RP202 VOL. 4 Dashadi Resettlement Implementation Plan Table of Contents 1 . Introduction .........................................................................8 1.1 Project summarization .........................................................................8 1.1.1 Brief introduction of the project .........................................................................8 1.1.2 General situation of the project area ........................................................................ 10 1.2 Analyses of the economic environment of the project resettlement ....................................... 13 1.2.1 Objective of the analysis of the economic environment of the resettlement ..................... 13 1.2.2 Socioeconomic characteristics of the project area ............................................................. 14 1.2.3 Analysis of the employment environment in the project area for the PAPs ...................... 15 1.2.4 Analyses of the business environment for small businesses and shops in the project area20 1.3 Summarization of the project resettlement ...................................................................... 23 1.3.1 Explanation of total quantity of resettlement involved in this Resettlement Implementation Plan 23 The first edition refers to the Involuntary Resettlement Plan submitted to the World Bank in November 2003 ..................................................................... 24 1.3.2 Explanation of the sources of the resettlement data of the second edition ........................ 26 1.3.2.1 Sources of the resettlement data of the second edition .................................................. 26 1.3.2.2 Evaluation of the accuracy of the data in the second edition ........................................ 26 1.3.3 Update of the resettlemen: data .................................................................... 26 1.3.4 Total quantity of the resettlement .................................................................... 27 1.3.5 Characteristics of the resettlement .................................................................... 27 1.3.6 Estimation of the resettlement cost .30 1.4 Measures to be taken to minimize the quantity of resettlement: .................. .......................... 30 1.5 Explanation of this Resettlement Implementation Plan ......................................................... 31 1.5.1 In obedience to the Resettlement Policy .................................................................... 31 1.5.2 Explanation of the chapter arrangement of the Resettlement Implementation Plan .......... 31 1.6 Classification of the impacted areas of the project ............................................................... 31 1.7 General list of the affected land and housings ..32 2. Status of the resettlement of the property owners and the compensation plan ...................... 33 2.1 Status of the resettlement of the property owners .................................................................. 33 2.1.1 Type and distribution of the permanently requested land .................................................. 33 2.1.2 Type and distribution of the temporarily requested land ................................................... 35 2.1.3 Property right and distribution of the temporarily affected buildings ............................... 36 2.1.4 Property right and distribution of partially but permanently affected buildings ............... 39 See Table 2.1.4.2 for the details ................................................................... 41 2.1.5 Property right and distribution of wholly and permanently affected buildings .41 2.1.6 Status of the structures, attachments and housing facilities .44 2.1.7 Status of the infrastructure .44 2.1.8 Analysis of the income of the property owners .44 2.2 Compensation plan ........................................................................ 46 3. Status of the PAPs who rent the houses with market-price and the resettlement, compensation and rehabilitation plans for them .......................................................................... 49 3.1 Status of the PAPs who rent the houses with market-price .................................................... 49 1. The detail of the property right, usage, demolition method and area grade of the PAPs who rent the houses with market price can be seen in Table 3.1. .................................................................. 49 3.1.1 Property right and distribution of the housings with market rentals ............. ........................ 49 3.1.2 Property right and distribution of the shops with market rentals ............... ........................... 50 3.1.3 Property right and distribution of the enterprises with market rentals ............ ...................... 52 3.1.4 Status of the commonweal units with market rentals affected ................. ............................. 54 3.1.6 Situation of the PAPs that rent the houses with market price affected by the network of Dashadi Project ........................................................................ 57 3.2 Resettlement, compensation and rehabilitation plans for the PAPs who rent the houses with market-price ........................................................................ 57 4. Status of the PAPs whose property is temporarily affected and the resettlement, compensation and rehabilitation plans for them .......................................................................... 60 4.1 Status of the PAPs whose property is temporarily affected .................................................... 60 4.1.1 Property right and distribution of housings temporarily affected ...................................... 60 4.1.2 Property right and distribution of shops temporarily affected ........................................... 61 4.1.3 Property right and distribution of enterprises temporarily affected ................................... 62 4.1.4 Temporarily affected commonweal units and their distribution ................ ......................... 63 4.2 Resettlement, compensation and rehabilitation plans for the PAPs whose property is temporarily affected ......................................................................... 64 4.2.1 Resettlement, compensation and rehabilitation plans for temporarily affected housingsError! Bookmark not defined. 4.2.2 Resettlement, compensation and rehabilitation plans for temporarily affected shops ....... 64 4.2.3 Resettlement, compensation and rehabilitation plans for temporarily affected enterprises65 4.2.4 Resettlement, compensation and rehabilitation plans for temporarily affected commonweal units ....................................................................... 65 5. Status of the PAPs whose property is partially but permanently affected and the resettlement, compensation and rehabilitation plans for them ........................................................ 67 5.1 Status of the PAPs whose property is partially but permanently affected ........... ................... 67 5.1.1 Property right and distribution of the housings partially but permanently affected .......... 67 5.1.2 Property right and distribution of the shops partially but permanently affected ........ ....... 68 5.1.3 Property right and distribution of the enterprises partially but permanently affected ....... 69 5.1.4 Status of the partially but permanently affected commonweal units and the distribution ..... 71 5.2 Resettlement, compensation and rehabilitation plans for the PAPs whose property is partially but permanently affected ......................................................................... 71 5.2.1 Resettlement, compensation and rehabilitation plans for partially but permanently affected housings ............................................ .... Error! Bookmark not defined. 5.2.2 Resettlement, compensation and rehabilitation plans for partially but permanently affected shops .. . . Error! Bookmark not defined. 5.2.3 Resettlement, compensation and rehabilitation plans for partially but permanently affected enterprises .. . . Error! Bookmark not defined. 5.2.4 Resettlement, compensation and rehabilitation plans for partially but permanently affected commonweal units .... Error! Bookmark not defined. 6. Status of the PAPs whose property is wholly and permanently affected and the resettlement, compensation and rehabilitation plans for them ....................................................................... 75 6.1 Status of the PAPs whose property is wholly and permanently affected ............ .................... 75 6.1.1 Property right and distribution of housings wholly and permanently affected .......... ............... 75 6.1.4 Living condition of the PAPs whose property is wholly and permanently affected .......... 76 6.1.5 Household economy status of the PAPs whose property is wholly and permanently affected ........................................................................ 76 6.1.6 Population structure and household classification of the PAPs whose property is wholly and permanently affected ..................................................................... 78 Note: ...................................................................... 79 6.1.7 Commuting of the PAPs whose property is wholly and permanently affected .................. 79 6.1.8 Analyses of benefit and loss ..................................................................... 79 6.1.8.1 Benefits ...................................................................... 79 1. Benefit relating to the structure ..................................................................... 79 6.2 Principle of the setup of residential resettlement sites .......................................................... 80 6.3 Description of the residential resettlement sites .................................................................... 82 6.3.1 Xujing Garden neighborhood area resettlement sites (medium grade) ........... .................. 82 6.3.2 Zhongxing Garden neighborhood area resettlement sites (low grade) .............................. 87 6.3.3 Zhonghaikang City neighborhood area resettlement sites ............................................... 90 6.3.4 Huangpu Yigang Garden neighborhood area resettlement sites (top grade): . . 94 6.3.5 Resettlement site Neighboring Jinyi Residential area (medium grade): ............................ 98 6.4 Resettlement, compensation and rehabilitation plans for the PAPs .............. ...................... 104 7. Status of the permanently and wholly affected shops and the resettlement, compensation and rehabilitation plans for them ....................................................................... 107 7.1 Situation of the wholly and permanently affected shops . ............................... 107 7.1.1 Property right and distribution of the wholly and permanently affected shops ............... 107 7.1.2 Property and Structure of the wholly and permanently affected shops ........................... 107 7.1.3 Distribution of permanently affected shops ..................................................................... 108 7.1.4 Distribution of the ownership of the wholly and permanently affected shops ......... ....... 108 7.1.5 Industrial distribution of the wholly and permanently affected shops ............................. 108 7.1.6 Business condition of the ownership of the shops wholly and permanently affected ..... 108 7.1.7 Business condition of the industry of the shops wholly and permanently affected ......... 108 7.2 Principle of the setup of resettlement sites for affected shops ............................................. 109 7.3 Description of the resettlement sites for the affected shops .................................................. 110 7.4 Resettlement, compensation and rehabilitation plans for the wholly and permanently affected shops 115 8. Status of the enterprises wholly and permanently affected and the resettlement, compensation and rehabilitation plans for them ...................................................................... 118 8.1 Distribution of the wholly and permanently affected enterprises ......................................... 118 8.1.1 Property right and distribution of enterprises wholly and permanently affected ............. 118 8.1.2 Structure and distribution of the enterprises wholly and permanently affected .............. 118 8.1.3 Distribution of permanently affected enterprises ............................................................. 119 8.1.4 Distribution of the ownership of the wholly and permanently affected enterprises ........ 119 8.1.5 Trade distribution of the wholly and permanently affected enterprises ........................... 119 8.1.6 Business condition of the ownership of the wholly and permanently affected enterprises 119 8.1.7 Business condition of industry of the enterprises wholly and permanently affected ....... 119 8.2 Principle of the setup of resettlement sites for affected enterprises ..................................... 120 8.3 Description of the resettlement sites for affected enterprises ............................................ 121 8.4 Resettlement, compensation and rehabilitation plans for the wholly and pernanently affected enterprises .................................................................. 127 9. Status of the permanently and wholly affected commonweal units and culture relic and the resettlement, compensation and rehabilitation plans for them ..................................................129 9.1 Status of the permanently affected commonweal units .................................. ............ 129 9.2 Resettlement, compensation and rehabilitation plans for affected commonweal units ....... 129 9.3 Status of culture relic ...................................................................... 130 After the culture relic is horizontally moved or rebuilding, it shall be then handed over to the culture bureau at municipal or district level. 10. S tatus of the institutions and the resettlement, compensation and rehabilitation plan for them 1 31 10. Status of the institutions and the resettlement, compensation and rehabilitation plan for them 132 10.1 Brief introduction of the institutions .................................................................. 132 10.2 Relevant resettlement, compensation and rehabilitation plans Error! Bookmark not defined. 11. Status of the rural areas and the resettlement, compensation and rehabilitation plans for them 134 11.1 Basic status of the rural areas ........................................................................ 134 11.2 Basic condition of the labourforce ........................................................................ 134 11.3 Resettlement channels and safeguard mechanism for the labour force.. Error! Bookmark not defined. 12. Status of the vulnerable group and the resettlement, compensation and rehabilitation plans for them ........................................................................ 137 12.1 Basic situation of the vulnerable group .......................................................................... 137 12.2 Resettlement, compensation and rehabilitation plans for the vulnerable group ........ ......... 137 13. Explanation on preparation of Compensation Standard for Guangzhou Urban Environmental Project ........................................................................ 140 13.1 Compensation standard for land .................................... ...................................... 140 13.1.1 Compensation standard for land requisition (please see Annexed Table 13.1.1) ........ 140 13.1.2 Compensation for retracted land and free land (See Annexed Table 13.1.2 for details) 142 13.2 Compensation standardfor houses with property right ...................... ................................ 142 13.3 Other compensation standard ......................... ................................................. 144 14. Institutional structure of the resettlement and the ability building ............ ...................... 149 14.1 Resettlement organization plan .......................................................................... 149 14.2 Resettlement organization responsibility .......................................................................... 149 14.3 Resettlement organization ability construction ................................................................... 149 14.3.1 Resettlement organization improvement ................... ......................... 149 14.3.2 Application of URRP ....................................... 151 14.3.3 Training plan of resettlement work personnel ...................................... 152 15. Information disclosure plan ........................................... 154 15.1 Publishing of unfolded information ............................................ 154 15.2 Information publishing in the next stage ............................................ 155 16. Public participation and consultation ............................................ 