World Bank Group · Resettlement Plan

China - Third National Railways Project : resettlement plan (Vol. 1 of 2) : Resettlement action plan : Zhanyi - Liupanshui railway additional second line

China World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

RP367 Volume 1 GOVERNMENT OF THE PEOPLE'S REPUBLIC OF CHINA MINISTRY OF RAILWAYS AND WORLD BANK ZHANYI-LIUPANSHUI RAILWAY ADDITIONAL SECOND LINE PROJECT PRESEITLEMENT ACTION PLAN Prepared by: Foreign Capital Center of Ministry of Railways, P. R. China(FCC) The Second Survey & Design Institute of China Railways (SSDI) AUGUST 2005 ,;p ! / GOVERNMENT OF THE PEOPLE'S REPUBLIC OF CHINA MINISTRY OF RAILWAYS AND WORLD BANK ZHANYI-LIUPANSHUI RAILWAY ADDITIONAL SECOND LINE PROJECT RESETTLEMENT ACTION PLAN Prepared by: Foreign Capital Center of Ministry of Railways, P. R. China(FCC) & The Second Survey & Design Institute of China Railways (SSDI) AUGUST 2005 I I iI i I i I I I i i I i i i II i I RAP under Additional Second Line Project of LZR TABLE OF CONTENTS PROJECT INTRODUCTION ................................................................7 1.1 PROJECT BACKGROUND ............................................................7 1.1. 1 Project Current Status ...........7.................................................7 1.1.2 Necessity of Construction ofLZ ................LZR.7.......................................... 7 1.2 PROJECT RESEARCH AND DESIGN ........................................................... 8 1.3 PROJECT INTRODUCTION ..........................................................9 1.4 PROJECT INPACT .......................................................... . 10 1.5 MEASURES TO LESSEN PROJECT IMPACT .......................................................... 11 1.5.1 Dur-in7g Project Plau and Design Period .......................................................... 11 1.5.2 C onsstrcution Period ........................................................... 11 1.5.3 Planning andCI lun7plen2ention of RAP ............................................12.............. 1 1.6 SCHEDULING ........................................................... 12 1.7 PREPARATION FOR RESETTLEMENT AND MONITERING & EVALUATION . .13............................ 13 1. 7.1 h7ivestigation and collection ofphy'sical indicators .......................................................... 13 1. 7.2 Socioecononic Survey ................ 13 1. 7.3 Resettlement Programininig .13 1. 7.4 Preparation for resettlement and Monitoring & evaluation .14 1.8 BASIS AND OBJECTIVES OF RAP ..14 1.8.1 Basis.14 1.8.2 Policy Objeectiees.15 !2 NATURAL AND SOCIOECONOMIC BACKGROUND OF PROJECT IMPACT AREA . 16 2.1 NATURAL AND SOCIOECONOMIC BACKGROUND OF LIUPANSHUI CITY OF GUIZHOU PROVINCE . 1 6 2.2 NATUTAL AND SOCIOECONOMIC SITUATIONS OF QUJING CITY OF YUNNAN PROVIjNCE.1 9 3 PROJECT IMPACT.R23 3.1 SURVEY ON PROJEC T IMIPACT..23 3.2 AFFECT ED PHYSICAL INDICATORS BY T HE PROJECT ..24 3.2.1 Lanld acquisition7 an1d occupation..2 5 |~3.2 1 .1 Permanent acquisition of land by the Project...2. 5 ! 3.2.1.2 Land for tc:mporary use..77 13.2.2 HPouses and a..iliar. facilities to be demolished ..2 |3.2.3 Affecteddpopulation.33 3.2'.4 En1ter prises, Institutional Unvits anad Pr ivate Busness ..es s ..33 3.27.5 Scattered trees and tooms..34 3.2'.6 AJfected prodluction1 andl liv ing facilities..34 3.3 ANALYSIS ON SOCIOECONOMIC IMPACT BY THE PROIECT. 35 3.3.1 BackugroANd of affected C illages and t OF oCns. ............ 35 3. 3.2 Affected Mlinorities..38 3.3. 3 Imnpact of close-dowtn of railwtaj stations along the line..42 3.3.3.1 Scope of close-down of railway stations.42 3.3.3.2 Analysis on necessities of closing stations.43 3.3 .3 .3 U tilization of facilities of closed stations and resettlement of staff.47 3.3.3.4 Substitutio n measurements for outgoings of residents nearby the closed stations along the line.49j 4 FRAMEO W ORK OF RE SETTLEMENT 50 4. 1 POLICY BASIS..50 4.2 S TIPULATIONS IN RELATED LAWS .51 4.2.1 Related Stipulations in The Land Administration La. of the People s Republic of China . 51 4.2.2 Main stipulationd s in Measures for Demol ..ition. an1d Relocation. of Ur.ban . Buildin.gs of Liupa.sh..ui City (Documents of Peoplea s Governmltent of Liupanshedi City). SFF f.00 }/#. . 55 4.2.3 Related stipulations in iorld Bank OP4. 12 56 4.3 C OMPENSATION STANDARD. .............................. 58 4.3.1 C ompensation standardfor rural migrants ...................... 58 4.3.2 Comtlpensation standardscfol relocations and cosetluction of goversnm..en.t unr.its, en.terpises an.d in.stitution 65 4 RA E WO K F RE E TL M E T ...........................................................I RAP under Additional Second Line Project of LZR 5 RESETTLEMENT AND RESTORATION PLAN ................................................. 