RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 E1018 V. 2 Three subprojects have been assessed through the proposed environmental framework. STEP 1 Based on the completed information, DAPSBA screened the proposed subprojects for their potential environmental and social impacts, compliance with national laws and norms, and compliance with Bank policies, using an environmental and social checklist. These checklists for each of the three sample subprojects are included below. Based on the checklist, each subproject was assigned an environmental category, consistent with the Bank environmental ratings. All subprojects were classified as B or below. No resettlement is foreseen nor indigenous peoples affected. STEP 2 Based on the information provided, each subproject was assigned a typology, reflecting the additional amount of environmental and social work, if any, required. The typology is defined based upon the nature and scope of the activity, the compliance with national law, triggering of Bank Safeguard policies, the adequacy of the environmental and social management plans, as well as the resulting environmental risk. Two of the subprojects are Type I, such that no additional environmental and social work is required. Puerto Carreño is Type II, although the only additional environmental/social requirement is to implement measures during construction to protect the water quality. STEP 3 The only subproject that triggers this step is Puerto Carreño, which has been required to include in its Environmental Management Plan the measures described above. FURTHER STEPS All subprojects will be required to implement the measures enumerated in their Environmental Management Plans. Monitoring will be the responsibility of the various actors and institutions as outlined in the framework. 1 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Honda Objetivo: Terminación de la conducción de agua desde la planta de tratamiento de agua potable. Se encuentran instalados 15.297 metros, realizados con recursos propios y quedan pendientes de instalación 3.076 metros equivalentes al 16.74% de la longitud total. El proyecto principal tiene licencia ambiental otorgada por CORTOLIMA (Resolución N° 2487 de 1997). Con esta licencia ambiental se consideran surtidos las obligaciones pertinentes contenidas en el Anexo Ambiental del MAVDT establecido en el crédito BIRF 7077-CO. Durante la construcción el anexo deberá ser tenido en consideración en lo pertinente. Es lineal de Tipo I (Anexo Ambiental del crédito BIRF 7077-CO) por tratarse de una complementación de una obra lineal en desarrollo, ejecutada en más de un 80% de la obra total; quedan 3.073 metros pro ejecutar, en superficie, básicamente interviniendo pastos. Las servidumbres se encuentran aisladas, Subsiste un peligro latente de contaminación para la Planta de Tratamiento: a menos de 100 metros hay se encuentra un depósito con cerca de 200 toneladas de DTT; el bajo riesgo, según la FAO, de esta amenaza, no debe demorar el subproyecto. Política Ambiental de Banco Mundial: tipo C por producir impactos mínimos, prácticamente despreciables y por el contrario, con efectos positivos para la población beneficiada. El subproyecto es ambientalmente viable, no se prevé mayor afectación por ruido durante la construcción ni durante la operación del suministro de agua y permite: • Solucionar al abastecimiento de agua potable. • Eliminar problemas de infiltración de aguas subsuperficiales al sistema de distribución contaminando el agua potable; daño en válvulas y en medidores, entre otros. • Empradizar y reforestar para estabilizar los taludes al pie de la bocatoma y evitar así deslizamientos. Para determinar la magnitud del problema es necesario adelantar un estudio especializado. • Utilizar el material de excavación y aplicar excedentes en superficie. • Utilizar materiales de préstamo del Río Gualí. • Destinar por parte de Honda el 1% del valor del proyecto principal, $25.833.550, en la recuperación, preservación y conservación de la Cuenca del Río Medina y el 1% del valor de sus ingresos durante quince años para adquirir áreas de importancia estratégica. 2 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Honda: Environmental and Social Checklist Yes or No Comments Administrative Criteria If applicable (based on Decree 1180 of 2003), Yes Honda project has EL under Decree 1753/94, attach Environmental License. but the portion to be constructed needs no further environmental procedure. When applicable, attach water concession (for No Administration ought to have Concession; the diversion or capture) or, for disposal, the project has no direct relation to capture works Discharge Permit (Permiso de Vertimiento) not to wastewater discharge. Are there other relevant permits or licenses? No Legal requirements do not foresee more Which? permits. Attach the certification of the responsible Yes To be presented before the MAVDT authority as regards location/construction permission as foreseen in the Plan de Ordenamiento Territorial (POT) The