156 16.1 Public participation and consultation activity already unfolded .156 16.2 Achievements of public participation and consultation activity .157 16.3 The plan of the public participation and consultation in the next stage .160 17. Monitoring and evaluation .161 17.1 Internal monitoring .161 17.2 Independent supervision .161 17.3 Schedule of the information publishing, public participation and consultation and supervision and evaluation ................................................................... 161 18. Cost estimate and fund plan of the project ...................................................................... 174 18.1 Description of project estimate .................................................................... 174 18.2 Compilation standardfor and explanation of pipeline estimation ............... ....................... 177 18.3 Project estimate ................................................................... 180 18.3.1 Total cost of the resettlement ....................... ............................................... 180 18.3.2 Sharing of the project resettlement cost ...................................................................... 180 18.4 Fundplanning ................................................................... 208 18.4.1 Explanation of fund planning ...................................................................... 208 18.4.2 Fund planning of the resettlement ...................................................................... 208 Dashadi Resettlement Implementation Plan 1. Introduction 1.1 Project summarization 1.1.1 Brief introduction of the project 1) Service scope of the project Dashadi Wastewater Treatment System Project is a sub-item of Guangzhou Urban Environment Project. In accordance with Overall Wastewater Regulation Planning for Urban Districts of Guangzhou, the location of this project has been enacted to the west of Wenchong Dockyard. The occupied area of the Project is 40 hectare. The planning service range of the Project shall be to the east of Chepochong Stream, on the west of Xiakang Avenue, to the south of Guangshan Road of Scientific City and to the north of the front sea-route of Pearl River. Its main objective shall be to collect the wastewater from Scientific City, Shenchong Stream and the drainage area of Wuchong Stream. Inside the treatment system of the Project shall include 8 zones, saying Lingtang, Dongpu, Wenchong and so on. The total planned population shall reach 946,500. The total coverage shall reach 107 sq, km. It is predicted that up to the year 2020, the wastewater collecting and treating rates and the facility using rate shall reach more than 90% and daily amount of the treated wastewater shall be about 500,000 tons. 8 Dashadi Resettlement Implementation Plan C 6D 3B~~~~~~~~~D 2A 3c j 4X 4C 4A 3 , bA~~~~~~~~~~~~~~~~~S 5 A a { /n t ou r A_ i /3D Fig. 1 Dashadi Wastewater Sub-area 2) Construction Content of the Project It shall include the land requisition for plant side, the construction of in-plant structures and the improvement of the network system of out-plant collecting pipeline. (1) Part of Plant Side It shall be located in the Wenchong and Shuangsha Communities of Huangpu District. The area of land use shall be about 40 ha. (597.77 mu), in which the area occupied by the construction of the treatment plant shall be 30 ha. and the area for virescence shall be 10 ha. (2) Off-plant Wastewater Collecting System The total length of the pipeline in off-plant wastewater collecting system shall be t 141.2 km, which belongs to the following five wastewater collecting zones: a. Dongpu wastewater collecting zone at the west; b. Eastern wastewater collecting zone; c. Dasha wastewater collecting zone; 9 Dashadi Resettlement Implementation Plan d. Ecological Island wastewater collecting system. 3) Construction progress of the Project Construction Progress Schedule of the Project Construction Work content Time plan period (d) 1. Formal evaluation of the World Dec. 2003 Bank 2. Engineering design (from confirmation of the Design Entity and Nov. 10, 2003-Nov. 11, 2005 733 perfection of construction drawings) 3. The project resettlement work (including the plant site and pipe Dec. 18, 2003-May 16, 2005 513 network resettlement) 4. Construction (from confirmation of bid agency to completion of pipe Nov. 3, 2003-Oct. 10, 2005 789 network construction) 5. Commissioning of the system Otc. 20, 2005-Dec. 25, 2005 67 6. Delivery for operation Dec. 24, 2005-Dec. 30, 2005 7 1.1.2 General situation of the project area 1.1.2.1 Brief introduction to the Project area The district in which Dashadi Wastewater Treatment System Project is located is Huangpu District, Guangahou. This district lies in the east of Guangzhou city and is located at the outlet interjunction of Pearl River and the down stream of Dongjiang River. The eastern boundary reaches Dongjiang River and looks over Muchong Town of Dongguang city. The northeast side borders on Xintang Town of Zengcheng City. The southern side arrives Pearl River and borders upon Panyu City. The western limit is connected with Dongpu Town of Tianhe District. Datian piedmont in the northern part is abutting with Luogang Town of Baiyun District. The largest O0 Dashadi Resettlement Implementation Plan harbor in the south of P. R. China-Guangzhou Harbor (formerly called Huangpu Harbor), Guangzhou Economic and Technical Development Zone and Guangzhou Bonded Zone are located in this district. The total area of this district is 121.7 sq. km. Total population is 203.2 thousands. In the district, the road has been arranged in a crisscross pattern and water and land traffics are developed. From this district, it launches out and navigates to all large coastal cities and more than 100 countries and districts. The highway runs through the whole realm and links with the center of Guangzhou City, Shengzheng and Jiulong. Along with the economic development and the population expansion, the capacity of the city environment shrinks relatively. Especially the former measures and facilities for environment protection lag behind, which results in the consequence that the environmental quality in the district where the Project is located in Huangpu District suffers from the serious pollution. In recent years, though the government more energetically fathered and controlled the industrial pollution, yet the treatment rate of the domestic sewage is still comparatively low. Every day, a great deal of the wastewater directly flows into the Pearl River via streams, which seriously polluted the streams in this district and furthermore bought the serious pollution to the Guangzhou section of Pearl Rive. 1.1.2.2 Pollution Status 1) PoUution state in the Project-related Area According to the Guangzhou Environmental Quality Report for the year 2000, the sectional water quality in sea-route section, Dongtouji and Lianhua Mountain of Huangpu District belonged to Grade IV, and has not reached the applicable standard for environmental quality (refer to the following Table I for particular information). Total level of the stream water quality in the district is relatively badly. The pollution indices for water quality of Machong Stream and Shixichong Stream is comparatively high (please refer to Table II for particular information), which belongs to the serious pollution. The pollution of other streams belongs to high-grade one. The condition of the pollution is as the following table: Table I: Grades for Sea-route Water Quality of Huangpu District in 2000 and "the ninth five-year plan" 11 Dashadi Resettlement Implementation Plan Year Dongtouji Lianhua Mountain 2000 IV IV Five-year Low- grade V Low- grade V Average Table II: Indices for Mainstream pollution of Huangpu District in 2000 and "the ninth five-year plan" Year Machong Shixichong Stream Stream 2000 6.18 3.77 Five-year 6.50 5.47 Average (The data of the above Tables II and I root in "Division Planning of Dashadi Wastewater Treatment System") Pollution in the creek 2) Pollution Reason 12 Dashadi Resettlement Implementation Plan (1) It is because of large quantity of city industrial sewage and domestic sewage. It is estimated that the discharging quantity of the industrial sewage of Huangpu District in 2000 reaches 40,957,000 tons, and that of the domestic sewage reaches 27,922,500 tons. (2) Due to the faultiness of sewage discharge and drainage system in Huangpu District, the capacity of sewage collection is poor. 1.2 Analyses of the economic environment of the project resettlement 1.2.1 Objective of the analysis of the economic environment of the resettlement (1) From analysis in Paragraph 2.4 of