Page 1 E1114 V. 4 Annex 2 Environmental Report/IAIL3 E NVIRONMENT R EPORT (S HANDONG P ROVINCE ) China Research Academy of Environmental Sciences Page 2 January 2005 Page 3 T ABLE OF C ONTENTS 1. I NTRODUCTION ............................................................................................................1 1.1. Purpose and Contents of Report ...............................................................................1 1.2. Background ...................................................................................................................1 2. O VERALL A SSESSMENT OF E NVIRONMENTAL I MPACTS OF IAIL2 P ROJECT ............2 2.1. Environmental Issues of IAIL2 Project ..................................................................2 2.2. Assessment of Actual Environmental Impacts of IAIL2 Project ......................3 2.3. Summary Conclusions of IAIL2 Environmental Impacts Assessment ............9 2.4. Recommendations for Improvement of IAIL3 Environmental Management .9 3. C OMPARISON OF E NVIRONMENTAL C ONDITIONS AND E NVIRONMENTAL I MPACTS B ETWEEN IAIL3 AND IAIL2............................................................................................10 3.1. Comparison of Project Counties (Cities) ..............................................................10 3.2. Comparison of Environmental Conditions ...........................................................12 3.3. Comparison of Project Contents ............................................................................15 3.4. Main Conclusions ......................................................................................................17 4. C LARIFICATION ON P REPARATION OF IAIL3 E NVIRONMENTAL M ANAGEMENT P LAN ..................................................................................................................................18 Page 4 1 1. Introduction 1.1. Purpose and Contents of Report This Environment Report (the Report) for Shandong Province is prepared for the appraisal of the proposed World Bank loan-financed Irrigated Agriculture Intensification Project III (IAIL3, the Project). The World Bank preparation mission of November 2004 proposed that the environment category of the Project remains to be type B due to the similarities between the Project and Irrigated Agriculture Intensification Project II (IAIL2) in terms of project areas and basic contents. In order to simplify procedures the Bank no longer requires to review a full environmental assessment report for the Project, but requires to 1) assess the actual environmental impacts of the IAIL2 Project; 2) compare the environmental conditions of IAIL3 and IAIL2; and 3) prepare environmental management plan by Project provinces. In compliance with the above requirements the main contents of the Report include: 1) Overview of the actual environmental impact assessment of the IAIL2 Project Shandong Component; 2) Comparison of environmental conditions and contents between IAIL3 and IAIL2 in Shandong; 3) Clarification on the preparation of Environmental Management Plan for IAIL3 in Shandong; 4) Shandong Project Area Environmental Management Plan (attached to the Report). 1.2. Background Since 1998 the IAIL2 Project had been implemented in 25 cities and counties of Shandong
World Bank Group · Environmental Assessment
China - Third Integrated Agriculture Intensification Loan Project : environmental assessment (Vol. 4 of 8) : Environment report - Shandong Province
View original document
The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.
Full text
Key facts
Organisation
World Bank Group
Document type
Environmental Assessment
Country
China
Source
World Bank