E1700 v 2 Guo Huan Ping Zheng A No. 1039 Baosteel Co., Ltd. Product Matrix and Process Equipment Upgrading and Technical Transformation Project of Meishan Iron and Steel Company Environmental Impact Report (Simplified Version for World Bank) Central Research Institute of Building and Construction, MCC Group Nanjing Municipal Environmental Protection Scientific Research Institute October 2005 Entrusted by: Shanghai Meishan Iron and Steel Co., Ltd., Baosteel Group Assessed by: Central Research Institute of Building and Construction, MCC Group Assessment Certificate No.: Guo Huan Ping Zheng A No. 1039 Responsible person of Undertaker: Dong Wenjun (Director and prof. level senior engineer) Responsible person of assessment department: Yang Liqin (Senior engineer) Project responsible person: Yi Haitao (Prof. level senior engineer, A10390001) Members of project team: Certificate Name Title Responsible for Signature No. 1. General Prof. level2. Briefs of project and pollution Yi Haitao senior factor analysis A10390001 engineer 8. Assessment conclusions Overall proofreading 3. Feasibility analysis of Senior environmental protection measures Yang Liqin A10390008 engineer and its technological and economic justification Senior 5. Environmental risk analysis Zhang Yuanqi A10390005 engineer Senior 6. Environmental management and Yuan Yuming A10390003 engineer monitoring program Doctor 4. Pollutant emission to standards and Wei Youquan A103900015 overall amount control and analysis Senior 7. Public participation Gao Xiaojie JA1907003 engineer Technical review by: Dai Jingxian (Prof. level senior engineer, A10390007) Cooperated by: Nanjing Municipal Environmental Protection Scientific Research Institute Assessment Certificate No.: Guo Huan Ping Zheng A No. 1907 Director: Feng Xiaoyi (EA) Post Certificate No. A19070002 Project responsible person: Dai Fengsheng (EA) Senior Post Certificate No. JA1907002 Jiang Leping (EA) Post Certificate No. A19070013 Main drafters: Gao Xiaojie (EA) Post Certificate No. JA1907003 Liu Chunyang (EA) Post Certificate No. A19070012 Ji Zhengyu (EA) Post Certificate No. A19070019 Xie Zhiwei (EA) Post Certificate No. A19070033 Cooperated by: Jiangsu Provincial Environmental Protection Scientific Research Institute Assessment Certificate No.: Guo Huan Ping Zheng A No. 1902 (Qualification dedicated for jetty) Table of Contents 1. General..................................................................................................................................5 1.1 Overall presentation of project.............................................................................................5 1.2 Analysis on the compatibility of the project with industrial policies and local development planning......................................................................................................................................8 1.2.1 The proposed project conforms to the industrial development policies of the state...............................................................................................................................8 1.2.2 The proposed project conforms to the requirements for industrial development policies of the state for metallurgical industry...........................................................10 1.2.3 The proposed project conforms to the overall planning of Baosteel Co., Ltd. .12 1.2.4 Analysis of compatibility of the proposed project with overall urban planning12 1.2.5 Analysis of compatibility of the proposed project with environmental planning ....................................................................................................................................13 1.3 Working procedure for assessment.....................................................................................14 1.4 Basis of preparation............................................................................................................14 1.4.1 Laws and regulations of the state......................................................................14 1.4.2 Local laws and regulations................................................................................16 1.4.3 Relevant documents and data............................................................................16 1.5 Purposes and requirements of assessment..........................................................................16 1.6 Main contents and points of assessment ............................................................................17 1.6.1 Main contents of assessment.............................................................................17 1.6.2 Main points in assessment work........................................................................18 2. General conditions the proposed project and pollution factor analysis........................19 2.1 Necessity of project construction.......................................................................................19 2.2 Environmental protection control and rectification plan to bring up the old with the new21 2.3 Pollution factor analysis for the proposed coking project..................................................22 2.4 Pollutant prevention, treatment and control measures for coking project..........................28 2.4.1 Discharge of waste gas pollutants and control and rectification measures.......28 2.4.2 Waste water pollutant discharge and control and rectification measures..........38 3. Feasibility analysis and technical and economic demonstration of environmental protection measures ...............................................................................................................29 1 3.1 Overview of environmental protection measures for existing projects..............................29 3.1.1 Existing waste gas pollution control measures .................................................29 3.1.2 Existing wastewater pollution control measures...............................................32 3.1.3 Solid waste pollution control measures for existing projects............................33 3.1.4 Noise control measures in existing projects......................................................35 3.1.5 Existing environmental problems......................................................................37 3.2 Analysis of pollution prevention and control measures for intended project and countermeasures.......................................................................................................................38 3.2.1 Prevention and control measures of key waste gas pollution sources and feasibility analysis......................................................................................................38 3.2.2 Prevention and control measures for main wastewater pollution sources and feasibility analysis......................................................................................................55 