the Involuntary Resettlement Planning for Guangzhou Urban Environment Project-- Resettlement Policy, the social environment in Guangzhou City is very much compatible to the project affected people and is easy to accept those people; the economy in Guangzhou is developing very fast while the space for further development remains considerably prospective, which means more jobs will be available and the capacity for taking the project affected people is very strong; in addition, the social security and job security system in Guangzhou are considerably mature while the infrastructure is well developed too, which provides to the project affected people good space for living and development. Nevertheless, in order to be in a better position to protect interest of the project affected people and keep integrity of the original living area and social relations of those project affected people wherever possible, this Chapter will analyze the economic environment of areas where the sub-items of the project are, and based upon the analysis, the employment environment of project affected people and management environment of the enterprises will be analyzed. Thus the capacity of the project affected people to rehabilitate the living and sustenance under the specific economic environment of areas where the sub-items of the project are will be analyzed while the focus of the resettlement work for this project will be lodged forward. In this way, the resettlement plan and relevant measures made in "Resettlement Implementation Plan" for this project will be more feasible and the resettlement object will be realized more satisfactorily. Dashadi Resettlement Implementation Plan (2) This project will focus upon recovery of living and sustenance of those project affected people who are less qualified and who have less income. Because those project affected people who are considerably qualified and who have higher income have broad space to find jobs and their living adaptability is very strong, their living and sustenance will basically not be affected by the project affected people; on the contrary, the situation is just the opposite for those who are less qualified and who have lower income and poor skills (including those projected affected farmers). (3) This project will focus also upon rehabilitation of capacity for those small businesses and shops. As this project is for construction of pipe network, the work takes a linear (belt) character and will not cause overall resettlement of those big companies and government and social institutions but possibly to those small businesses and shops only who are involved with this project. In addition, those small businesses and shops are more easily to be affected by the management environment (the Project will also focus on resettlement of some enterprises and large entities affected by plant site requisition). 1.2.2 Socioeconomic characteristics of the project area The Project is located in Huangpu District, Guangzhou City. This district is an important base for industry and material circulation. The development of this district takes on the following characters: 1) High Industrial Output Value The industrial production of Huangpu District has comparatively been developed at all times. It is the largest industrial base of Guangzhou City. In 2002, the gross industrial output value of this district reached RMB 86,100,000,000, which accounts for 22.7% of gross industrial output value of the city. There are numerous industrial enterprises in the district. In 2001, the enterprise quantity of manufacturing industry in this district reached 679 numbers, which accounts for 23.68 % of total number of the enterprises in every industries of this district. 2) Developed Material Circulation This district possesses a fine basis for the development of material circulation the sea 14 Dashadi Resettlement Implementation Plan route of the largest harbour in southern China, Huangpu Harbour, opens to all over the world. Its loading and unloading capacity accounts for 70% of the gross loading and unloading capacity of all ports in Guangzhou City. The statistic data indicates that the amount of warehouse, transportation and post and tele communication industries and the quantity of the employed persons in these industries in 2001 occupied separately 12.56% and 11.17% of the gross quantities of all industrial units and the employed persons, and takes a leading position in the similar industry of the whole city. Huangpu District is re-positioned as International Material Circulation Park. In this district settles down many modern material circulation enterprises such as Southern Material Circulation, Guangzhou Suballocation Center of MAERSKSEALAND LTD, Zhongshenglian and so on, and the provincial and municipal important bases for material circulation and key construction project. 3) Developing Service Sector Due to more large-scale enterprises in Huangpu District, the adequate and systematic service for basic subsistence is comparatively complete. There are many industries set up by the village residents. Therefore, there is not a great requirement for the service industry in this district. It results in the lowness of the total level of the service sector development. In 2000 and 2001, the grosses of the service sector in this district are separately RMEB 7,490,430,000 and RMB 9,024,410,000, which only accounts for 30.88% and 29.14% of the gross domestic product (GDP) of this district, and lower than the average value of the city. 1.2.3 Analysis of the employment environment in the project area for the PAPs The characteristics of regional economic development decide the development direction and potential of trades in this district, and such direction and potential decide the development direction of various posts of every trade and the number of employment opportunities. Such economic characteristics of project area result in the distribution of low-income posts of various trades in the following table: 15 Dashadi Resettlement Implementation Plan Analysis on the Employment Situation of Low-Income Posts in the Project area Type of Trade subdivision Post Skills required by the post Applicab Quantity of Percentage of the Place of trade le employees (in employees in number populatio 2002) total population (totally 12 n of Guangzhou districts) City 1. 1. Food processing industry Packer and Relevant skills Young 8450 25.78% 1 Manufac 2. Drinking manufacturing industry Pipelining women 3730 27.61% 2 turing worker industry 3; Oil processing and coking industry Conveyance, No skill requirements for Mainly 5341 84.99% 1 4. Chemical raw materials and storage conveyance and storehouse young 10997 18.92% 1 product manufacturing industry management, management. Driving license is men with 5. Smelting and pressing of transport, required for drivers. Relevant strong 1761 21.64% 1 nonferrous metals pipelining skill is required for pipelining body 6. Transport and communication production production 19757 21.44% 1 facilities manufacturing industry 16 Dashadi Resettlement Implementation Plan Analysis on the Employment Situation of Low-Income Posts in the Project area Type of Trade subdivision Post Skills required by the post Applicab Quantity of Percentage of the Place of trade le employees (in employees in number populatio 2002) total population (totally 12 n of Guangzhou districts) city 2. 1. Civil engineering and construction Civil works, Relevant skills are required Mainly 22579 10.04% 5 Construc industry construction young tion 2. Line, Pipeline and equipment men with 6780 14.34% 3 industry installation industry strong body 3. Real Real estate management industry Entrance No skill requirement Mainly 1308 2.44% 8 estate guard, garage middle-ag manager, ed and securities young custody clerk, men 17 Dashadi Resettlement Implementation Plan Analysis on the Employment Situation of Low-Income Posts in the Project area Type of Trade subdivision Post Skills required by the post Applicab Quantity of Percentage of the Place of trade le employees (in employees in number populatio 2002) total population (totally 12 n of Guangzhou districts) City 4. All kinds of wholesale businesses Clerk No skill requirement Mainly 9461 4.99% 7 Wholesa middle-ag le ed and business young women 5. Retail All kinds of retail businesses Salesclerks Persuasive Mainly 3708 3.27% 8 business young women Dashadi Resettlement Implementation Plan Analysis on the Employment Situation of Low-Income Posts in the Project area Type of Trade subdivision Post Skills required by the post Applicab Quantity of Percentage of the Place of trade le employees (in employees in number populatio 2002) total population (totally 12 n of Guangzhou districts) city 6. All kinds of restaurants. Waiter and No special skill requirement Mainly 2479 2.42% 11 Restaura cleaner young nt & women beverage business Notes: 1. Total employees of each district [Unit: person]: the entire city: 3573132; Dongshan District: 374655; Liwan District: 166698; Yuexiu District: 231975; Haizhu District: 306620; Tianhe District: 470075; Fangcun District: 86806; Baiyun District: 491630; Huangpu District: 232679; Panyu District: 627192; Huadu District: 208530; Zengcheng City: 253618; Conghua City: 122654 2. The data are from Collection of the Second-time Census Data of Fundamental Units of Guangzhou. As census is carried out per five years and the last census was carried out in 2001, so the data in the table were counted at the end of 2001. 