independent supervisor (interventor) has No MAVDT might fulfil this requirement certified that the subproject meets all obligations under the RAS 2000. The independent supervisor (interventor) has No For the type of works there is no need for such certified that the subproject meets all a certification obligations under NSR 98, where applicable. If the subproject requires land acquisition or No Rights of way are not needed since the land use of rights of way, there is legal evidence of belongs to municipality. land ownership and/or permission for land use by owners or a Resettlement Plan has been submitted. If subproject beneficiaries are indigenous No peoples, there are indigenous peoples living in the area of the subproject’s influence, or the construction of works will cross or impact an indigenous reserve, the Indigenous Peoples’ Plan is attached. The technical and financial obligations Yes Municipality has to comply only with required by the Environmental License obligations established in the Environmental (through the PMA), Resettlement Plan, and Licence. Indigenous Peoples’ Plan have been prepared and have been budgeted in the municipal budget. Monitoring and Evaluation Plan attached with Yes Plan has to develop acceptable indicators. acceptable indicators. Screening Criteria – Operational Policies OP 4.01 Will the subproject have significant No If “Yes”, a complete EA and prior review by or unique environmental impacts? See OP the Bank 4.01 in continuation, below. 3 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 OP 4.01 If the subproject will not have Yes If “Yes”, preparation of a Environmental significant impacts, will it have limited or site- Action Plan (EMP) which enumerates the specific impacts? See OP 4.01 in continuation, obligations defined in the concession and below. permission and prior review by DAPSBA. OP 4.04 Does the subproject have the No If “Yes”, a complete EA and prior review by potential to cause a significant change in a the Bank natural habitat or national importance (directly or indirectly)? See OP 4.04 in continuation, below. OP 7.50 Does the subproject appreciably No If “Yes”, a letter must be sent to affected change downriver water quality of an governments, per OP 7.50. international waterway? OP 4.37 Is any subproject located Yes If “Yes”, a dam safety assessment might be downstream of large, existing dams? required, per OP 4.37. Project (and city of Honda) is located some 210 km downstream Prado dam and some 330 from Betania dam. OP 4.10 Will indigenous peoples be affected No If significant, completion of an Indigenous by the subproject? In a significant way? Peoples’ Plan consistent with framework. OP 4.11 Are there known archaeological or No If “Yes”, consultations with the Colombian historic sites or other areas of cultural Institute of Archaeology and History (ICANH) patrimony in the area of influence of the and the preparation of a plan to address chance subproject? Is there are risk that the subproject finds. will damage or destroy physical cultural property? OP 4.12 Is there land acquisition or No If “Yes”, preparation of an abbreviated acquisition of rights of way? Resettlement and Land Acquisition Action Plan consistent with relevant framework. OP 4.01 Is the subproject vulnerable to natural No disasters (located in a flood zone, near a volcano, in an area of seismic activity, or on the coast and vulnerable to hurricanes)? Is there a risk that the subproject will modify No levels of subterranean waters by changing recharging patterns, pavement, or extraction? Could the subproject affect the quality of No ground water? Could the subproject affect the quality of No During construction there will be some fine surface waters, rainwater discharge, or material to be transported by rainfall while the through solid waste disposal? tube is placed and covered. No significants effects are expected. Will the project generate any hazardous waste No (such as sludge) which requires special handling and disposal? Could the subproject affect the quantity of No river, lake or catchment waters? 4 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Are there multiple users of the source of Yes Honda’s population will benefit from this potable water or body of discharge? water conduction project. Are there watersheds in the subproject area No Main project includes afforestation of Medina which require protection? basin although no water will be captured from this drainage. Are there known land use or tenancy conflicts No in the subproject area? OP 4.04 Does the subproject area include: protected areas; No areas with endangered species; No areas with [paramos]; No wetlands; or other areas of biological importance? No 5 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Los Patios Objetivo: Construcción del emisario final (830 metros lineales con 13 pozos), requerido para la futura PTAR proyectada. Tiene licencia ambiental. Es lineal de Tipo I (Anexo Ambiental del crédito BIRF 7077- CO). Políticas ambientales del Banco