67 5.1 OBJECTIVES AND TASKS .................................................. 67 5.1.1 Resettlement Objectives ................................................. 67 5.1.2 Resettlement tasks ..6................................................ 67 5.2 RESETTLEMENT GUIDELINE AND PRINCIPLES ........ .......................................... 68 5.2.1 Guideline ................................................. 68 5.2.2 Resettlement planni77g prilnciples ................................................ 68 5.3 GENERAL PLAN FOR RESETTLEMENT ....... . ......................................... 68 5.4 ANALYSIS ON RESETTLEMENT ENVIRONMENT CAPACITY......... ,,.. .....,,,,, .............,,,,,.,,.,.69 5.4.1 Ntatural conditions ard lanid resour-ces .. 69 5.4.2 iMigrant's chaaracter-istics and social relations .. , , . ........... , 70 5.4.3 Pr-oduction and living inifrastructure conditio77s .. 70 5.5 RESETTLEMENT PLAN ......................................... .............................. 7 1 5.5.1 Production resettlement ........................................... ........ 71 5.5.1.1 Affected rural residents ......... 71 5.5.1.2 Affected enterprises and institutional units.............................3...................... ..... ................. ...... 73 5.5.1.3 Affected infrastructures ... 73 5.5.2 Migrants relocation plan ...................,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ............ 73 5.5.2.1 Selection of lhomestead and standard ....................................................................................................... 73 5.5.2.2 Site leveling and infrastructure planning ..............................................74 ................................................ 74 5.5.2.3 Construction of houses for the migrants .................... 75 5.5.3 Configuration of social service establishmuent in the resettlement area ........ ......... 75 5.5. 4 Management of community................. . 75 5.5.5 Organization and nanagement on resettlement implementaticn .................................................... 75 5.6 SPECIFIC FACILITIES RELOCATION AND REBUILD PLANNING . . . . . 76 6 COMPENSATION INVESTMENT FOR LAND ACQUISITION AND RELOCATITON 77 6.1 FORMULATION BASIS AND PRINCII'LES .................................................................................................. 80 6.2 COMPENSATION ...................................................... ...................................... 81 6.2.1 Comnpensation for r Ur/ al migrants ............................................. ............................1........................ 81 6 .2 7 2 O tl 7e r f e e s ........... ... ............................. ............... ............. ...... .......... .... ...................... ....... .... . . . 8 2 . 6.3 IMPLEMENTATION PROCEDLJRE OF RAP ..82 6.4 PLANNED SCI-IEDULE..851 6.5 FUND APPROPRIATION .............................................. . . 87 6.5.1 Appropriation prin8ciples.87 6.5.2 Organization responsible for migrants finance.. ........................................................................... 87 6.5.3 Fundflow .........8.... .......... ............ .... ....................... 88 7 ORGANIZATION .. 91 7.1 ORGANIZATION SE.TT.ING . 91 7 1. 1 E stablished organizations .......................9...............................................................1............ 9 1 7.1.2 Organizations and Duties ...............................................9...............3.... ................ ........... .. 93 7.1.3 Staffing ........................7..................... .... . 97 7.2 ORGANIZATIONAL LINK-UP ..98 . 7.3 MEASURES TO ENHANCE CAPABILITIES OF ORGANIZATIONS .................................................. 99 8 PUBLIC PARTICIPATION AND APPEALS .................................................. 100 8.1 PUBLIC PARTICIPATION .......0............................................. 1 8.1.1 Public participation during preparatory period ................................................ 100 8.1.2.8...2.P..blic.participation on p..ep81.2 8.1.2 Public participation on preparation of RAP ........1..0................. . 100 8.1.3 Public participation in implemi7en?tation of RAP . ......... 104 8.2 APPEALING MECHANISM AND CHANNELS.. 106 9 MONITORING AND EVALUATION............................................ 108 9.1 INSIDE MONITORING.108 9.1.1 O bjectives and tasks ....................10...... ..............8...... ................................ ....... .. 108 9.1.2 Organizations and staff ineinbers ........1.................................................... ....... 108 9.1.3 Mon7itor ing contents ......................................................................... ..................... 108 9.1.4 Implementation procedure ............................................................... .......................... 109 2 RAP under Additional Second Line Project of LZR 9.2 OUTSIDE INDEPENDENT MONITORING AND EVALUJATION ............. .................. . ............. 109 92.1 Objectives and tasks .109 9.2. 2 Background of organization and staff members ..................................1................1......... ....... .. 110 9.2.3 Mlain monitoring and evaluation indicators ...................I..................i............ ..................... ........ .I 9.2.4 Monitoring and evaluation metlhod ......................... .. .. ... .. ill 9.2.5 W7orking Flow ...... . . . . . . . 113 1 0 DRTAWING-UP PLAN.1 15 10.1 RESETTLEMENT ACTION PLAN . 115 10.2 RESETTLEMENT PROGRESS REPORT .115 1 0.3 INDEPENDENT MONITORING AND EVALUATION REPORT ON RESETTLEMENT . 117 10.4 TABIE LISTING MIGRANT'S RIGHTS AND INTERESTS . 17 11 ANNEX ............................................................................... 123 11.1 BACKGROUND OF PART OF AFFECTED SCHOOLS AND HOSPITAS . ...................................................... 12 3 11.2 PROJECT ON-SITE QUESTIONNAIRES . ............................................................................... 14 11.3 POLICIES ON LAND ACQUISITION, DEMOLITION AND RELOCATION OF LOCAL GOVERNMENTS ALONG RAIL'WAY LINE ................................................................................. 141 11.4 SOCIOECONOMIC APPRAISAL REPORT ON LZR PROJECT ......................................................................... 154 11.5 MINISTRY-PROVINCE AGREEMENT BETWEEN MOR AND YUNNAN / GUIZHOU PROVINCE . . 172 3 RAP under Additional Second Line Project of LZR CURRENCY EQUIVALENTS (July 2005) currency Unit - Yuan $1.00 = RMB 8.28 yuan ABBREVIATIONS AP Affected Peoples CH Railway Construction Headquarte FCI Foreign Capital Institute of SU'JU GDP Gross Domestic Product LZR Liu-Zhan Railway MOR Ministry of Railways PDS Planning & Development Section of MOR RAP Resettlement ActionPlan SSDI Second Survey & Design Institute of China Railway SWJU Southwest Jiaotong University WB World Bank WEIGHTS AND MEASURES ha hectare kg kilogram km kilometer km2 square kilometer m meter m2 square meter mu mu (665 square meters) 4 RAP under Additional Second Line Project of LZR Objective of the Resettlement Action Plan and the Definitions of Resettlement Terms Object i ve * 1. This Resettlement Action Plan (RAP) is based on related laws and regulations of Guizhou Province and Yunnan Province and in consistent with the World Bank's Policy on Social Security OP4.12/BP4.12--Involuntary Resettlement. 2. The primary objective of this RAP is to provide affected peoples(APs) with a resettlement and restoration plan by which they can benefit from the project by improving their living standards or at least can regain their original living standard after the completion of the project and their losses due to the construction of the project can be compensated. Restoration measures are adopted to allow APs to regain their livelihood and to ensure that other affected businesses and enterprises, common properties, infrastrucuture facilities and cutural properties can be improved or at least restored as well. 3. The people working or living in the area along the railway line will be affected due to the acquisition of land and properties for construciton purpose. Definition of Resettlement Terms Affected Peoples 4. "Affected Peoples" refers to the people whose work and life is to be adversely affected by land acquisition for construction of the project including: (1) Peoples whose lands (including lands of various uses for homestead, public utilities, agriculture, forestry, husbandry and sideline industries), constructions (including private buildings and auxiliary facilities, enterprises' houses and buildings and public works), rights and interests or other properties be wholly or partially, temperarily or permanently acquisitioned or occupied. (2) People who are using above mentioned land, construcitons or properties or whose businesses, works, residences or living habits be affected adversly. (3) People whose living standard be adversely affected due to land acquisition and relocation. 5 RAP under Additional Second Line Project of LZR 5. All of APs will be taken into consideration and be recorded . 