN WHERE REQUIREMENTS Public consultation Shanghai Academy Residents and Nov. 29, Laodong OD 4.30 and OP (Draft questionnaires) of Environmental business staff in 2004 Village, Sanlin 4.01 Science Laodong Village, Town Sanlin Town Residents in Sheshan Nov. 28, Sheshan Town Town and Chenshan 2004 and Chenshan village village Interviews with BoHong EPB, Sanlin Dumpsite, September Sanlin specialists Design Institute, etc. 2004 Dumpsite and (RAP/Social Impact Chenshan Assessment) Landfill site Information Disclosure Shanghai Academy Public Nov. 19, Website OP4.01 (EA Draft Report) of Environmental 2004 Science Public consultation Shanghai Academy Residents and Dec. 23, Laodong OD 4.30 and OP (Revised of Environmental business staff in 2004 Village, Sanlin 4.01 questionnaires) Science Laodong Village, Town Sanlin Town Residents in Sheshan Dec. 23, Sheshan Town Town and Chenshan 2004 and Chenshan village village Public Meeting BoHong Sanlin, Chenshan September residents 2004 Information Disclosure Shanghai Academy Public Dec.. 29, Website OP4.01 of Environmental 2004 Science Information Disclosure Shanghai Academy Jan. 2005 OP4.01 (EA Final Report) of Environmental Science Interviews with BoHong EPB, RAP experts Nov. 2004 SCAESB, specialists Solid Waste (RAP/Social Impact Disposal Assessment) Administration Co. Information Disclosure BoHong Public November SCAESB OP4.01 (Social Impact 2004 Assessment/RAP) Activity By whom With whom When Where World Bank requirements Public consultation Shanghai Academy Residents of Xingxing Nov. 28, Xingxing OD 4.30 and OP (1st round of Environmental Village, Gucun Town 2004 Village 4.01 questionnaires) Science Public Meeting Shanghai Academy Residents of Xingxing Nov. 28, Xingxing of Environmental Village, Gucun Town 2004 Village Science Information Disclosure Shanghai Academy Public Nov. 19, Website OP4.01 of Environmental 2004 Science Public consultation Shanghai Academy Residents of Xingxing Dec. 24, Xingxing OD 4.30 and OP (2nd round of Environmental Village, Gucun Town 2004 Village 4.01 questionnaires) Science Public Meetings Shanghai Academy Residents of Xingxing Dec. 24, Xingxing of Environmental Village, Gucun Town 2004 Village Science Information Disclosure Shanghai Academy Public Dec. 29, Website OP4.01 of Environmental 2004 Science Information Disclosure Shanghai Academy Consultants, Design Jan. 2005 OP4.01 (EA Final Report) of Environmental Institute, Public Science domain, Local authorities concerned Activity By whom With whom When Where World Bank SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 57 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT requirements Public consultation Shanghai Academy Residents of Zhujiajing Nov. 28, Zhujiajing OD 4.30 and OP (1st round of Environmental village, Minhang 2004 village, 4.01 questionnaires) Science district Minhang district Residents of Xiulong Nov. 28, Xiulong village, village, Qingpu district 2004 Qingpu district Public Meeting Shanghai Academy Residents of Zhujiajing Nov. 28, Zhujiajing of Environmental village, Minhang 2004 village, Science district Minhang district Residents of Xiulong Nov. 28, Xiulong village, village, Qingpu district 2004 Qingpu district Information Disclosure Shanghai Academy Public Nov. 19, Website OP4.01 of Environmental 2004 Science Public consultation Shanghai Academy Residents of Zhujiajing Dec. 24, Zhujiajing OD 4.30 and OP (2nd round of Environmental village, Minhang 2004 village, 4.01 questionnaires) Science district Minhang district Residents of Xiulong Dec. 24,, Xiulong village, village, Qingpu district 2004 Qingpu district Public Meeting Shanghai Academy Residents of Zhujiajing Dec. 24, Zhujiajing of Environmental village, Minhang 2004 village, Science district Minhang district Residents of Xiulong Dec. 24, Xiulong village, village, Qingpu district 2004 Qingpu district Information Disclosure Shanghai Academy Public Dec. 29, Website OP4.01 of Environmental 2004 Science Information Disclosure Shanghai Academy Jan. 2005 OP4.01 (EA Final Report) of Environmental Science SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 58 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT 7. FINDINGS AND CONCLUSIONS The environmental assessment for SHUEP APL2 has drawn the following conclusions: • As previously concluded from the APL1, the SHUEP is well integrated with Shanghai’s Master Plan which has been approved by the State Council and will contribute significantly to the strategic objectives for the city’s development and environmental protection. Since approval of the SHUEP, the importance of environmental protection as part of Shanghai’s overall development has been enhanced by the adoption of the “Better City, Better Life” strategy associated with the award to Shanghai of the 2010 Universal Exposition. • SHUEP Phase 2 has demonstrated the adaptability of the program by re-aligning the sectors included within the SHUEP with respect to the priorities of SMG. Thus, the water supply management components have been brought into the SHUEP in line with Shanghai’s goal to supply tap water fit to drink by 2010. The closure of the Sanlin Tan dump site within the city centre area and close to the Expo site will enhance the green areas in Shanghai and will utilise further the new sanitary landfill created at Laogang as part of the APL1. • The introduction of sludge treatment facilities at both Bailongang and Zhuyuan will largely complete the World Bank supported investment in Shanghai’s centralised wastewater treatment system initiated over 20 years ago with the Shanghai Sewerage Project, Phase 1. The treatment and disposal of sludge will be implemented over two phases: Phase 1 will involve digestion of all sludge and thermal treatment of a fraction with associated disposal to both landfill and land application; depending on the results of Phase1, Phase 2 will introduce progressively more thermal treatment and associated land apllication, thereby leading to a fully least-cost and sustainable solution for Shanghai. • The inovative aspects of SHUEP have been deepened with the development of a “Financing Vehicle” for assisting the provision of environmental infrastructure in the suburban districts, the DFV. The DFV has set up a full set of operational procedures and methods for developing, appraising and implementing the environmental assessments and environmental manaegement plans associated with the DFV components. The relevance of this initiative is emphasized by the increased environmental stresses that will arise in the suburban districts associated with the increased pace of urbanisation and development within these areas. • The project’s objective is to improve the water supply, the waste water management and the solid waste management in Shanghai in order to increase the quality of life of the urban residents and to comply with national and Shanghai environmental plans. The eventual environmental impacts of such projects are obviously beneficial. However, some impacts with detrimental effects may result from projects implementation, mainly during its construction, with significant land acquisition and resettlement issues, as well as local impacts directly involved by construction activities. • To further ensure environmental protection and proper implementation of mitigation measures, a stand-alone environmental management plan has been developed involving government and professional institutions for supervision, monitoring, and management of environmental affairs of the SHUEP APL2. SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 59 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT APPENDIX A BIBLIOGRAPHY SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 60 JANUARY 2005 SHANGHAI MUNICIPAL GOVERNMENT- THE WORLD BANK SHANGHAI URBAN ENVIRONMENT PROJECT, DESIGN REVIEW AND ADVISORY SERVICES ENVIRONMENTAL ASSESSMENT SUMMARY REPORT APPENDIX B APL2 COMPONENTS PHOTOGRAPHIC PLATES SOGREAH –GDM– 655055.R3.1 – DRAFT PAGE 61 JANUARY 2005

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Chine
Source Banque mondiale