Mundial: Categoría B, ya que sus impactos ambientales de la ejecución del subproyecto son moderados y en general mitigables, ya que el trazado se encuentra por zonas intervenidas, con nula presencia de asentamientos humanos y como los terrenos pertenecen al Municipio, no hay actividades productivas para compensar ni servidumbres por imponer. Por tratarse de un colector (emisario final) de aguas negras que serán entregadas a una quebrada, el funcionamiento de la obra refleja impactos negativos1 si bien el balance final no es diferente a la situación actual. El curso de agua receptor del vertimiento no es utilizado directamente como fuente de abastecimiento de agua para la ciudad de Cúcuta pero desemboca en el río Pamplinita, fuente de esa ciudad. El emisario recogerá todos los puntos de vertimiento y los llevará a la futura PTAR: las quebradas que actualmente están deterioradas por los vertimientos dispersos, podrán recuperarse y, a mediano plazo, cesará el vertimiento sin tratamiento de aguas servidas al cuerpo de agua. La dificultad radica en que el Municipio no cuenta con recursos para la construcción de la PTAR. La obra permitirá al Municipio realizar la recuperación de la ronda de las quebradas. No se prevé afectación por ruido durante la construcción ni operación del suministro de agua. La tubería va enterrada y atraviesa terrenos del Municipio. El material de excavación será utilizado para cubrir la tubería y el excedente aplicado en superficie. Aunque no corresponde directamente a este subproyecto, la futura PTAR podría eventualmente generar problemas de olores. Se prevén conflictos con el propietario del sitio de recreación desarrollado en inmediaciones del predio donde se construirá la PTAR. La organización institucional es bastante compleja y puede estar generando ineficiencias, particularmente en relación con el alcantarillado. No es claro cuál es el nivel de calidad de agua suministrada en la población. La posibilidad de que se construya una PTAR dependen de la existencia de un sistema de alcantarillado que drene hacia un colector final. Esto justifica la realización del subproyecto asociado a la PTAR. 1 No se obtuvieron aforos de la quebrada en donde entregará el emisario, luego tampoco se puede dimensionar el impacto real sobre la misma, en particular frente a usuarios aguas abajo. 6 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Los Patios: Environmental and Social Checklist Yes or No Comments Administrative Criteria If applicable (based on Decree 1180 of 2003), No There is a Licence for the Waste Water attach Environmental License. Treatment Plant Project (WWPT) part of which will be this subproject. When applicable, attach water concession (for Yes Discharge Permit is part of the Environmental diversion or capture) or, for disposal, the Licence of the WWTP. Discharge Permit (Permiso de Vertimiento) Are there other relevant permits or licenses? No Which? Attach the certification of the responsible Yes To be presented before the MAVDT. authority as regards location/construction permission as foreseen in the Plan de Ordenamiento Territorial (POT) The independent supervisor (interventor) has No MAVDT might fulfil this requirement. certified that the subproject meets all obligations under the RAS 2000. The independent supervisor (interventor) has No For the type of works there is no need for such certified that the subproject meets all a certification. obligations under NSR 98, where applicable. If the subproject requires land acquisition or No Rights of way are not needed since the land is use of rights of way, there is legal evidence of public and belongs to municipality. land ownership and/or permission for land use by owners or a Resettlement Plan has been submitted. If subproject beneficiaries are indigenous No peoples, there are indigenous peoples living in the area of the subproject’s influence, or the construction of works will cross or impact an indigenous reserve, the Indigenous Peoples’ Plan is attached. The technical and financial obligations Yes Municipality has to comply only with required by the Environmental License Environmental Licence requirements. (through the PMA), Resettlement Plan, and Indigenous Peoples’ Plan have been prepared and have been budgeted in the municipal budget. Monitoring and Evaluation Plan attached with Yes Plan has to develop acceptable indicators. acceptable indicators. Screening Criteria – Operational Policies OP 4.01 Will the subproject have significant No If “Yes”, a complete EA and prior review by or unique environmental impacts? See OP the Bank 4.01 in continuation, below. 