6. All APs shall be compensated to restore and develope their living standards and for their property losses. Compensation for property losses shall be according to principle of replacement prices, any discount or cut in compensation amount in the name of depreciation or other excuses is not allowed to secure APs' rights and interests. Moreover, besides the compensation for property losses, subsidy shall be granted for APs restore the properties. The people who are operating businesses, reclaiming the lands and building houses without properties, rights and interests and liences for lawful residences due to the affect by the Project shall be treated equally to people who are with properties, rights and interests and liences for lawful residences, and are entitled to restoration of their living standards and the compensation for property losses. Resettlement and Restoration 7. "Resettlement and Restoration" means arrangements by which APs can restore their production activity and ability and can improve or at least regain their living standards. These arrangements include: (1) Relocation of life arena; (2) Reemployment arrangement for those whose works have been affected; (3) Restoration or compensation for affected land, working arena, trees and infrastructures; (4) Restoration arrangement for those whose living standard have been adversely affected ( i.e. harmful gas pollution) due to land acquisition and relocation; (5) Restoration and compensation arrangement for APs and affected enterprises; (6) Restoration for affected cultures and common properties. 6 RAP under Additional Second Line Project of LZR 1 Project Introduction 1.1 Project Background 1.1.1 Project Current Status 8. Liupanshui-Zhanyi Section (Hereinafter referred to as Liu-Zhan Railway)of Guiyang-Kunming Railway (Hereinafter referred to as Gui-Kun Railway) is located at the border area of Yunnan Province and Guizhou Province, extending from Liupanshui City (Lanba) of Guizhou Province in the east to Qujing City (Zhanyi) of Yunnan Province in the west. Liu-Zhan Railway starts from Lanba Station at Liupanshui Hub of Guizhou Province, extending westward passing cities and counties such as Shuicheng, Xuanwei, Zhanyi, Qujing, etc. and finally reaches Qujing Station(Zhanyi) of Yunnan Province. It has a total length of 253.633km, of which 79.533km is in Guizhou Province and 174.1km in Yunnan Province. Liu-Zhan Railway Line connects eastward to the newly-built Neijiang-Kunming Railway Line to reach northward to Chengdu City; and can reach Guiyang, the capital of Guizhou Province, and then eastward to most parts of the country by way of Zhu-Liu Double-Track Line. It goes down southward to Nanning by Nan-Kun Railway via Pan-Xi Railway and Shui-Bai Railway; the line runs westward to Kunming, the capital of Yunnan Province, via Qujing City, and connects to Kunming-Hanoi Meter Track Railway and the local railways of Cheng-Kun Railway, Nan-kun Railway and Kun-Yu Railway via Kunming. It connects to Guang (Guangtong)-Da (Dali) Railway and the planned Yunnan International Railway Pass, Dali-Lijiang Railway by ways of Kunming-Guangtong Section of Cheng-Kun Railway. 1.1.2 Necessity of Construction of LZR 9 LZR is to construct an additional second line based on existed railway line in order to obviate current transporation bottleneck of Gui-Kun Railway and proceed to realize general goal of national raiway network construction. Gui-Kun Railway together with Shanghai-Hangzhou Railway, Zhejiang-Ganzhou Railway and Hunan-Guizhou Railway constitute the most important latitudinal trunk railway line south of Long-Hai Railway, and an important part of Shanghai-Kunming Passage, namely Shanghai-Zhuzhou-Guiyang-Kunming Railway Line, which is the 2nd latitudinal passage in national Railway Network Kingtruss of "Eight Meridionals Eight 7 RAP under Additional Second Line Project of LZR Latitudinals". Shanghai-Kunming Passage only leave Liupanshui-Zhanyi Section still with a single line which doesn't match the operation ability and train running speed of the whole passage. Construction of additional second line to this section is not only necessary to the improvement of Shanghai-Kunming Pasway but also to framing of international passages connected with Southeast Asia and South Asia, and is important for fast development of national railways. 10 Half of Yunnan's freight transportation is by Gui-Kun Railway, and the single-track Liu-Zhan Section has become the transportation bottleneck. Located in the middle part of Gui-Kun Railway passing through important energe resource bases such as Qujing City and Liupanshui City, the project can satisfy transportation demand along the line and facilitate sustainable socioeconomic development. 