3. Some data in the table may be not correct, but they are the most authoritative data available for the project at present. 19 Dashadi Resettlement Implementation Plan From the analysis of the above table for the practice condition of low-income post in the area where the Project is located in, it can be seen that: (1) The manufacturing industry and material circulation industry in the district of this Project is developed. There are many kinds of such industries. It requires many medium and low grade of technical workers and simple-skilled labor force. Moreover, these required workers and labor force are mainly male youths, but the requirement for the labor force of women and meddle-aged men is comparatively low. Therefore, the Project shall pay much attention to: * Training of professional skill for agricultural workers; * Issue of women's job placement (especially those in single-parent family). (2) Whole development level of the service sector in Huangpu District is not high and the posts provided by service industry are comparatively few. 1.2.4 Analyses of the business environment for small businesses and shops in the project area Like the job placement of the project resettlement, the operation of the small businesses and shops is also restricted by local economic environment. Due to the above characters of the area where the Project is located in, the distribution status of the quantity of some industrial enterprises and shops in this district is as follows: 20 Dashadi Resettlement Implementation Plan Table for Quantity of Small Businesses and Shops in the Project Area Industrial Sud-list Enterprise Occupied Quantity Type Quantity Proportion in numbers of similar city all districts enterprises (12 districts) 1. Oil Product Manufacture 7 24.14% 2 1. 2. Raw Chemical Material and 108 8.39% 5 Manufacturing Chemical Product Manufacture industry 3. Drawing and Processing of 10 19.23% 1 Nonferrous Metal 4. General Mechanical 10 28.57% 1 Maintenance 5. Transport and Communication 139 9.54% 4 and Equipment Manufacturing Industry 2. Wholesale 1. Chemical Material Wholesale 92 8.03% 6 business Business 2. Metallic Material wholesale 43 7.98% 5 business 1. Foodstuff, Beverage and 33 1.68% 11 3. Retail tobacco retail business business 2. General Merchandise retail 90 3.62% 8 business 3. Metals, AC electric appliances, 137 3.57% 8 chemical product retail business 4. Restaurant 1. Snack 5 1.35% 9 & beverage 2. Refection 1 0.22% 9 business 5. 1. Bathing 9 7.44% 6 Neighborhood 2. Commodity Repair 6 2.20% 9 services 3. Household Service industry 3 4.84% 7 industry Notes: 1. Total number of units in different districts: the entire city: 108550; Dongshan District: 14436; Liwan District: 10851; Haizhu District: 12052; Tianhe District: 15315; Fangcun District: 3111; Baiyun District: 15013; Huangpu District: 4795; Panyu District: 11245; Huadu District: 4205; 21 Dashadi Resettlement Implementation Plan Zengcheng City: 5272; Conghua City: 3949 2. The data are from Collection of the Second-time Census Data of Fundamental Units of Guangzhou. As census is carried out per five years and the last census was carried out in 2001, so the data in the table were counted at the end of 2001. 3. Some data in the table may be not correct, but they are the most authoritative data available for the project at present. 22 Dashadi Resettlement Implementation Plan From the analysis of the above table for the quantity distribution status of small businesses and shops, it can be seen that: (1) Among wholesale businesses: Except for the chemical material wholesale stores and metallic material wholesale stores, the wholesale shops of other industries are comparatively few in Huangpu District. It is mainly determined by the character that Huangpu industry takes the manufacturing industry as predominance. Therefore, the affection of the Project shall involve in the resettlement of the wholesale shops outside industrial material, and the Project shall pay much attention to this issue. (2) Among the retail businesses: The retail business in Huangpu District is generally under development. The quantity of the retail shops in most industries is shorter than the average number of all districts in Guangzhou. It indicates that this district shall not greatly require the retail shops. Therefore, the Project shall pay much attention to the resettlement of small retail shops. (3) Among the restaurant & beverage business: There is a comparative low quantity of the eatery and beverage stores in this district, because the village resident occupies a bigger proportion in this district, their relevant substance space is relatively concentrated, their living styles are more stable and traditional and they do not require much snack and sale. So, the Project shall pay much attention to the resettlement of snack and sale stores. (4) In neighborhood services industry: Like the subsistence difficulty of the restaurant & beverage business (small stores), neighborhood services industry does have a great subsistence space in Huangpu District. So, the Project shall give the attention to that during the resettlement process. In summary, the Project shall fully pay attention to small stores of wholesale, retail, beverage and service industries. 1.3 Summarization of the project resettlement 1.3.1 Explanation of total quantity of resettlement involved in this Resettlement Implementation Plan This Involuntary Resettlement Plan involves a big number of resettlement for the reconstruction of the drainage pipe networks. Drainage pipes are normally laid down under the existing roads. Whenever there is a lay-down of any drainage pipeline under the planned roads or beside the un-cleaned creeks it will involve a big number of resettlement. Obviously, this resettlement shall be carried out when completing the road or embankment construction and it is unreasonable for a drainage pipe project to bear the resettlement for a whole road or whole creek. Therefore, the resettlement for drainage pipelines laid down along the planned roads or un-cleaned creeks which shall be taken as the resettlement 23 Dashadi Resettlement Implementation Plan caused by the construction of the planned roads or creeks but not caused by this project. Therefore, it is determined as the resettlement of the relevant projects. 1.3.1.1 Explanation of the data source of the first edition The first edition refers to the Involuntary Resettlement Plan submitted to the World Bank in November 2003. 1.3.1.2 Sources of the resettlement data of the first edition As the time of preparation work for the Project is long, so the investigation work of project affected people was carried out on Sep. 27. It is initially predicted that the investigation work will be completed in December, so most of the project affected people data in the Resettlement Planning are not from the field survey, but are confirmed through analysis based upon the geographic information system established by Guangzhou Municipal Planning and Design Institute and historical data collected by GZ Road Engineering and Expansion Office. The Data are as follows: * Resettlement data for Dashadi Plant Area are confirmed through investigation; * Resettlement data for Dashadi sewage pipe network are confirmed according to the data in geographic information system. Scope of land requisition, house demolition and existing pipeline relocation is confirmed according to diameters and buried depths of different sewers and scope of temporary land for construction is confirmed according to the working faces required by laying of pipes with different diameters (scope of temporary land requisition). Please see the following table for affected range of sewage pipe network:. Affected Range Range of affected Range of Range of temporary Range of land affected underground land borrow for \ ~~~~~~~requisition residents on Sewage pipe pipeline ts on construction the land network d<=500 D+2*500 d+2*500 D+2*1500 d/2+500+4000 500<d<= 800 d + 2 *1000 d + 2 * 700 D + 2 *2000 d /2 + 700 + 5000 800<d<= 1200 d + 2 * 1200 d + 2 * 700 D + 2 *3000 d /2 + 700 + 6000 1200<d d+2* 1500 d+2*800 D+2*3500 d/2+800+7000 Notes: (1) d refers to diameter of the sewer. 