3.2.3 Analysis of noise control...................................................................................66 3.2.4 Solid waste treatment and comprehensive utilization.......................................66 3.2.5 Control measures for general stock house.........................................................69 4. Analysis for Pollutant Meeting-standard Emission and Total Amount Control ..........70 4.1 Determination of enterprise pollutant emission and total amount control quotas...........70 4.2 Pollutant meeting-standard emission and total amount control analysis for planned project.......................................................................................................................................70 4.2.1 Waste gas and its pollutant meeting-standard emission and total amount control.........................................................................................................................70 4.2.2 Waste water and its pollutant meeting-standard discharge and total amount control quotas.............................................................................................................71 4.2.3 Solid waste emission amount control quotas ....................................................73 4.3 Analysis for total amount control.......................................................................................73 5. Environmental Risk and Accident Discharge Analysis...................................................74 5.1 Risk factors Identification..................................................................................................74 5.1.1 Risk factors identification of raw materials, assistant materials, and products.74 5.1.2 Risk factors identification for production process ............................................76 5.1.3 Risk factors identification during materials storage..........................................76 5.2 Precautions against risk accidents......................................................................................76 5.2.1 Precautions against risk accidents occurring in production process.................76 5.2.2 Precaution against risk accident during materials storage ................................77 2 5.3 Disaster plan and emergency measures against sudden accident.......................................78 5.3.1 Disaster emergency plan against sudden accident ............................................78 5.3.2 Emergency measure against sudden accident ...................................................78 5.4 Accident discharge and measures.......................................................................................79 5.4.1 Failures of sewage disposal facilities and measures .........................................79 5.4.2 Waste gas accident discharge and measures......................................................79 5.5 Comprehensive measures against environment risk ..........................................................80 6. Environmental Management and Monitoring Plan........................................................81 6.1 Environmental management and organizational structure.................................................81 6.1.1 Environmental management structure...............................................................81 6.1.2 Environmental management responsibilities ....................................................83 6.2 Environmental monitoring organization and supervising plans.........................................84 6.2.1 Environmental monitoring organization ...........................................................84 6.2.2 Tasks of the monitoring stations........................................................................85 6.2.3 Environmental supervising plans......................................................................85 6.2.4 Automatic environmental monitoring ...............................................................86 6.3 Wastes outlets signs and management................................................................................88 6.4 Management of technical documents.................................................................................90 6.5 Acceptance contents of environmental protection "three concurrence" of the planned and "new bringing along the old" projects......................................................................................91 7. Public Involvement............................................................................................................. 96 7.1 Purpose and action of public involvement.........................................................................96 7.1.1 Purpose of public involvement..........................................................................96 7.1.2 Action of public involvement............................................................................96 7.2 Methods, investigation and people to be visited of the public involvement......................96 7.2.1 Methods of public involvement.........................................................................96 7.2.2 Investigation items of the public poll................................................................97 7.2.3 Composition of the public poll..........................................................................97 7.3 Result of Public Poll.........................................................................................................120 7.3.1 Statistics of the Poll.........................................................................................120 7.3.2 Public Suggestions and Demands ...................................................................120 7.3.3 Analysis of Objections ....................................................................................122 3 8. Assessment conclusions.................................................................................................... 