11 Current traffic capacity of Liu-Zhan Railway is of 9 couples of trains per day and 1681 X 104 tons of freight transportation volume per year. Transportation ability of Xuanwei-Zhanyi Railway Section has been sacturated since 2002 with the transportation volume reaching 10 couples of trains per day and 1427X 1 04tons of freight per year. Till 2015, the transportation volume is expected to reach 27 couples of trains per day and 2290X 104 tons of freight per year. Current single-track line can't satisfy the increasing transportation demand. Due to the low standard and small curve radius, average running speed of passenger trains and cargo trains at this section is only 48.5km/h and 23.4km/h respectively, which is far short of transportion qulity requirements of passengers and consignors and is weak in fierce competition of transportation market. Construction of Additional Second Line of Liu-Zhan Railway along with the improvement of railway standard are also in consistent with national railway development requirements. 1.2 Project Research and Design 12 SSDI, the design unit of the Project had proposed various double- track reconstruction schemes based on respective survey and research made on Liu-Zhan Section early at 70s to 90s. According to the requirements stated in <JCH Ref No. [2003]27> of Planning & Development Section (PDS)of Ministry of Railways (MOR), project research and design work have been carried out based on available research results of SSDI. MOR issued official letters to Chengdu Municipal Bureau of Railways 8 RAP uLnder Additional Second Line Project of LZR and Kunming Municipal Bureau of Railways as well as other related units and governmental departments in Yunnan Privince, Guizhou Province, Liupanhsui City and Qujing City to collect their opinions and suggestions on the Project at Oct 2003. The Liu-Zhan Section Preparatory FSR is accomplished by SSDI at Dec. 2003. PDS organized " Feasibility Study and Review Meeting for Construction of Additional Second Line of Liu-Zhan Section of Gui-Kun Railway " at Kunming from 20th to 21 st March 2004, and SDDI prepared "Supplementary to Feasibility Study on Additional Second Line of ZLR" based on the meeting results at April 2004. According to < Notice on Delivering Adjustment Plan to Railway Survey and Design 2004> of PDS ( ref. no. ZLH (2004) 263), SDDI started preliminary survey on 253.633 main track km of LZR (From Lanba Station to Qujing Station) at March 2005 and ended at middle of June 2005. This Project FSR (for ratification) was accomplished at June 2006. 1.3 Project Introduction 13 Design requirements are as follows: Railway Grade I * Number of main tracks: double track * Limited slope: 6%o; reinforced slope: 13%o * Minimum curve radius: 2000m generally * Designed running speed for passenger train in the section: 160km/h * Type of pulling power: electric power. * Effective length of the arrival or departure line: 850m * Type of closing: automatic. 14 Main project contents include: 1) The proposal of new double track shortcut will be adopted in Meihuashan-Qiewu Section (83km), with a target speed of 160km/h. 2) A second line shall be built along the existing line for Qiewu-Zhanyi Section (119km), and the existing line shall be rebuilt applicably. The target speed is 160km/h. 3) The contents of major projects of Liupanshui Hub are as follows: additional second line from Maga to Shuangshui via Liupanshui and Shuicheng, additional 9 RAP uLlider Additional Second Line Project of LZR second line from Maga to Shuangshui via Caojiawan and South Liupanshui, and newly-built link from South Liupanshui to Shuicheng. 15 Liu-Zhan Railway(from Liupanshui (Lanba K223+300) to Zhanyi (Approach line of Qujing Station K477+00)), has a total length of existing line 253.633 main track km and 219.349 main track km for the new left track. For details, see Form 1-1. Relevant works include: * Meihuashan Line untwining work length of the line is 10.25km * Nei-Kun line reconstruction project length of the line is 1.984km * Pan--Xi line reconstruction project length of the line is 1.90km * Pan--Xi line untwining work length of the line is 4.15km Form 1-1 Mileage Distribution of Liu-Zhan Railway in Different Section Newly-Built Left Track Scope Track Length (kin) Left Track of Liupanshui Hub K223+300-K268+500 45.664 Meihuashan - Provincial Border K268+500-AK297+800 23.694 Left Track Provincial Border-Xuanwei(Fenghuangshan AK297+800-K376+700 52.034 Local Border) Left Track Xuanwei(Fenghuangshan Local K376+700-K471 +000 91.868 Border) - Zhanyi Left Track Zhanyi - Qujing Left Track K471 +000-K477+000 6.089 Total Track Length 219349 16 The major construction works of LZR project include: 2181.95x104m3 roadbed earthwork, 123.22x104m3 roadbed masonry work, 12km soft soil section of roadbed, 23km carst section, 52 bridges with the extended meter of 18700m, 904 culverts with transversely extended meter of 31257.4m, 41 tunnels with extended meter of 71148m, 347.24km newly-paved rail of the main track:, 411 sets of railroad switches and 114.62x104m3 ballasts. The proportion of bridges and tunnels is 39.60%. 