7 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 OP 4.01 If the subproject will not have Yes If “Yes”, preparation of a Environmental significant impacts, will it have limited or site- Action Plan (EMP) which enumerates the specific impacts? See OP 4.01 in continuation, obligations defined in the concession and below. permission and prior review by DAPSBA. OP 4.04 Does the subproject have the No If “Yes”, a complete EA and prior review by potential to cause a significant change in a the Bank natural habitat or national importance (directly or indirectly)? See OP 4.04 in continuation, below. OP 7.50 Does the subproject appreciably No If “Yes”, a letter must be sent to affected change downriver water quality of an governments, per OP 7.50. international waterway? OP 4.37 Is any subproject located No If “Yes”, a dam safety assessment might be downstream of large, existing dams? required, per OP 4.37. OP 4.10 Will indigenous peoples be affected No If significant, completion of an Indigenous by the subproject? In a significant way? Peoples’ Plan consistent with framework. OP 4.11 Are there known archaeological or No If “Yes”, consultations with the Colombian historic sites or other areas of cultural Institute of Archaeology and History (ICANH) patrimony in the area of influence of the and the preparation of a plan to address chance subproject? Is there are risk that the subproject finds. will damage or destroy physical cultural property? OP 4.12 Is there land acquisition or No If “Yes”, preparation of an abbreviated acquisition of rights of way? Resettlement and Land Acquisition Action Plan consistent with relevant framework. OP 4.01 Is the subproject vulnerable to natural Yes Los Patios is located in an area of rather high disasters (located in a flood zone, near a tectonic activity and low slope stability (mass volcano, in an area of seismic activity, or on movements risk). the coast and vulnerable to hurricanes)? Is there a risk that the subproject will modify No levels of subterranean waters by changing recharging patterns, pavement, or extraction? Could the subproject affect the quality of No ground water? Could the subproject affect the quality of Yes Project will conduct wastewaters towards a surface waters, rainwater discharge, or surface drainage (creek). During construction through solid waste disposal? there will be some fine material to be transported by rainfall while the tube is placed and covered. No significants effects are expected. Will the project generate any hazardous waste No (such as sludge) which requires special handling and disposal? Could the subproject affect the quantity of No river, lake or catchment waters? Are there multiple users of the source of No El Recreo creek is no water source for 8 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 potable water or body of discharge? population downstream. However, it discharges on Pamplonita River, water source of Cúcuta City. Are there watersheds in the subproject area No which require protection? Are there known land use or tenancy conflicts Yes A recreational business was placed next to the in the subproject area? waste water treatment plant reserved area; this might bring legal conflicts when the plant be constructed and operated. Notwithstanding, this fact represents no risk for the actual subproject. OP 4.04 Does the subproject area include: protected areas; No areas with endangered species; No areas with [paramos]; No wetlands; or other areas of biological importance? No 9 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Puerto Carreño Objetivo: Ampliación de los tanques existentes, sedimentador y almacenamiento, para garantizar la prestación del servicio durante las 24 horas del día. El contrato de concesión que rige SEPPCA S.A. ESP, incluye las cláusulas ambientales previstas preparadas para el crédito BIRF 7077-CO. Se encontró que se ajusta en forma aceptable, más no estricta, a las cláusulas. El subproyecto es ambientalmente viable, es Tipo II a la luz del Anexo Ambiental del crédito BIRF 7077-CO, no obstante tener un impacto ambiental absolutamente positivo en términos sociales y prácticamente nulo en términos ambientales, luego es viable desde este ánbulo. Política Ambiental del Banco Mundial: Categoría C. No tiene mayores implicaciones ambientales porque todos los trabajos se realizarán dentro de áreas que ya se encuentran construidas. Permitirá suspender la explotación del acuífero. Durante la construcción deberán preverse sistemas de protección que garanticen que no se afectará la calidad del agua que se suministra al municipio Dentro las obligaciones contractuales figuran la construcción de la PTAR y la construcción del sistema de alcantarillado que debe alcanzar una cobertura del 100% al cabo del año 20 de la ejecución del contrato suscrito con el Municipio2, actividad totalmente innecesaria que se ha acelerado durante el año 2004. Es deseable que se busque priorizar el proyecto de alcantarillado para detener la contaminación del acuífero. Los lodos extraídos de pozos y del sistema de alcantarillado requieren manejo cuidadoso. La empresa es un buen ejemplo de administración por sector privado. 