2 means the affected range will be extended to mm at the two sides. (2) Temporary land requisition only counts one side of central line of the pipe network close to central line of the road. 24 Dashadi Resettlement Implementation Plan 1.3.1.3 Instruction upon data calculation of various real estates affected for the sewage pipe network Scope for the land requisition, house demolition, pipeline relocation and temporary land requisition for the above-mentioned pipe network are indexed as per geographic information, with detailed calculating methods given below: (1) The data of land requisition and borrowed land include only the quantity outside the existing roads. (2) Calculation of the buildings a. The buildings will be decided to demolish completely or by a part only as per the proportion of the scope of the affected part of building against the total area of the original building. b. The property right of the building is presumed as per the area it is located together with the character of the building itself. c. The usage of the building is presumed as per its location together with the character of the building itself. (3) Number of people and households affected It is estimated as per number of buildings and the areas thereof while taking average area per head and areas of small businesses etc. for reference. Quantity of farmers is based upon estimation as per average land occupation per head. (4) Data of the existing pipeline As there lacks detailed data for precise budgetary estimate for the electricity and telecommunication in the GIS data for the existing pipeline, only normal presumption has been carried out. 1.3.1.4 Evaluation of the precision of the data for the project affected people in the first edition (1) The accuracy of the inventory quantity is acceptable. a. The summed data of the land requisition and borrowed land are considerably accurate, but the categorized data have certain error. b. The physical data and the actual data for the buildings are mismatched. Through partial site survey, such deviations shall be within the acceptable range as +20%. c. As some critical data for the pipeline are short, such as the basic property of the cable etc., the pipeline resettlement made this time has less precision. (2) Less accuracy of data for the project affected people As the data of project affected people are varying, the data for project affected people (quantity and 25 Dashadi Resettlement Implementation Plan households) this time has less accuracy. However, this does not affect the budgetary estimate of the resettlement cost. 1.3.2 Explanation of the sources of the resettlement data of the second edition 1.3.2.1 Sources of the resettlement data of the second edition 1. The data of Dashadi Plant site and pump station and the Solid Waste Treatment site were the same as that in the first edition without any change. 2. The scope of resettlement for the sewage network follows the calculation method used for the first edition. 3. Resettlement data of the sewage network including the real estates of the PAPs, the number of the PAPs and the number of the impacted households are all surveyed data. 4. Survey has done for existing pipelines. However since there will be many feedback information provided from relevant agencies the data of this part has therefore not been changed 1.3.2.2 Evaluation of the accuracy of the data in the second edition 1. The inventory data of the housings has been increased greatly compared with that in the first edition and the increasing rate of the classification of the nature of the property right is even greater. 2. The accuracy of the data has not been changed compared with the first edition. 3. The total number of the PAPs is basically determined. However, since the project is still at the planning stage and there is a number of uncertainties such as the alignment of the pipeline, any possible modification and the definite date of relocation etc. during the survey. Therefore, many potential PAPs gave the information of their households at discretion. Even with the help of the districts and neighborhood committees the data of the households are still incomplete. 1.3.3 Sources of the resettlement data of the third edition Data in the third edition was formed based on that in the second edition and based on the classification of the data for this project and relevant projects. 1.3.4 Update of the resettlement data 1. The resettlement data in this Involuntary Resettlement Plan have been comprehensively updated based on the data of the census. However, the data of the households and living status are still not exact. These data will be updated before the implementation based on the detailed data provided by the resettlement implementing agencies. 2. During the project implementation, all the fluctuation of the amount of the inventory quantity due to design change or the changes of the PAP's will be traced. 3. During the project implementation, the URRP system will be used to trace different kinds of 26 Dashadi Resettlement Implementation Plan changes of the resettlement data. 1.3.5 Total quantity of the resettlement The affected extent of the Project shall involve two administrative districts of Guangzhou City. Its length shall reach 141.25 km and produce a large number of the PAPs. In the land requisition, 920.21-mu land shall be affected for the works of Wastewater Project, temporary land requisition shall be 980.96 mu, the area of demolished houses shall be 322077.88m2, the length of the removed original pipelines shall be 185727m, total involved population of the PAPs shall be 11062 persons of 3030 families, and in addition, 1652persons of the agricultural worker shall also be involved. In which: 1. For this project The plant area of Dashadi Wastewater Treatment Works shall totally require 597.77 mu of the affected land, temporary land requisition shall be 0 mu, the area of the demolished houses shall be 75677m2, the length of the removed original pipelines shall be 66523m, total involved population of the PAPs shall be 820 persons of 42 families and in addition, 1220 persons of the agricultural worker shall also be involved. The pumping station No. 1.2 of Dashadi Wastewater Treatment Works shall totally require land requisition of 6.45 mu, temporary land requisition shall be 0 mu, the area of the demolished houses shall be 86m2, the length of the removed pipelines shall be Om, total involved population of the PAPs shall be 0 persons of 0 families and in addition, 9 persons of the agricultural worker shall also be involved. The pipeline network of Dashadi Wastewater Treatment Works shall totally require 73.66 mu of land requisition, temporary land requisition shall be 187.55 mu, the area of the demolished houses shall be 21459.77m2, the length of the removed original pipeline shall be 53545 m, total involved population of the PAPs shall be 942 persons of 278 families and in addition, 82 persons of the agricultural worker shall also be involved. 2. For relevant projects The pipeline network of Dashadi Wastewater Treatment Works shall totally require 242.33 mu of land requisition, temporary land requisition shall be 793.41 mu, the area of the demolished houses shall be 224855.llm2, the length of the removed original pipeline shall be 65659 m, total involved population of the PAPs shall be 9300 persons of 2708 families and in addition, 341 persons of the agricultural worker shall also be involved. 