1.4 Project Impact 17 The total length of the Additional Second Line Project of LZR is 219.349km, which starts from Lanba of Liupanshui City in Guizhou Province and enters Xuanwei City, Zhanyi County and Qilin District in Yunnan Province via Shuicheng County and 10 RAP under Additional Second Line Project of LZR Zhongshan District of Liupanshui City in Guizhou Province and Weining County of Bijie City in Guizhou Province, and then connects to Qujing City. It passes by 2 provinces, 3 cities and 6 counties (districts). 23 towns (townships or streets) and 85 administrative villages are affected by the land requisition and relocation under the Project. A total area of 20,384.77 ha. of land various kinds will be acquisitioned including 10,284.45 mu. plowland, 2,027.41 mu. garden land, 1,051.95 mu. wood land, 1,435.55 mu. land for construction and 55,585.415 mu. unused land. There are 10,137.048 mu newly-requisitioned land, 8,866.65 mu borrow and spoil land land and1381.072 mu reclaimed land. A total of 14,103 people of 3,526 households are affected by demolishment and relocation of houses and buildings with a total building area of 528,857 m2 Of which 103,464 m2 are of brick-concrete structure, 375,145 m2 of brick-timber structure and 50,248 m2 of soil-timber structure. More than 50,000 trees and a few special facilities are affected. 1.5 Measures to Lessen Project Impact 1.5.1 During Project Plan and Design Period 18 Project design unit and peoject proprietor take a few of effective measures to alleviate socioeconomic impact of the Project on local people which include: A. When making optimum comparative choice of design schemes, take project impact on local socioeconomy as key consideration; B. In order to reduce land acquitsition and resettlement to the least, project design is in compliance with the principle of "Try to avoid area with dense population and residence to reduce relocation; Try to reduce occupation of plowland or land to as least as possible"; C. Optimize engineering design, shorten project construciton period, and appropriately schedule houses demolishment, relocation and constrcution 1.5.2 Constrcution Period 19 A. Strenghten public participation machanism. Publicize the project start date and construction schedule by notice in project impact area and resettlement area. Publicize compensation policy for land acquisition, relocation and resettlement subject to supervision by migrants and local people in resettlement area; 20 B. Measures to reduce dust. Watering the working pavements in highly populated area when it continues with several sunny and windy days in order to 11~~~~~~~~~~~~~~~~~~~~~~~1 RAP under Additional Second Line Project of LZR reduce dust and keep the constrcution area under cleari and comfortable condition. Working units will plan the route for transportation of earthworks, avoid overloading and falling of earthworks on the way. 21 C. Disposal of wastes on working sites. Due to the long construction period and a large number of workers, working area produces a great amount of living garbages and various wastes. Project construction and working units will clean up living garbage and various wastes in the working area on time every day to keep tidy and clean of working sites and avoid ocurrence and spread of contagious diseases. 