2 Información suministrada por SEPPCA S.A. ESP. 10 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 Puerto Carreño: Environmental and Social Checklist Yes or No Comments Administrative Criteria If applicable (based on Decree 1180 of 2003), No attach Environmental License. When applicable, attach water concession (for No diversion or capture) or, for disposal, the Discharge Permit (Permiso de Vertimiento) Are there other relevant permits or licenses? Yes Construction license. Which? Attach the certification of the responsible No The subproject is in the place where the main authority as regards location/construction water infrastructure already exists. permission as foreseen in the Plan de Ordenamiento Territorial (POT) The independent supervisor (interventor) has No MAVDT might fulfil this requirement. certified that the subproject meets all obligations under the RAS 2000. The independent supervisor (interventor) has No MAVDT must verify and require to the ESP to certified that the subproject meets all fulfil this requirement. obligations under NSR 98, where applicable. If the subproject requires land acquisition or No use of rights of way, there is legal evidence of land ownership and/or permission for land use by owners or a Resettlement Plan has been submitted. If subproject beneficiaries are indigenous No peoples, there are indigenous peoples living in the area of the subproject’s influence, or the construction of works will cross or impact an indigenous reserve, the Indigenous Peoples’ Plan is attached. The technical and financial obligations No required by the Environmental License (through the PMA), Resettlement Plan, and Indigenous Peoples’ Plan have been prepared and have been budgeted in the municipal budget. Monitoring and Evaluation Plan attached with No Plan has to develop acceptable indicators. acceptable indicators. Screening Criteria – Operational Policies OP 4.01 Will the subproject have significant No If “Yes”, a complete EA and prior review by or unique environmental impacts? See OP the Bank 4.01 in continuation, below. 11 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 OP 4.01 If the subproject will not have Yes If “Yes”, preparation of a Environmental significant impacts, will it have limited or site- Action Plan (EMP) which enumerates the specific impacts? See OP 4.01 in continuation, obligations defined in the concession and below. permission and prior review by DAPSBA. OP 4.04 Does the subproject have the No If “Yes”, a complete EA and prior review by potential to cause a significant change in a the Bank natural habitat or national importance (directly or indirectly)? See OP 4.04 in continuation, below. OP 7.50 Does the subproject appreciably No If “Yes”, a letter must be sent to affected change downriver water quality of an governments, per OP 7.50. international waterway? OP 4.37 Is any subproject located No If “Yes”, a dam safety assessment might be downstream of large, existing dams? required, per OP 4.37. OP 4.10 Will indigenous peoples be affected No If significant, completion of an Indigenous by the subproject? In a significant way? Peoples’ Plan consistent with framework. OP 4.11 Are there known archaeological or No If “Yes”, consultations with the Colombian historic sites or other areas of cultural Institute of Archaeology and History (ICANH) patrimony in the area of influence of the and the preparation of a plan to address chance subproject? Is there are risk that the subproject finds. will damage or destroy physical cultural property? OP 4.12 Is there land acquisition or No If “Yes”, preparation of an abbreviated acquisition of rights of way? Resettlement and Land Acquisition Action Plan consistent with relevant framework. OP 4.01 Is the subproject vulnerable to natural No disasters (located in a flood zone, near a volcano, in an area of seismic activity, or on the coast and vulnerable to hurricanes)? Is there a risk that the subproject will modify No levels of subterranean waters by changing recharging patterns, pavement, or extraction? Could the subproject affect the quality of No ground water? Could the subproject affect the quality of No During construction some coarse or fine surface waters, rainwater discharge, or material might affect the water in the storage through solid waste disposal? tank if no especial attention is payed. No significants effects are expected. Construction debris should not be an environmental problem. Will the project generate any hazardous waste No (such as sludge) which requires special handling and disposal? Could the subproject affect the quantity of No river, lake or catchment waters? Are there multiple users of the source of Yes Water comes from the Orinoco River where 12 RESUMEN VISITA A 3 SUBPROYECTOS DE AGUA Y SANEAMIENTO PRIORIZADOS EN AUDIENCIAS PÚBLICAS 2004 potable water or body of discharge? low population uses this resource. Are there watersheds in the subproject area No which require protection? Are there known land use or tenancy conflicts No in the subproject area? OP 4.04 Does the subproject area include: protected areas; No areas with endangered species; No areas with [paramos]; No wetlands; or other areas of biological importance? No 13

Informations clés
Type de document Environmental Assessment
Date d'adoption
Pays Colombie
Source Banque mondiale