1.3.6 Characteristics of the resettlement 1.3.6.lQuantity of project affected people 1. Quantity of project affected people of this project Citizen household: 586 people of 200 households 27 Dashadi Resettlement Implementation Plan Merchandising business: 128 people of 35 households Industrial enterprises: 228 people of 43 households Commonweal units:2 households Rural area:1311 people 2. Quantity of project affected people of relevant projects Citizen household: 6781 people of 2128 households Merchandising business: 1322 people of 352 households Industrial enterprises: 1197 people of 228 households Commonweal units: There are not any such units found during the survey Rural area:341 people 1.3.6.2Proportion of the Building Quantities 1. Proportion of the Building Quantities of this project (1) By Usages of houses: Dwelling house: 16100.92 m2 Shops: 1125.91 m2 Office: 416.79 m2 Plant house and warehouse: 3816.16 m2 (2) By property right Houses with property right: 9700.13 m2 Houses built on residential plot: 7218 m2 Constructions without right of land-use: 3484 m2 Undue temporary construction: 533 m2 Due temporary construction and illegal structure: 525 m2 (3) By structure Frame structure 9681 m2 Composite structure 6566 m2 Brick and timber structure 3624 m2 Simple structure 1589 m2 2 Proportion of the Building Quantities of relevant projects (1) By Usages of houses: Dwelling house: 189166 m2 Shops: 11765 m2 Office: 4131 m2 Plant house and warehouse: 19794 m2 29 Dashadi Resettlement Implementation Plan (2) By property right Houses with property right: 79000 mr Houses built on residential plot: 108861 mr Constructions without right of land-use: 22744 mn Undue temporary construction: 4067 m2 Due temporary construction and illegal structure: 10184 m2 (3) By structure 2 Frame structure 122702 m Composite structure 64833 m2 Brick and timber structure 24850 m2 Simple structure 12365 m2 1.3.6.3Quantity of Affected Land and Explanation 1. Quantity of Affected Land and Explanation of this project For the project, except 597.77 mu affected land for Dashadi Plant Area and 6.45 mu affected land for the pumping station, other land requisition is the scattered one, saying on the pipeline network with the length of 141.25 km. The total amount of land requisition is 73.66 mu, that is to say 0.52 mu of affected land per kilometer. The cultivated land affected by the project is farthing. It shall be about 202.68 mu, accounts for 22.03% of the total affected land that shall be 920.21mu. The most affected land for wastewater treatment plant shall be the land used for the workshop (337.69 mu), in which the cultivated land only occupies 197.08 mu; 6.45 mu of the land affected for the pumping station is also the pre-cultivated land. 73.66 mu land affected for sewage pipe network and among which the quantity of the cultivated land accounts only for 7.6%(5.60 mu). 2. Quantity of Affected Land and Explanation of relevant projects For relevant projects, all land requisition is the scattered one, saying on the pipeline network with the length of 141.25 km. The total amount of land requisition is 242.33 mu, that is to say 1.7 mu of affected land per kilometer. The cultivated land affected by the project is farthing. It shall be about 26 mu, accounts for 2.8% of the total affected land that shall be 920.21mu. 242.33 mu land affected for sewage pipe network and among which the quantity of the cultivated land accounts only for 10%(35.92 mu) Obviously, the land requisition for the pipeline network of the Project shall be the scattered land requisition except for plant (site) area, and it shall slightly affect the agricultural production and subsistence. So, for the aspect of the land requisition, the Project shall mainly pay attention to the land affected for the plant (site). Dashadi Resetlement Implementation Plan 1.3.7 Estimation of the resettlement cost 1.3.7.1 Budgetary estimate of the resettlement for the Project (1) Dashadi Project * Wastewater treatment plant area and Pumping station area 206. 1 99,058.90 vuaiaI * Sewage pipe network 89 1.679.973.62V uian 1.3.7.2 Cost allocation for resettlement of the Project According to the spirit of the meeting on the sharing of the project resettlement costs held by Guangzhou Municipal and Gardening Management Bureau and attended by Guangzhou Construction Commission on 28 October 2003 (See Annex 1): Among the costs of the pipe network construction, the resettlement cost for the sewage pipe networks within the areas of planned roads and planned creeks will be borne by the relevant road or creek improvement projects (See Annex 6 for the cost arrangement for relevant projects) while the resettlement cost for those within the existing road and creek areas will be borne by this project. Based on this principle the resettlement cost to be shared by this project is 113,834,526.78RMB. The resettlement cost to be shared by relevant projects is 777,845,446.84RMB 1.4 Measures to be taken to minimize the quantity of resettlement: Relocation of buildings and existing pipelines is related mainly to the pipe network, and this decides that we can minimize the project affected people as well as damages to the existing pipelines through optimization of the route of pipe network. Quantity of permanently demolished houses is decreased by 23796.93m2. Please see the following table for details: Unit: m2 Before After Optimization Areas Reduced Optimization 228,191.68 192,784.84 23,796.93 For relocation of existing pipelines, through optimization of the specific construction proposals during the construction of the sewage pipeline construction, the pipe-jacking technology is adopted to minimize the quantity for pipeline relocation and reduce the cost for resettlement of infrastructure during the resettlement process (See Annex 3 for the proposal of optimization). We will make reasonable arrangement, such as to reduce the construction period, minimize the temporary resettlement cost for project affected people and reduce the closing period of the enterprises 30III Dashadi Resettlement Implementation Plan and shops. 1.5 Explanation of this Resettlement Implementation Plan 1.5.1 In obedience to the Resettlement Policy This "Resettlement Implementation Plan" is part of the "Planning for Involuntary Resettlement of Guangzhou Urban Environment Project" as well as the extension and details of the Planning for Involuntary Resettlement of Guangzhou Urban Environment Project Resettlement Policy" while it is also the specific execution proposal and standard prepared as per the principles set in the "Resettlement Policy". 1.5.2 Explanation of the chapter arrangement of the Resettlement Implementation Plan This Resettlement Implementation Plan is divided into 8 parts: resettlement analysis and its resettlement, compensation and rehabilitation plan, compensation standard for all kinds of properties and relevant costs, information publicity plan, public participation and negotiation, capability development of enforcement body, monitoring and evaluation, project estimate and fund plan. Among which, resettlement analysis and its resettlement, compensation and rehabilitation plan is separately described by types of project affected people, including description and analysis of resettlement investigation data, description of resettlement site (if necessary) and corresponding resettlement, compensation and rehabilitation plan. As the contents of commonweal and cultural relic are few and similar they are included in Chapter 9. This part is divided into 11 chapters. 1.6 Classification of the impacted areas of the project In urban resettlement project, the area the project affected people located will directly impact the compensation standard, so we divided the area into 6 types according to the local environment, surrounding facilities, traffic, economic development level, population, social environment and land utilization situation. We divided the larger district in the 6 types of districts into 2-6 regions according to road and stream marked with A, B, C, D, E and F for correct confirmation of the area the project affected people located and resettlement site. Notes: the number in IA, 3B and etc. refers to grade and the letter refers to region. Attached with: (1) Regional Grade Division Drawing for Huangpu District and Tianhe District (2) District Division Drawing for Huangpu District and Tianhe District Dashadi Resettlement Implementation Plan 6C 6D B S i~~~~~iI 3D~~~~3 SE 1.7.2)~~~~~~~~~~ SD 6 5A~~~~~~~~~~~~~~~~~B BA 6B 1.7 General list of the affected land and housings 1) Summary sheet for Land Requisition and Borrow in Dashadi Project (Table 1.7.1) 2) Summary List of Area Category of the People and Area Category, Property Right, Usage and Demolition Mode of the Houses Affected by Dashadi Project (Table 1.7.2) 3) Summary List of Number, Structure, Property Right, Usage and Demolition Mode of the Houses Affected by Dashadi Project (Table 1.7.3) 4) Table for Property Right, Usage, Demolition Mode and Distribution of the Houses Affected by Dashadi Project (Table 1.7.4) Dashadi Resettlement Implementation Plan 2. Status of the resettlement of the property owners and the compensation