22 D. During the construction period, make priority use of local materials, logistics and labors subject to techinical permission, to ensure that APs can benefit from project construction 1.5.3 Planning and Implemention of RAP 23 When land acquisition and relocation is inevitable, following measures will be adopted to reduce project impact: A. Strengthen survey and collection of basic data, make in-depth analysis on local socioeconomic status and future development, prepare feasible resettlement action plan according to local actual situations, ensure that APs' living standard will not be degraded due to construction of the Project; B. Strengthen inside and outside monitoring systems, establish efficient and smooth feedback channel and system, shorten data processing period, ensure that various problems occurred during construction period can be duly resolved; C. Working units are required to adopt effective measures to reduce project impact on local production 1.6 Scheduling 24 According to general schedule of the Project, it will be started since June 2006 till March 2010 with construction period of 4 years. According to general schedule of project construction, preparation work for resettlement is underway. Resettlement Action Plan is formualted according to World Bank requirements and is scheduled to be submitted for World Bank's evaluation at July 2005. Implementation of resettlement will begin at Oct 2005 since which land acquisition, houses relocation and resettlement will be carried out step by step. It is expected to be completed before April 2006 and is subject to monitoring and evaluation according to World Bank requirements 12 RAP under Additional Second Line Project of LZR 1.7 Preparation for Resettlement and Monitering & Evaluation 1.7.1 Investigation and collection of physical indicators 25 During a period from April to June 2005, with the coordination and cooperation of Chengdu Railway Bureau, Kunming Railway Bureau and SSDI, the survey has been made on affected physical indicators with spot check method in project impact area in Guizhou Province and Yunnan Province by two investigation teams organized by SSDI Kunming Branch according scope defined in FSR on Reconstructing LZR prepared by SSDI at Dec. 2003. The spot check method will be detailed in Section 4.1. in the RAP. Besides, investigation teams carried out migrant environment capacity analysis based on investigation of socioeconomy and migrant envirionment capacity in project impact area and provided instructions and technical consultation for RAP. nvestigation and collection of affected physical indicators takes more than three months and is greatly supported by various levels of local people's governments, villagers ( residents)committees and migrants along the line.According to variety of affected subjects, Investigation and collection of affected physical indicatorses involves in land acquisition, APs, demolishment and relocation of houses and auxiliary facilities, felling of scattered trees, relocation and rebuild of specific facilities, etc. 1.7.2 Socioeconomic Survey 26 In order to analyze project impact and establish feasible resettlement action plan, survey team has conducted detailed socioeconomic survey on villages (towns and streets) and migrants in project impact area and resettlement area. The contents of the survey include land resource, industrial structure, economic level, income and expenses, population, life style, cultures and custom, traffic, resource and development potentiality, etc.. Investigation adopts the method of collecting available various statistical data combining field spot check. Analysis on local socioeconomic status and residents' actual production and living status has been conducted based on data from field investigation. See Annex B for investigation results. 1.7.3 Resettlement Programming 27 Througth adequately hearing of opinions and suggestions of villigers and migrants, lead by local county (city or district) people's governments in project impact area, resettlement planning under the Project is conducted according to project affected scope and numbers of affected subjects . Feasible RAP is established based 13 RAP under Additional Second Line Project of LZR on background of respective villiages (towns and streets). Measures including land adjustment within village (Group) area, improvement of infrastructures, development of secondary and tertiary industries, economic compensation, etc. will be adopted. Carry through the " Development Resettlement Guideline" to ensure resettlement area with both basic subsistance conditions and development potentiality; Combine resettlement with regional exploitation and economic development, by which migrants can make wealth gradually and their living standard can be restored or improved. 