• INTERNATIONAL DEVELOPMENT ASSOCIATION 1818 H STREET, N.W., WASHINGTON D. C. 20433 TELEPHONE: EXECUTIVE 3-6360 IDA Press Release ..So. 71/27 Subject~ $7 .1 r.1illion credit for second power June 17, 1971 distribution project in Ghana An electric power distribution project in Ghana, designed to improve the e:dstinA distribution network and supply electric power to ne\-1 areas, will be asBisted by financinG totaling $9.3 million from the Federal Republic of Germany, the United !anr,dom and the International Development Association (IDA). The project represents a continuation of the ~,Jorld Bank Group's earlier associa- tion with the developnent of electric power in Ghana. Previous lending for the power sector includes a ~ank loan of $47 nillion in 1962 to assist the Volta River • !)am project, an IDA credit of $10.0 willion in June 1968 for pouer distribution, and ~ Hank loan of $6.0 million in 1969 to the Volta Eiver Authority (VRA) for pm·1er expnnsion. 'l'wo organizations, vr~~ and the Electricity Corporation of Ghana (ECG) nre responsible for providinc public services of power in Chana. ECG is a publ:l.c auton- omous corporation which is charced with recponsibility for general distribution of poucr and generation in areas that cannot be connected economically to the Vt~ systeo. ECG's distribution e~pansion program for the period 1971-73 responds toe tener- al increase in the demand for power, particularly for industrial usej and the ex- pected grouth of sr.iall and L1edium industries. The project provides for expansion of distribution in existing areas of supply and iMprovement of existing facilities» supplies to areas not previously served~ the • substitution of hydro-power for diesel power and the cost of engineerin3 and train- ing services. /more • IDA P.R •• No. 71/27 - Ghat1a - second power - 2 - ECG which is the beneficiary of the credit is responsible for execution of the projeict, and will be assisted by electrical and engineering consultants. The project is ex~ected to be completed by the end of 1973. ~he estimated total cost of the project is about $14.5 million, $4.4 million cf which r-- representing the local cost -- will be met by ECG. An IDA credit of $7 .1 mill:..on provides part of the total $10.1 million forei.gn exchange cost. . The Fedet . ~1 Republic of Germany through Kreditanstalt filr Wiederaufbau is contributinc to the foreign exchange cost with parallel financing equivalent to about $2.0 million. The Uaited Kingdom is providinG financing of ab~~t $200,000, and materials available in Ghana will account for another $D00,000. The IDA credit to the Republic of Ghana i,1ill be for a term of 50 years j in- • cludjug a 10-year grace period. It is interest free but carries a service charge of 3/ 4 of 1;l to meet IDA' s administrative expenses. The Government idll relend the px·oceeds of the credit to EGG at 7 1/ 4,~ interest, repayable in seven years, including a two year erace periodo - 0 - •
World Bank Group · Announcement
Announcement of Seven Million One Hundred Thousand Dollars Credit for Second Power Distribution Project in Ghana on June 17, 1971
View original document
The full text is hosted by the publishing organisation. lawenc.com indexes the metadata and links to the official source.
Full text