123 8.1 Overview of the current status of Meishan Iron and Steel Company ..............................123 8.1.1 Basic situation.................................................................................................123 8.1.2 Discharge of main pollutants from existing facilities .....................................123 8.2 Overview of the intended project.....................................................................................125 8.2.1 Main construction content and compliance to industrial policy .....................125 8.2.2 Compatibility between urban planning and environmental planning .............128 8.2.3 Main pollution control measures and environmental protection investment of intended project........................................................................................................128 8.2.4 Total discharge of pollutants in the intended project.......................................129 8.3 Main conclusions on topic-specific assessment...............................................................130 8.3.1 Assessment on the feasibility of environmental protection measures.............130 8.3.2 Assessment conclusions on clean production..................................................131 8.3.3 Assessment on up-to-standard pollutant discharge and total amount control.132 8.3.4 Conclusions on the feasibility of site selection...............................................133 8.3.5 Assessment conclusions on current status of ambient air quality and impact.133 8.3.6 Assessment conclusions on the current status of water environmental quality and impact analysis ..................................................................................................135 8.3.7 Assessment conclusions on the current status of sound environmental quality and impact................................................................................................................135 8.3.8 Conclusions on analysis of solid waste discharge and impact........................136 8.3.9 Analysis of environmental impact in construction period...............................136 8.3.10 Analysis of environmental risks....................................................................136 8.3.11 Analysis conclusions on economic benefit of environmental impact ...........136 8.3.12 Public participation and conclusions.............................................................137 8.4 General conclusion...........................................................................................................137 8.5 Suggestions.......................................................................................................................139 4 1. General 1.1 Overall presentation of project Shanghai Meishan Iron and Steel Co., Ltd. (hereinafter referred to as Meishan Iron and Steel Company), formerly affiliated to Shanghai Economic Commission, is an enterprise with sole state investment. Meishan Iron and Steel Company became a subsidiary of Baosteel Co., Ltd. when it was formed by the state in 1998, and in May 2005, it became a holding subsidiary of Baosteel Co., Ltd., as one of the 512 large scale state-owned enterprises receiving prior support by the State Council. During the 1990s, with the approval by the State Planning Commission, Meishan Iron and Steel Company used national loans with discounted interest rates in the technical transformation for over a decade in succession, and the production and technical equipment and the automatic control level of the Company reached the advanced level in China, some reaching the advanced international level, especially in the construction of steel melting, continuous casting, hot rolling and blast furnace system projects and the associated works, thus greatly upgrading its actual production capacity, and the technical content and added value of products. Meishan Iron and Steel Company has become a large scale iron and steel complex with the complete production flow of coking, sintering, iron melting, steel melting, continuous casting and steel rolling. In 2004, Meishan Iron and Steel Company had total assets of 13,225 billion yuan, and its steel output reached 3 million tons. At present, although Meishan Iron and Steel Company has the overall production capacity of 2,980,000t/a iron, 3000,000t/a steel and 2,890,000t/a hot rolling plates and coils, with the equipment reaching the advanced level in the country, it can only produce hot rolling products because its product matrix is not quite rational, therefore its profitability ability is not strong, and it is vulnerable to market risks. In the meantime, as Meishan Iron and Steel Company was one of the iron making bases of Shanghai before it became a subsidiary of Baosteel in 1998, its systems for making iron already had a long operation life and the key production facilities have become aged, with equipment level at comparatively backward level, and they have the problems of high overall energy consumption, low comprehensive utilization rate of resources and poor environmental quality. According to the new industrial policies of the state, the requirements for sustainable development of national economy and the strategies of Baosteel Co., Ltd. for its new round of growth, Meishan Iron and Steel Company will take the opportunity of Baosteel Co., Ltd. to speed up the construction of high quality steel products manufacture system and to further advance the construction of high grade steel plate production base, make the upgrading and transformation of system equipment upgrading as the start point on the platform of rational, professional and large scale division of work in Baosteel, introduce new processes, new technologies and new equipment to a rational extent with the world first-rate iron and steel production technological and research and development ability of Baosteel, to further reduce the overall energy consumption, improve the environmental quality and increase the overall 5 competing power of Meishan Iron and Steel Company. For this purpose, Baosteel has decided to implement the project "Product matrix and process equipment upgrading and technical transformation project of Meishan Iron and Steel Company of Baosteel Co., Ltd." with Meishan Iron and Steel Company as the leading investor and mainly on the existing factory areas of Meishan Iron and Steel Company, with small amount of land requisition in the surrounding areas. After the completion of this project, the production scale of Meishan Iron and Steel Company will be pig iron at 5,370,000t/a, converter steel (billets for continuous casting) at 5,300,000t/a, and steel materials at 5,030,000t/a, with sales amount reaching 7832.488bwy and profit 2132.89 million yuan; it will realize sufficient utilization of resources and the main economic indicators will be at the advanced level both at home and internationally. Therefore, it is necessary to perform the following upgrading and rectification and correction with an investment of 19.80539 billion yuan on the existing foundation of steel output of 3,000,000t/a: Add one 380m2sintering strant, for annual output of sintered ores of 3,912,000t, increasing the total output of sintered ore of the whole Company to 8,752,000t/a; Add one 3200m3 blast furnace, for annual output of molten iron of 2,464,000t, increasing the total output of molten iron of the whole Company to 5,374,600t/a; Construct 2 sets of 2
Группа Всемирного банка · Environmental Assessment
China - Meishan Coke Dry Quenching Project : environmental impact assessment (Vol. 2 of 2) : Environmental impact report : product matrix and process equipment upgrading
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Environmental Assessment
Страна
Китай
Источник
Всемирный банк