1.7.4 Preparation for resettlement and monitoring & evaluation 28 The project proprietor engages Foreign Capital Institute of Southwest Jiaotong University M(FCI) as independent monitoring and evaluation unit for project resettlement. Preparation for resettlement planning is organized by construction unit. Monitoring and evaluation unit shall provide technical assistance. Design unit shall define the project impact scope. Related units, local governments of all levels and representatives of APs shall jointly participate in the preparation of RAP. Since March 2005, works such as establishment of resettlement organization, defining project impact scope, drawing up Working Outline of RAP, survey on quantity of affected subjects by land acquisition, socioeconomic survey, policy research, formulating resettlement plan, compensation budgetary estimate, etc. have been accomplished in succession. The formulation of RAP for construction of additional second Line of LZR and preparation work for resettlement monitoring and evaluation have been completed. 1.8 Basis and Objectives of RAP 1.8.1 Basis 29 The RAP is mainly based on related national laws and regulations t, relevant provincial regulations and implementation measures, World Bank's policy on social security and project design document, etc. which are detailed as follows: (1) The Land Administration Law of the People's Republic of China and Regulations for the Implementation of the Land Administartion Law of the People's Republic of China (2) Law On Land Contract in RuralAreas; (3) Organic Law of the Villagers Committees; (4) Regulations for the Implementation of the Land Administartion Law of the People's Republic of China of Yunnan Province and Guizhou Province 14 RAP under Additional Second Line Project of LZR (5) Management Measures for Demolition and Relocation of Urban Buildings of Liupanshui City (6) World Bank's Policy on Social Security OP/BP4.12 - Involuntary Resettlement. (7) Project design documents, relevant drawings and design & survey results (8) Other relevant documents and data 1.8.2 Policy Objectives 30 (1) Try to avoid or reduce quantity of affected physical indicators by land acquisition, relocation and resettlement through adopting effective engieering, techinical and economic measures. .Try to lessen the impact of land acquisition and relocation on local people's production and living by adopting effective measures; 31 (2) Conduct socioeconomic survey during preparatory period and work out corresponding resettlement plan; 33 (3) Resettlement is based on physical indicators and compensation standart, aiming at improve or at least restore the living standard of migrants 34 (4) Advocate development resettlement. Resettlement in rural area will follow the guideline of " Based on land, relying on local developed secondary and tertiary industry and creating employment opportunities" 35 (5) Establish and enhance guranttee system for basic livelihood of rural people on acquisitioned land; 36 (6) encourage migrants' participation in preparation for resettlement plan; 37 (7) Take priority consideration of resettlement within original community. 15 RAP under Additional Second Line Project of LZR 2 Natural and Socioeconomic Background of Project Impact Area 2.1 Natural and socioeconomic background of Liupanshui City of Guizhou Province 38 Located at border area of Yunnan Province and Guizhou Province, LZR is an important passage to North China and East China, the land area along the line is 57x 104 km4. 39 Guizhou Province is located at Southwest China, connecting with Sichuan Province in the north, Hunan Province in the east, Guangxi Province in the south and Yunnan Province in the west, with a total national land area of 17.6x 104 km2 .There are a total of 49 nationalities such as Han, Miao, Buyi, Tong, Tujia, Yi, Yilao, Shui, etc., among which minorities accounting for 37.8% of total population of the province. Guizhou's socioeconomic development has made great achievements since Open and Reform. Annual GDP increase from RMB 1.25 billion in 1985 to RMB 10.85 billion in 2001 with an average annual increase of 14.46%. Structural proportion of three industries evolves from 41:40:19 in 1985 to 25.3:38.7:7.36 in 2001. Guizhou's socioeconomic development still lags far behind national level, and its GDP per capita is of RMB 2895, only 38.38% of national GDP per capita, ranking least at West and South China. According to the provincial planning , till 2005, GDP and GDP per capita is expected to reach RMB 15.3 billion and RMB 3844 respectively; structural proportion of three industries tends to be more rational with the ratio of 21:43:36, a few of enterprises of features and advantages will be enhanced, socioconomic informatization level will be greatly improved, and GDP will be doubled till 2010. 40 Located in the west of Guizhou Province on the confines of north latitude "25`19'44`-26

Key facts
Organisation World Bank Group
Document type Resettlement Plan
Adoption date
Country China
Source World Bank