World Bank Group · Implementation Completion and Results Report

Algeria - Industrial Pollution Control Project

Algeria World Bank
View original document

The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.

Full text

Document of The World Bank Report No: 34512 IMPLEMENTATION COMPLETION REPORT (CPL-40340 SCL-4034A SCPD-4034S PPFB-P2410) ON A LOAN/CREDIT/GRANT IN THE AMOUNT OF US$36.4 MILLION TO THE DEMOCRATIC AND PEOPLE'S REPUBLIC OF ALGERIA FOR AN INDUSTRIAL POLLUTION CONTROL PROJECT December 30, 2005 CURRENCY EQUIVALENTS (Exchange Rate Effective October 2005) Currency Unit = Algerian Dinar (DA) DA 1.00 = US$ 0.014 US$ 1.00 = DA 72.00 FISCAL YEAR January - December 31 ABBREVIATIONS AND ACRONYMS ASMIDAL: Entreprise Nationale des Engrais et Produits Phytosanitaires BOD : Biochemical Oxygen Demand CNP : Conseil National de la Planification DGE : Direction G

Key facts
Organisation World Bank Group
Adoption date
Country Algeria
Source World Bank