plan 2.1 Status of the resettlement of the property owners 2.1.1 Type and distribution of the permanently requested land 2.1.1.lType and distribution of the permanently requested land for Dashadi plant site and pump stations | The plant site and pump stations are located in Grade 4 area in Huangpu District and the type of the land is as follows: Dashadi plant site and pump stations Type of the land Quantity (mu) Vegetable land 117.18 Pound 12.50 Orchard 59.12 woodland Unapproved land use for plant site Wenchong Village 315.96 (agreiculture land) P-lant site Other agriculture Country roads 15.61 land Water conservancy 63.00 land Subtotal 583.37 Unapproved land use for plant site 14.40 Shuangsha Village (agreiculture land) Subtotal 14.40 Zhongsha Dadao Other agriculture land 3.75 No. I pump station Pump station Huangpu Dadao No. Other agriculture land 2.70 2 pump station Subtotal 6.45 Total 604.22 2.1.1.2 Type and distribution of the permanently requested land for Dashadi project pipe network 1 33[ Dashadi Resettlement Implementation Plan 1) Type and distribution of the permanently requested land Table 2.1.1.2.a Land for Distribution rate Cultivated Subtotal Cultivated construction (%) Grade I 0% Grade 2 - - 0% Land Grade 3 14,631.72 70,954.68 85,586.40 41% requisition Grade 4 890.50 37,719.26 38,609.76 18% Grade 5 11,904.72 69,215.71 81,120.43 39% Grade 6 1,089.82 4,252.96 5,342.78 3% Total 28,516.75 182,142.61 210,659.36 100% 2) Type and distribution of the permanently requested land borne by this project Table 2.1.1.2.b Grade of Land for Distribution area Cultivated construction -4 Subtotal -44-- rate (%) EA Grade 14 A 0.00 0.00 0.00 0% Grade 2- 4 0.00 0.00 0.00 0% UWAii-Land Grade 33 requisition 4 3,731.01 22,273.08 26,004.09 53% Grade 44 4 1 0.00 9,383.06 9,383.06 19% Grade ss- 4 265.59 12,773.20 13,038.79 27% Grade 66 4 172.33 506.38 678.71 1% Total 4t 4,168.93 44,935.72 49,104.65 100% 2) Type and distribution of the permanently requested land borne by other projects Table 2.1.1.2.c 44-Land Cultivated Land for Subtotal -4 Distribution rate Cultivated construction requisition . (%) i44 % Grade 144 0.00 0.00 0.00 0% Grade 2c4 0.00 0.00 0.00 0% Grade 34 10,900.71 48,681.60 59,582.31 37% Grade 4414 890.50 28,336.20 29,226.70 18% 34 Dashadi Resettlement Implementation Plan Grade 5 11,639.12 56,442.51 68,081.63 42% Grade 66- 917.49 3,746.58 4,664.07 3% Total 4. 24,347.82 137,206.89 161,554.71 100% 2.1.2 Type and distribution of the temporarily requested land 2.1.2.1 Type and distribution of the permanently requested land for Dashadi project plant site and pump stations There is not any temporarily requested land for Dashadi Plant site and pump stations 2.1.2.2 Type and distribution of temporarily requested land for Dashadi pipe network 1) Type and distribution of the temporarily requested land Table 2.1.2.2.a Grade of Landfor Distribution area _ Cultivated - conzstruction -4 Subtotal A4,t rate (%) g Grade 14 4 0.00 0.00 0.00 0% Grade 22 4 0.00 0.00 0.00 0% Land Grade 33 borrowing 38,070.31 240,462.42 278,532.73 43% Grade 44 4 2,602.69 106,952.20 109,554.89 17% Grade 55 4 42,582.04 206,509.51 249,091.56 38% Grade 66 4 1 568.78 16,227.44 16,796.22 3% Total 4 t 83,823.82 570,151.58 653,975.41 100% 2) Type and distribution of the temporarily requested land borne by this project Table 2.1.2.2.b Grade of Landfor Distribution borrowng area construction 4 Subtotal -'4* rate (') borrowingX Grade 14 4 0.00 0.00 0.00 0% 35~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Dashadi Resettlement Implementation Plan Grade 22 4 0.00 0.00 0.00 0% Grade 33 @t 6,900.54 60,697.21 67,597.75 54% Grade 44 @t 37.60 20,827.86 20,865.47 17% Grade 55 @t 7.73 33,407.31 33,415.05 27% Grade 66 @t 568.78 2,588.97 3,157.75 3% Total -4 1 7,514.65 117,521.36 125,036.01 100% 3) Type and distribution of the temporarily requested land borne by relevant projects Table 2.1.2.2.c Grade of Landfor Distribution Cultivated Lad o area construction 4 Subtotal -44* rate (%) EW Grade 14 4 0.00 0.00 0.00 0% Grade 22 4 0.00 0.00 0.00 0% Land Grade 33 borrowing 31,169.77 179,765.21 210,934.99 40% Grade 44 @t 1 2,565.08 86,124.34 88,689.43 17% Grade 5-5 @t 42,574.31 173,102.20 215,676.51 41% Grade 66 @t 0.00 13,638.47 13,638.47 3% Total 44 76,309.17 452,630.22 528,939.39 100% 2.1.3 Property right and distribution of the temporarily affected buildings 2.1.3.1 Property right and distribution of the buildings temporarily affected for Dashadi plant site and pump stations There are not any temporarily affected buildings for Dashadi plant site and pump station. Therefore, the issue will not be further discussed in Chapter 4 concerning the resettlement, compensation and rehabilitation of the temporarily affected PAPs. 36 Dashadi Resettlement Implementation Plan 2.1.3.2 Property right and distribution of the buildings temporarily affected for Dashadi pipe network 1) Property right and distribution of buildings temporarily affected tTA * * 4'DFfl4E Grade of area !A % of Total 4 property Property right Grade Grade Grade 33 Grade 44 Grade 5-5 Grade right i41. 144 22 6A tk6'J(k4 Housing with property right 0 0 7,271.21 1,553.98 9,238.71 107.50 18,171.40 34% Housing on residential plot 0 0 15,954.81 2,154.92 8,776.19 47.86 26,933.78 50% Historically used house 0 0 2,126.07 648.96 2,195.16 23.49 4,993.68 9% Temporary structure before expiration 0 0 303.99 0.00 451.00 0.00 754.99 1 % Temporary structure after expiration or illegal structure 0 0 746.88 1,010.87 535.07 383.36 2,676.19 5% Total 0 0 26,402.96 5,368.74 21,196.13 562.21 53,530.04 100% Distribution rate (%) 0 0 49% 10% 40% 1% 100% See Table 2.1.3.2 for the detail. 2) Property right and distribution of buildings temporarily affected and borne by this project ggt UE 1 f'lS lA W :4f Grade of area-44- % of Total 4 property right i'- Property right Grade Grade Grade 34 G Grade 4- 1 24- Grade4-64 GradeS4 6 Housing with property right 0 0 632.45 0.00 215.32 0.00 847.78 20% '7 Dashadi Resettlement Implementation Plan Housing on residential plot 0 0 2,595.01 0.00 0.00 0.00 2,595.01 60% Historically used house 0 0 386.06 33.27 248.41 0.08 667.82 15% Temporary structure before expiration 0 0 130.57 0.00 0.00 0.00 130.57 3% Temporary structure after expiration or illegal structure 0 0 85.00 0.00 6.39 0.00 91.39 2% Total 0 0 3,829.09 33.27 470.12 0.08 4,332.57 100% Distribution rate (%) 0% 0% 88% 1% 11% 0% 100% 3) Property right and distribution of buildings temporarily affected and borne by relevant projects JA5YL L J #p i Grade of area-4- % of Total property Total -4rghtet right ~- Property right Grade Grade Grade 3-3 Grade G Grade444 GradeS S a 1-4- 2-24 6 6 A Housing with property right 0 0 6,638.75 1,553.98 9,023.39 107.50 17,323.63 35% Housing on residential plot 0 0 13,359.80 2,154.92 8,776.19 47.86 24,338.77 49% Historically used house 0 0 1,740.01 615.68 1,946.75 23.41 4,325.86 9% Temporary structure before expiration 0 0 173.43 0.00 451.00 0.00 624.42 1% Temporary structure after expiration or illegal structure 0 0 661.88 1,010.87 528.68 383.36 2,584.79 5% Total 0 0 22,573:86 5,335.47 20,726.01 562.14 49,197.48 100% Distribution rate (%) 0% 0% 46% 11% 42% 1% 100% See Table 2.1.3.2 for the details. 3I Dashadi Resettlement Implementation Plan 2.1.4 Property right and distribution of partially but permanently affected buildings 2.1.4.1 Property right and distribution of partially but permanently affected buildings for Dashadi plant site and pump stations There are not any partially but permanently affected buildings for Dashadi plant site and pump station. Therefore, the issue will not be further discussed in Chapter 4 concerning the resettlement, compensation and rehabilitation of the partially but permanently affected PAPs. 2.1.4.2 Property right and distribution of partially but permanently affected buildings for Dashadi pipe network 1) Property right and distribution of buildings partially but permanently affected Grade of area -4^ % of Total property Property right A Grade 1- Grade Grade 34 Grade 4-4 Grade 54 Grade 6T tal right o 4- 2-2-4 4- 4- 4- A- t9(% Housing with property right 4:N;
Группа Всемирного банка · Resettlement Plan
China - Guangdong Pearl River Delta Urban Environment Project : resettlement action plan (Vol. 4 of 22) : Dashadi resettlement implementation plan
Открыть оригинал документа
Полный текст размещён на сайте публикующей организации. lawenc.com индексирует метаданные и ведёт на официальный источник.
Полный текст
Основные сведения
Организация
Группа Всемирного банка
Тип документа
Resettlement Plan
Страна
Китай
Источник
Всемирный банк